Tag Archives: Armstrong vinyl floor tile

2015/07/01 (W) Coach Supply Direct

We were up at 7 AM and left at 7:45 to drive to Coach Supply Direct in Edwardsburg, Michigan.  On the out of town we stopped at Teeko’s Coffee and Tea for coffee and bagels to go.  The coffee was single origin Kenya and was very good.  We drink half-caff at home so I will check with Jeff to see if this also comes in a decaffeinated bean.

We took I-96 west towards Lansing and then took the Lansing Road cutoff to I-69 south.  We exited at M-60 and headed west towards Three Rivers.  Our plan was to drop down M-40 to US-12 for the final run into Edwardsburg but M-60 was closed in Minden and the detour took us south on M-66 towards Sturgis.  We were about half way to Sturgis when the detour turned west back towards Three Rivers so we continued on to Sturgis where we picked up US-12 and continued our westward journey.  We stopped at the McDonald’s in White Pigeon for a second cup of coffee and then finished our trip to Edwardsburg.

Coach Supply Direct is located on Elkhart Road just south of US-12.  It was easy to find and Josh greeted us as we pulled in.  We looked at his Lambright fabric samples again and were just not finding exactly what we wanted so Josh suggested we check out the selection at Pro-Forma (?) on the southeast side of Elkhart.  They are a major supplier of surplus yard goods in the area and he often gets fabric from them for projects.  He offered to go over with us but we did not want to pull him away from his work more than we already had.  He called to let them know we were coming without him.

We took US-12 back east to M-217 and dropped into Indiana where the road becomes County 17.  Just before US-20 we turned west and about 1.5 miles later we turned south onto Hall Road and pulled into Pro-Forma’s parking lot.  Bob (the owner) was out but we found Mike back in the warehouse.  He took us to the room with the sample books and we looked at a sample of every fabric they had but did find anything even close to what we were looking for.  Bob returned from his errand run and we commented that apparently plain off-white upholstery cloth was out of style.  Quite to the contrary, he said it is very much in use and as a result there is very little, if any, surplus coming out of the Elkhart-based RV manufacturers.

I took a different route back to Edwardsburg, driving through Elkhart on some streets I had not driven before.  After talking with Josh some more we had him do a final estimate (quote), sans fabric selections, as follows:

  • Two (2) Flexsteel 529 Class C captain’s chairs with skirts, adjustable arm rests, 8.5″ swivel pedestal with 20″ seatbelt bar, tan seatbelt, and slide tracks.
  • One Flexsteel 591 Class A driver’s captain’s chair with skirt, adjustable arm rests, and power lumbar option.
  • One Flexsteel 591 Class A co-pilot captain’s chair with footrest, skirt, adjustable arm rests, and power lumbar option.
  • 15 yards of additional fabric TBD.
  • Seven (7) MCD Duo Shades with dark out fabric TBD.
  • An estimate of a 2 to 6 hours labor to install everything.

Josh converted the estimate (quote) into an invoice and Linda wrote him a check for the requested 50% deposit.  He then let us select Lambright fabric samples to take with us.  We removed six from the binder rings and also took one of his sets of MCD dark out material samples.  I had planned to stop and visit with Michele Henry at Phoenix Paint but had not told her that we were coming so she was not expecting us.  By the time we left for home it was 3 PM so we waved as we drove past her shop.

Linda had packed food for the trip so she ate her vegan yogurt and got out the grapes for both of us to munch on.  Instead of retracing our route from the morning I stayed on US-12 all the way to Coldwater.  By the time we reached I-69 I was hungry so I pulled into the Walmart.  I ate my yogurt in the car and then we went in to buy Snyder’s sourdough pretzel nibblers, Blue Diamond Wasabi Soy almonds, and some mini-strudels (apple and cherry) that did not contain any animal products (according to the label).  We got on I-69 going north and I exited at M-60 for fuel.

We got home around 6:45 PM.  UPS had delivered the order I placed yesterday with Amateur Electronics Supply so I brought that in from the porch and set it aside for tomorrow.  I opened one of the boxes of Armstrong floor tiles, removed a tile, took it to the bus, and set it on the floor in the kitchen.  We took the Lambright fabric and MCD dark shade samples to the bus and had an initial look at all of them together with the walnut woodwork, floor tile, and existing wallpaper (which is going to get replaced with something).  We left them to look at again tomorrow in better/different light and went in to have dinner.

Linda reheated the potato-kale curry leftovers and served some fresh watermelon.  I checked e-mail and responded to some that related to the SLAARC website.  We relaxed by watching two episodes of “First Peoples” on PBS and then went to sleep.  It was a long, tiring day with somewhere between 350 and 400 miles of driving and 7 to 8 hours of sitting in the car.  We were glad to have the chairs and shades ordered, and to have decided (for now) to go with the custom made sofa cushions, but we were frustrated by still having the fabric and shade materials undecided.  We told Josh we would have a decision by Friday so tomorrow will be final decision day.

 

2015/06/23 (T) Grounded

As I wrote in yesterday’s post we did not turn off the lights last night until almost 1 AM because we were keeping a close eye on the weather moving across the lower portion of Michigan’s Lower Peninsula.  Although strong to severe storms were still forecast from 1 AM to 5 AM they either did materialize at our exact location or we slept through them.  We had the house closed up and the air-conditioning on, so that cut down the sound level of outside noises.

A cold front had pushed through by sun up and we woke to a cool morning with blue skies and noticeably lower humidity.  We did not have any trees, or even big limbs, come down and there was no damage to our brand new roof.  The forecast yesterday was threatening enough, however, that in the morning we took the potted plants, and as much of our outside lawn furniture as we could find room for, inside including our sun umbrella and trash cans.  I planned to be gone most of the day, and Linda was leaving mid-afternoon to go to dinner and a movie with Diane Rauch, so our first chore was to put all the lawn furniture, plants, and other outdoor stuff back outdoors.

This week is mostly being devoted to ham radio with the ARRL Field Day as the crowning event this weekend.  My specific focus for most of the week, however, has been the “communications tower” adjacent to the east wall of our house.  As described in previous posts we installed a cable entry box (CEB), mounted the cellular booster in the basement, mounted the inside cellular antenna, and ran coax cables.  The antennas will (hopefully) be mounted on the existing 40 foot tower tomorrow, cabled into the CEB, and cables run from there to devices inside the house.  With any luck by the end of the day tomorrow we will have decent cellular service inside the whole house, the ability to watch OTA TV programs on two different TV sets, and finally be able to connect one of our radios in the ham shack to an antenna.  Today, however, was planned to mostly address other things.

I had an appointment with our dentist at 10:20 this morning and left at 9 AM.  I planned to stop at Chuck’s bus garage and check that the key he lent me worked, but I needed gas for my car.  I did not have time for both and did not really have a choice; I would have to check the key some other time.  I ordered two cables yesterday from Scott (AC8IL) at Adams Electronics.  Later in the evening I was unsure if I had specified the connectors correctly so I called and left a message.  I called again this morning to make sure the message got through.  It did, and my original connector specifications were correct.

I arrived at the dentist’s office about 10 minutes before my appointment time.  I called Rick Short at Isringhausen USA to make sure he was going to be in before I drove two hours to Galesburg, Michigan after my dentist appointment.  I got his voice mail a left a message.  “ISRI” makes very high tech air suspension driver’s seats that are used as original equipment in motorcoaches, semi-tractors, heavy equipment, and locomotives.  I would really like one for our bus, but it is not proving easy to get.

Dr. Steve and his assistant, Leslie, made molds of my upper and lower teeth and a bite impression.  The molds will be used to make a mouth guard that I can wear while I sleep.  Dr. Steve has a strong suspicion that I am clenching my teeth and the mouth guard will reduce or eliminate the irritation it causes.  I will have to ask if I can wear it during the day too as I am occasionally aware of clenching my teeth while I awake.

I had not heard back from Rick by the end of my appointment so I called the main number at ISRI and talked to the receptionist.  It turned out that Rick was not in today and she transferred me to Jeff Woodworth.  Jeff was willing to meet with me but thought it would be a better use of my time to wait until Rick was available.  My next opportunity to drive to Galesburg will be Thursday and I will likely go as the ISRI seat is holding up our ordering of Flexsteel seats through Coach Supply Direct.

I stopped for coffee and then re-routed for Chuck’s bus garage in Novi.  The key to the garage worked perfectly.  I called Linda to let her know about the change in plans and headed for home.  There is too much to do at the moment to waste much time so I installed the #4 AWG bare copper ground wire I bought yesterday at Lowe’s.  I mounted an offset copper wire lug using the center support stud for the copper back plane in the CEB.  I replaced one of the plastic hole plugs with a rubber plug with a small hole in the center.  The hole I chose in the bottom of the CEB allowed the ground wire to come straight up into the lug.

Another view of the cable entry box on the east end of the house by the 40-foot tower.

Another view of the cable entry box on the east end of the house by the 40-foot tower showing the bare copper ground wire that runs to the ground rod and then to one of the tower legs.

Outside the CEB I routed the ground wire around to the existing ground rod and secured it using the new clamp I bought yesterday.  There was an old ground wire connected from a clamp on the tower to the ground rod.  I removed that wire along with some coax and control wires that I had clipped when we removed the old satellite dish.  I then attached the new ground wire to the clamp on the tower.  While we were at it Linda trimmed back a small bush that was growing between the tower legs and I pulled leaves, grass and other stuff out from around the Day Lilies that we transplanted last year around the tower base.

With the CEB grounded we looked at how we might get a video cable up to the TV/monitor in our bedroom.  The wall where the TV is mounted has a hot water baseboard radiator that comes almost to the trim on the door wall.  That end of the radiator has a copper pipe that goes through the floor into the basement and it was easy to locate the pipe in the basement.  I determined that there was enough space behind the pipe to safely drill a hole but I had to drill it from the top side at an angle.  A 5/8″ wood boring drill bit created a hole just big enough for the molded F-connector on the end of the cable to pass through.

We fed the video coax cable above the suspended ceiling in the ham shack area to the location of the hole.  I then fed the cable up from the basement as Linda pulled it up into the bedroom.  We adjusted the amount of cable in the bedroom to allow the wall mounted TV set to move through its entire range of motion.  The other end of the cable was then routed into the sump pump room.

By the time we finished pulling this cable it was 3:30 PM and time for Linda to leave to pick up Diane.  They were headed to Royal Oak for dinner and a movie as the movie they wanted to see was only showing at the Royal Oak Main Theater.

While I was out during the morning Lynch Carpet had called to let us know our Armstrong vinyl tile was available for pickup so after Linda left I closed up the house and went to get it.  The 12 boxes of tiles, container of vinyl adhesive, and container of vinyl grout were all neatly arranged on a small pallet and tightly wrapped in shipping plastic.  Rather than break this down and load each thing individually they used a fork lift to set the pallet in the back of my Honda Element.  The rear suspension settled at least two inches when they transferred the full weight of the pallet to the floor of my car.

When I got back to the house I backed the car up to the garage.  I cut the shipping plastic loose and unloaded the tubs and boxes of tiles.  I put the pallet on the garage floor and then neatly stacked the boxes of tiles on it to keep them off the floor.  Each box contained 14 tiles measuring 16″ by 16″ for a total area of 24.89 square feet.  The Armstrong Alterna tiles are a “luxury vinyl” product, and are about 1/8″ thick.  Even so, the boxes were heavier than I expected so I decided to weigh one.  It tipped the scale at just under 42 pounds.  That meant the entire pallet weighed close to 500 pounds, and, ignoring the weight of the cardboard box, that is about 3 pounds per tile.

When I drew out the design I determined that I would need 158 tiles, some of which would be partial.  Figuring conservatively at 150 full tiles equivalent, and ignoring the weight of the underlayment, adhesive, and grout, the floor tiles will weigh about 450 pounds.  I have no idea what the carpet and ceramic tile that I have removed weighed but the tiles were heavy.  I also have no idea what the furniture weighed that we have removed but also have no idea what the new furniture will weigh.  The intent was that the new floor and furniture would weigh less than old stuff but we will see.

I traded phone calls with my dad and we finally got to talk for a half hour starting at 4:30 PM.  He turned 90 this past Sunday.  Mike Fearer from Bid-Rite Concrete called at 6 PM and arrived about 10 minutes later to discuss the foundation for our 70 foot ham radio tower.  I had printed off a page from the Universal Tower website showing their tower base.  I also downloaded and printed their base and tower installation instructions.  I had a set of these to give to Mike so he would have some idea of what the project is about.  We looked at the proposed location for the tower and access for his dump cart.  We also talked about the base, a rebar cage, a form around the top of the hole to allow the concrete to be slightly above ground, and a jig to make sure the base is level and the tower is plumb.

He said he was interested in the job and would work with me and Phil Jarrell (the excavator) to get it done.  Rather than bid the job he would just do it for time and materials.  He also said the current price of concrete was about $100 per cubic yard.  We will need about six (6) cubic yards to fill the required 5′ x 5′ x 6′ (deep) hole.  He thought he might be available the middle of next week but I don’t think I could have everything pulled together that quickly.

After Mike left I went to Lowe’s and picked up five 40 pound bags of topsoil, a 1-in/2-out signal splitter (rated for 5 MHz to 2.4 GHz), and a plastic snap cover channel for hiding the video cable we ran up into the bedroom from the basement for the TV set.  I then went to the Meijer’s supermarket just across Grand River Avenue for soy creamer but they did not have what I was looking for.  As long as I was there I had a salad for dinner at the in-store Subway.

While I was sitting there I called Mike Sharpe (W8XH) to confirm that he was available tomorrow to help with the antenna installations on our 40 foot tower.  I mentioned that the only thing I lacked was a standoff with a pulley at the end of it for hoisting stuff up to me.  He suggested that something like that was essential and I agreed, so I headed back to Lowe’s to see what I could figure out.  What I ended up with was a three foot long 7/16-14 threaded rod, a pulley that had a closed eyelet on top (and was big enough for the 3/8ths rope I bought), some 7/16ths washers, and some 7/16-14 nuts.

When I got back to the house I unloaded the topsoil near the part of the east yard that needs to be filled in, took the other stuff inside, and then assembled the threaded rod pulley system.  I secured the pulley on one end of the rod using two of the nuts, one on either side of the eyelet.  I threaded a nut onto the other end, put on two washers, two nuts, two more washers, and another nut.  I ran the first two nuts, with two washers between them, part way down the rod.  I left the second pair of nuts, with washers between them, near the end of the rod.

I took the assembly out to the tower and adjusted the position and spacing of the two pairs of nuts and washers so they would bracket two of the horizontal tower members.  In use I will secure the rod to the tower at each pair of nuts/washers using plastic cable ties.  This arrangement will put the pulley at least 18″ from the tower which should be far enough out that we can hoist the DB8e OTA TV antenna to the top of the tower without it banging into the tower or hanging up on something.  This antenna is the largest thing we need to hoist up. The old TV antenna is considerably larger and heavier, but it is coming down via gravity.

There was a message on our answering machine from Linda’s sister, Sr. Marilyn, who lives in St. Louis.  She was listening to the news earlier today about the storms that went through our part of Michigan and wanted to make sure we were all OK.  By the time we finished talking it was dark and I was done working for the day.  Linda called shortly thereafter to let me know she was on her way home and I mentioned the call with Marilyn.

I finally opened the box with the vertical omnidirectional outside antenna for the cellular booster system and discovered that I should have opened it sooner.  The mounting bracket was designed to be mounted to a vertical surface, such as the side of a house, not a tube, such as a tower leg.  I did not want to postpone tomorrow’s tower work so I will have to get up early and figure out a way to adapt the existing bracket so I can mount the antenna to the top of the tower.

My initial thought was that an aluminum U-channel of the correct size might solve the problem very nicely.  I could drill two holes in the bottom of the “U” to match the two holes in the bracket.  I could then drill three pairs of holes through the sides of the channel.  The antenna would be bolted to the bottom of the channel.  With the open part of the channel held against a vertical tube I could secure it with three long plastic cable (zip) ties.  Conceptually it should work and be easy to fabricate, but will take time which I won’t have a lot of in the morning.  We have to get the two coax cables from Scotty (AC8IL), drop off my car at Brighton Honda for its 100,000 mile service, and be back in time to have the mount fabricated and all of the antennas and tools ready to go by 10:30 AM when Mike shows up.

Linda got home at 9:45 PM, earlier than she thought she would when she left.  She and Diane ate at Luigi’s and had a very nice meal.  They also enjoyed the movie.  We had a big day on tap for tomorrow and we asleep by 10:30 PM.

 

2015/05/12 (T) Dealing with the County

I finally paid a visit this morning to the Oceola Township offices and talked to the assessor and zoning administrator.  I had a satellite image of our property on which I had drawn the proposed barn and driveway.  All they need in order to issue a land use permit is for me to show the size of the building and the setbacks on the image.  I also visited the Livingston County Building Department.  I talked to one of the counter clerks who had me talk to Rick, who is one of the inspectors.  He had just built a large pole barn and used 6×6 posts set in 26″ diameter holes back filled with concrete.  The bottom of the posts need to be at least 48″ below grade to get below the frost line so I will figure on posts four feet longer than my exterior wall height.

Based on my preliminary online research and visits the land use, building and electrical permits are the only other ones I will need in order to put up a bus barn.  The clerk gave me a check sheet of the documentation I will need to provide.  I would have to file some additional paperwork with the County Health Department, but would not need permits from them or from the Drain or Road Commissions.

I drove to the Township offices on Latson Road by way of Hacker and M-59.  Hacker was so bad the last few days due, in part, to heavy rains that it was more pothole than road and many of them were larger and deeper than normal.  The road grader was repairing the road and it was digging deep.  The grader was still working when I returned home but the road was already much better.  The road needs to be rebuilt with a substantial amount of road gravel and with proper drainage ditches along both sides.  Or paved.  Paved would be good.  Linda read something last fall that indicated Oceola and Hartland Townships had agreed to pave Hacker Road from M-59 south to Golf Club.  We checked when we got home this spring but could not find any reference to such a project.

Back at the house I settled in to create a scale drawing of the floor plan of our bus and then draw in the 16″x16″ floor tiles.  I added up the various areas yesterday and added 25% for waste, but that turned out to be a low estimate.  By drawing the tiles I was able to count how many I would actually need.  I called Lynch Carpet in Howell and talked to Clint to get a rough price estimate for the materials.  The 16×16 Armstrong Alterna Luxury Vinyl Tiles are packed 14 to a box and can only be ordered by the box.  We need 190 tiles for the project so we will have to buy 14 boxes (196 tiles).  That turned out to be 50 square feet more than my original estimate, but would leave us with only six full tiles as spares, assuming I do not ruin any during the installation.  Fortunately, the vinyl adhesive and vinyl grout were less expensive than I expected, so even with a freight charge the bottom line was similar to my first estimate.  Using these tiles it will be approximately a $2,000 project.

My layout has the tiles in a standard pattern with the grout lines lined up in two directions, one running parallel to the long axis of the bus and the other perpendicular to that.  I presumed that this would take less tile and require less cutting but after seeing the layout I am not so sure.  I will probably make a second drawing with the tiles turned 45 degrees and see if it makes more efficient use of the tiles.  We plan to use a grout that is very similar in color to the base color of the tiles so the grout lines will tend to blend in rather than standout as a design feature, and perhaps make the orientation of the tiles less important visually.

Later in the afternoon I called Pat at Apex Roofing to let him know our shingle selection.  I left the information in a voice message and Pat called back later to confirm.  We are going to use the Certainteed Max Def Resawn Shake shingle.  We are still thinking about the skylight tubes.  We talked about putting one or two in the living room and possibly one between the kitchen/dining rooms and one in the hallway.  I realized that the air-conditioner would probably be in the way of the one for the kitchen/dining area, so we will not do that one.

Linda made granola today and made baked/stuffed acorn squash for dinner along with an asparagus, carrot, green bean sauté and fresh sweet Bing cherries.  I took care of some e-mail and then we had slices of the Mother’s Day vegan cake.  I called my sister to check on how our grand-niece was doing.  She called me back later and we had a long chat.  Linda and I then watched season 2, Episode 2 of Sherlock.

After Linda fell asleep I was still up (writing) when a noise started and did not stop.  I suspected it was the water sanitizer recharging, as the water softener had recently recharged, but I got up to make sure that’s what it was and not something else like a sump pump that was stuck in the on position.  It was the sanitizer, so I closed the laundry room door to reduce the noise and went back to bed.  I really need to soundproof the laundry room and reprogram the softener and sanitizer to come on at better times.

 

2015/05/07 (R) Meshuggah Nuns

We spent part of last night researching a new refrigerator for the bus.  Possibilities included models from 13.5 cubic feet to 17 cubic feet from various manufacturers.  We found one that was a close match to the dimensions of our current unit, but we are thinking about downsizing to create space for a slide out pantry.

One huge disappointment is that all of the SunFrost models, including their 16 cubic foot unit, are 34.5″ wide.  Our refrigerator cubby is only 33-3/4″ wide and there is no easy/practical way to modify it to make it wider.  Although very expensive, the SunFrost units are super insulated and use 1/5th the energy of comparable capacity energy efficient refrigerators.  They are also available with 12 VDC or 24 VDC compressors, thus avoiding the inefficiencies associated with using the inverter when boondocking.

I spent some time measuring the floor and wall surfaces in the bus that are currently tiled or carpeted but did not calculate the area.  I need to do a drawing and put together an Excel spreadsheet as the bus has a lot of odd shaped spaces.

We drove to ABC Supply Co. in New Hudson to pick up samples of Certainteed Landmark Pro shingles.  We had narrowed down the possibilities to three choices but needed to see them next to our brick, siding, and trim.

On the way home we stopped at Lynch Carpet in Howell to return the Armstrong tile samples and determine delivery time, which was 2-3 weeks worst case.  We did not get a quote since I did not have the square footage figured out yet, but Clint made a note of the tile and vinyl grout we like.

We left the house around 4:15 PM and drove across M-59 to Rochester.  The Rochester Mills Beer Company restaurant was in downtown, about five miles east of the Oakland University campus and the theatre.  It was after 5:30 PM when we got to the parking lot.  We did not expect Kate before 6:30 PM so we ordered a hummus appetizer plate and two beers.  The hummus platter featured three different flavored hummus that were very good.  Linda had a chocolate coffee tasting dark brew and I had a Framboise.  Framboise is a raspberry beer that originated in Holland and tastes more like raspberries than beer.  Perfect!

Kate left work at 5 PM.  The drive from that part of town to this part of town is one of the worst in the Detroit area, and that is a terrible time of day to do it, but that is what she did because she did not have a choice.  She stopped for flowers and a card but made it to the Rochester Mills Beer Company in time to enjoy a pizza and some beer.  We had a no cheese veggie pizza with a whole wheat crust that was pretty good.  Linda had a different but still dark beer for her second serving while Kate and I both had the Wit’s Belgian style beer with orange and coriander.  Although much more beer-like than the Framboise, it was agreeable.  Except for some “guest beers” everything at the Rochester Mills Beer Company is brewed by them.  It is very local, very fresh, and very good as far as beer goes.  They also feature Michigan wines, which we always appreciate seeing in a Michigan restaurant, but we were not having wine this evening.

We made it to the theatre with only a few minutes to spare.  Kate got the tickets from will call as they were under her cousin’s name.  We had great seats in row D just left of center.  Meadow Book is not a large theatre and sitting this close to the stage made for a very intimate experience.  The playbill was the musical “Meshuggah Nuns.”  We were not familiar with this musical but it was delightful.  The 5-member cast were all professionals, including Cindy Williams (Shirley from the Laverne and Shirley TV show) and Eddie Mekka (Carmine Ragusa from the same TV program).  They all gave excellent performances but Jeanne Tinker, who played Sister Amnesia, was our favorite.  When dressed in a habit one really has to act with their face and hers was very expressive.  She also had the “comic” part in the cast and was very funny.

The show ended at 10 PM after which we visited briefly with Kate’s cousin, Mikeala, who is part of the theatre crew working with costuming.  We chatted with Kate a while longer in the parking lot and did not get home until close to midnight.

 

2015/05/04 (M) Moving Things Along

I had a list of things I wanted to accomplish today but did not get most of them completed.  I am trying to make purchasing decisions and get products and materials ordered so I can get some projects done and checked off my list.  It wasn’t a wasted day, as I gathered additional information, but it was frustrating to not get orders placed for things that I thought we settled items.

Based on a recommendation from bus buddy Butch I had decided to order a Cyclo 5 dual head orbital polisher.  I had looked at them before on Amazon but on closer inspection discovered that there is a Cyclo 5-Pro and now a Cyclo 5 Mark II and Cyclo 5-Pro Mark II.  The Mark II models are the current ones but much of what is for sale on Amazon are the previous generation.  Not only that, any one of them comes in three different configurations, two of which appear to duplicate one another.  I finally figured out that the Pro version has a variable speed motor.  The configurations have to do with the style of buffing pads and how they attach to the tool.  It turns out that whatever I get I can order the other parts if needed, so which one to order comes down to which pad attachment method I think best suits my needs.  That means more research before I place an order somewhere.

I have also decided to finally install a cellular booster system at the house and identified the TopSignal 5-band system as the one I probably wanted.  I have always been partial to Wilson Electronics, but the company has changed ownership in the last year and rebranded everything for the consumer market as WeBoost.  The redesigned “consumer” website is less informative than the old one and the company has been slower than other companies to bring products to market.  The model I would want is listed as “available soon.”

I called Cellular Solutions and talked to Paul.  They sell the WeBoost and TopSignal products but he steered me towards the SureCall Fusion5s, which is similarly priced to the TopSignal and more expensive than the WeBoost.  It is also a 5-band/multi-mode (3G/4G/LTE, etc.) transceiver so it will cover almost all cellular carriers including Verizon, without locking us into any specific carrier.  I was also going to call PowerfulSignal, who sells most of the same products, but there was no price difference based on the information I had and Cellular Solutions is a Michigan-based company.

We also need an Over-The-Air TV antenna so I started revisiting the website for AntennasDirect.com.  I spent some time looking at their website while we were in Quartzsite, Arizona but never ordered one.  One of the links on their website is to AntennaPoint.com.  This website shows the direction and distance to OTA TV towers based on your ZIP code.  It turns out that we have broadcast antennas in all directions but most of them are at ~104 degrees (Detroit) and ~270 degrees, plus or minus (East Lansing, Kalamazoo, and Battle Creek).  The ground rises to the west from our house so the Detroit metro stations will still be our primary ones.  Even so, the closest tower in any direction is 27 miles away and the farthest is 58, so we will need a serious antenna to pull these in.  (Antenna point.com only display towers up to 60 miles away but that covers everything we would care about.)

I have been trying to catch up and dispatch these kinds of lingering projects so I can work on plans for the bus barn and get started on our bus projects.  At this point I am no longer confident, however, that we will ever build a barn.  No matter what approach we take it is just going to cost more than we want to spend and it looks like dealing with the permitting process may be a hassle.  Added into this mix are several major projects on the bus, the need for a new roof on the house, and the need (desire) for a new car.  Ugh.

One of the bus projects is the remodeling of the seating in the front half of the coach.  As part of that project we want to remove the old carpet from the front and the bedroom and the black ceramic tile from the kitchen and hall, and probably the bathroom.  We did some online research and liked the look and quality of Armstrong Alterna Luxury Vinyl Tiles.  These tiles come in a 16″x16″ and a 12″x12″ size and a few of them come in 8″x8″.  From the website I determined there was a dealer, Lynch Carpet, close to us with an excellent selection of Alterna samples.

We made an errand run, stopping at the Howell Library to return a DVD, do some car research in Consumer Reports, and check out a few children’s books for Madeline’s visit tomorrow.  We stopped at the Howell branch of First Merit Bank to make a SLAARC deposit, and then drove to Lynch Carpet.  Clint worked with us and we took four samples to look at in the bus.  Once we saw them with our cabinetry the one we liked best was the La Plata Crème Fresh.  It has a faux stone, low luster, textured surface that is mostly off-white but has distinct milk chocolate brown veining.  I was thinking we would install the tile diagonally (as diamonds instead of squares) but that would probably result in more cutting of tiles, so more work, more time, more waste, and more cost.  The more I thought about that the more I liked the idea of a simpler layout, but that decision is far from made.

The rest of the day was filled with the usual things; a load of laundry, working at our desks, fixing/eating dinner, reading, games, and online research, the last three typically done on our iPads while curled up on the living room couches.