Tag Archives: Armstrong S-891 adhesive trowel

2015/09/03 (R) Floored

I turned the lights out at 11:30 PM last night so I was starting to wake up at 6:30 AM this morning and finally got up at 7 AM.  We have had light to moderate fog the last few mornings which always coincides with very still air.  It is a calm, quiet time to gaze out over our own personal “misty moors” and appreciate where we are and the lifetime of work that got us here.

Linda was still sound asleep so I closed the bedroom door to shield her from the noise of the coffee grinder.  That was probably unnecessary as she was sleeping with her good ear down, but I did want to wake her prematurely.  I ground up 8 scoops of the Cafe Europe (reg) / Columbian (decaf) blend which yielded nine scoops of grounds.  I have figured out over time that to make 9 cups of coffee takes about 10 cups of water as that quantity of grounds absorbs and holds almost a cup.  (These are 6 ounce coffee “cups,” of course, not real 8 ounce cups.)  More importantly the strength of the coffee seems to come out right.

Once the coffee was brewing I washed out the grinder reservoir and wiped out the grinder.  It seems to hold coffee grounds as if they were magnetic and being relatively fine particles they get into all of the small nooks and crannies.  Why a coffee grinder has small nooks and crannies is one of those product design questions that suggest the designer(s) never actually used their product for its intended purpose.

My main reason for getting up early was that it was no longer comfortable to stay in bed.  My lower right back has been sore for over a week now and is worse when lying down than when working, much of which has been on my hands and knees.  My secondary reason for arising early was that I wanted to get an earlier start working on the bus today.  We need to finish the dry layout of the vinyl tile floor today so I can apply the adhesive tomorrow, with Linda’s help, before we have Madeline for the weekend starting Saturday sometime.

I assumed my usual position on one of the living room sofas with our male cat, Jasper, at my right side, and quietly enjoyed my coffee while doing some online research and starting this blog post.  Speaking of which, I am now (once again) over six weeks behind in uploading posts to our blog.  By the time we are done working in the evening and have had dinner I need what little time and energy I have left to write the draft post for that day.  Uploading them is a whole different process that also takes time and thought.  I am determined, however, to be caught up before we leave for the winter and to post daily while we are away.  Being behind is not fun for me, and posts that are 4 – 8 weeks old are probably not interesting to anyone who might read the blog.

I need a very specific trowel, an Armstrong S-891, to apply the Armstrong S-288 vinyl tile adhesive.  As I mentioned in yesterday’s post, The Home Depot and Lowe’s do not sell this trowel or one even remotely similar.  Lowe’s did, however, have a plastic spreader that has the correct notch size and spacing.  Someone in the floor department at one of the stores suggested we try Blakely’s Supply in Wixom so I plan to call them this morning.  Don at Lynch Carpet in Howell, where we got the tile and adhesive, mentioned another place so I may have to call them back and get the name of the business.

We’ve had the tile since early July so we could have taken care of this a long time ago but didn’t.  As much as I tried to “work ahead” with respect to the design of the project, procurement of materials, and contracting with the cabinet maker we did not attend to everything in a timely manner.  Exhibit #1 is the wallpaper, which had a 2-week lead time, and exhibit #2 is this trowel.  Overall we have done well keeping things moving along and in retrospect this will look like a well-planned and smoothly executed project, but right now I need something that I don’t have.  🙁

I called Blakely’s at 8:30 AM.  They do not carry Armstrong products but they did have a trowel that matched the specifications of the S-891.  They had one in stock so I asked them to hold for me.  With the Labor Day weekend almost upon us we decided to drive to Wixom and buy the trowel before busying ourselves in the bus.

The round trip would have taken an hour but we went to The Home Depot in Howell before returning to the house and bus.  This particular Home Depot has a tool rental operation and we wanted to see if they had a 100 pound floor roller.  They did.  In fact, they had two of them; $22/day (24 hours).  If I call before they close tonight they will hold one for me to pick up in the morning between 6 – 8 AM.

By the time we got home we were finally a little bit hungry and had our usual breakfast of homemade granola with fresh blueberries and banana.  Thunderstorms were forecast for today so we brought the saber saw into the bus so we would not have to walk outside to the garage to use it.

We resumed working in the bathroom and got all of the tiles for that space measured, cut, and fitted into place.  We then continued from the hallway into the bedroom and up the front side of the bed towards the driver’s side of the coach.  It seems that our pace has slowed yesterday and today but that’s not really the case.  What has happened is that all of the pieces have to be cut, some of them along four or five lines that cannot all be scored and snapped, and we are working in a much more confined space that makes it difficult to make accurate measurements.

By 3:30 PM we were part way down the foot of the bed and decided to take a lunch break.  Linda made sandwiches on toasted rye bread with vegan deli slices, onion, tomato, and lots of power greens.  She chatted briefly with our son about arrangements for this weekend and then we got back to work at 4:30 PM.

The rain that had been forecasted for most of the day finally arrived but did not affect our work as we had everything inside that we needed.  We worked until 7 PM and finished the floor tiles in the bedroom.  That left five or six pieces to be cut at the front where the main floor and cockpit meet.  My sister called and I said I would call her back when we were done.  We figured it would take at least an hour to finish these pieces.  We were tired and hungry and decided to defer this work until first thing tomorrow morning.  We shut off the air-conditioners, turned off the lights, and locked the bus.

While Linda prepared dinner I cleaned the cat’s litter tray, checked my e-mail, and replied to one from BCM.  Dinner was fresh steamed broccoli, whole grain bread, and mock chicken with orange sauce.  Another Gardein product, the “chicken” was very tasty.

I called my sister back after dinner and we had a long chat which wrapped up just before 10 PM.  Linda and I went to bed and settled in.  I was finishing up this post around 11 PM when it started raining.  From the sound it was quite a downpour but it did not last even 15 minutes.

 

2015/09/02 (W) Dry Fitting

I turned the lights off at midnight last night so I was awake at 7 AM this morning and got out of bed at 7:15.  I fed the cats and then closed the bedroom door while I ground the coffee beans so as not to disturb Linda, who was still sound asleep.  I was having my first cup while finishing yesterday’s blog post and enjoying the company of Jasper, our male cat, when Linda emerged at 8:15, got a cup of coffee, and joined me.  Juniper, our female cat, was quickly in her lap.

Around 8:25 AM we heard a clap of thunder, which got the cats’ attention, and then it started raining.  Linda pulled up the weather radar on her iPad and there was a small but intense cell moving in our direction.  More thunder sent the cats scurrying for a safe hiding place but by 8:40 the storm had passed.

Having had a large, late supper last night we decided to skip breakfast and by 9 AM we were ready to get back to work on the bus.  Our goal was to finish dry fitting the Armstrong Alterna Luxury Vinyl Tiles by the end of the day.  We are at the point where we have placed all of the full 16″ x 16″ tiles so everything that is left has to be cut to fit.  In order to help make that possible I turned on all three air-conditioners and set the thermostats for 75 degrees F.

We started by cutting two pieces that had to follow rather intricate profiles, one by the right side of the refrigerator alcove and the other at the forward end of the kitchen cabinets.  We then filled in most of the edge pieces in the living room and kitchen, which is actually just one large space.  We continued down the hallway as we needed to “lock in” the locations of the tiles before moving into the bedroom.

We were finally a little hungry by noon so we stopped to have lunch.  Linda made a yummy fruit salad with strawberries, blueberries, peaches, and bananas blended with vegan blueberry yogurt.

Dry fit floor tiles viewed from the hallway looking towards the kitchen and living room.

Dry fit floor tiles viewed from the hallway looking towards the kitchen and living room.

After lunch we worked on the area at the rear end of the hallway where the entrances to the bathroom and bedroom are located.  Our original plan was to have the tile laid out with continuous grout lines but the reality is that the layout needed to be balanced and we needed to avoid tiny triangular pieces and skinny strips of tile.  After much deliberation and measuring we concluded that we would have to offset a tile as we came into the bedroom, placing the forward corner at the center of the adjacent tile edge.  We also had to employ a “slight of hand” by having a tile with other tiles on all four edges that was not, in fact, a 16″ x 16″ square.  It turned out to be 16″ by 14.75″ but that shape allowed us to maintain the grout lines. The difference is surprisingly subtle and I doubt that anyone will notice it.  Hopefully we won’t either after a while.

With those key decisions made we did an approximate fit past the end of the bed and around to the side at the rear of the coach.  Once we were satisfied that the tiles would lay out in a reasonable way along both sides of the bed and across the foot we resumed measuring, cutting and fitting the tiles from the hallway into the bedroom.

Cutting and fitting pieces has to be done with careful measuring and cutting and is slow work.  By 6:30 PM I no longer had sufficient light to work in the bedroom and it was clear we were not going to achieve our goal of finishing the dry fit today.  The lighting in the bathroom, which is mostly artificial, was good enough to keep working in there so we installed two more pieces.  One of them required us to remove a long narrow strip from an edge.  We used a hair dryer to gently warm the edge of the tile on the back side and then cut it.  It wasn’t exactly like cutting butter, but we were able to remove the narrow piece without using the saber saw.

By then it was 7 PM and we were done for the day.  We also wanted to have dinner before it got too much later.  Linda made a couple of large salads with all kinds of good things.  After dinner I started up my computer, checked e-mail, and replied to several.  I then drove to The Home Depot in search of an Armstrong S-891 trowel or something equivalent.  They did not have anything even close to what I needed so I went to Lowe’s. They did not have what I was looking for either but they did have a 4″ x 6″ plastic adhesive spreader that appeared to have the correct tooth size and spacing on one edge so I bought one.  It was $1.36 before sales tax.  (I probably spent that much in gasoline for the round trip.)

While I was gone Linda searched online for additional installation information and “how-to” videos.  She located the S-891 on Armstrong’s website so we finally knew what it looked like.  It’s a serious metal trowel with an open handle design and would be much easier to use than the plastic spreader.  If we had taken the time to deal with this on Monday we could have ordered one on Amazon and had it here tomorrow, but we didn’t.  I will probably call around in the morning and see if anyone locally has them.  If not, the plastic spreader will have to do.  I cannot wait until the middle of next week to glue and grout the tiles.

We watched an episode of Rick Steve’s Europe and then an episode of Music Voyager before going to sleep.