Tag Archives: amateur radio tower

20140911 (R) Rooted

After a breakfast of zucchini muffins and a banana (soft foods) I tried playing with the new RVillage mobile site on my Samsung Galaxy S III phone but I was unable to log in so I read a few blog posts.  We had gusty winds overnight after the rain cleared out so I checked the weather to see what might be headed our way today.  There wasn’t any additional rain in the forecast, but it looked like we would stay shrouded from the sun all day.  The wild turkeys were not put off by the weather and spent some time foraging back by the fire pit.  There were there long enough that I was able to get my good telephoto zoom lens on the camera and get this shot from the basement walkout doorwall.

These three adults and three young have been regular visitors to our yard of late.

These three adults and three young have been regular visitors to our yard of late.

My endodontics appointment was at 11:45 AM with Root Canal Specialty Associates in Brighton, Michigan.  Their offices are on Grand River Avenue just northwest of St. Joseph Mercy Hospital.  That’s only about five miles from our house; much more convenient than driving to Dearborn.  Although I have been having discomfort in both the upper and lower rear teeth on my right side, the bad tooth turned out to be one of the uppers.  Once they had determined that it needed a root canal I never even had to get out of the chair; they just seamlessly moved from diagnostic mode to repair mode.  Endodontic operations are very efficient.

They were done and I was on my way by 1:30 PM.  I stopped at Smead & Son just up the road to see if they could fabricate a rebar cage for our ham radio tower foundation.  They can, and they also sell Sonotubes if we decide to use one.  They stock diameters up to 36″ locally, and have tubes up to 48″ diameter at their Pontiac location.  They can bend the round horizontal sections, fold over the ends of the vertical sections, and supply the twist ties for tying the pieces of rebar together.  They even sell a special tool for twisting the twist ties.  The pieces would not be welded, but the assured me that twist tying them together is the standard way that rebar is held in place.  They can also supply the threaded steel anchor bolts if I decide to get them locally.

My next stop was Staples in Brighton for a new touch screen stylus/pen.  I ended up getting a Wacom Bamboo stylus with no pen, and a Logitech Bluetooth keyboard to pair with my iPad2.  I create the rough drafts of all of my blog posts on the iPad, and I should have gotten a keyboard a long time ago.  I also picked up a sympathy card for a friend and co-worker of Linda’s whose father just passed away.

I stopped at Dunkin Donuts on the way home and got some hot apple cider but could not drink it right away as the local anesthetic had not yet worn completely off and I dribbled every time I took a sip; not a pretty sight.  Back home I took my 3 PM dose of Tylenol.  I will be taking Ibuprofen every six hours for the next 24 hours and also taking Tylenol every six hours spaced halfway in-between the Ibuprofen doses.  Between the anesthetic wearing off and the apple cider cooling down I was finally able to drink it in small careful sips.  I unpacked the wireless keyboard and got it connected to my iPad2 and used it to finishing typing this post.  The keyboard comes with a case that turns into a stand that can hold my iPad2 at two different angles in each of portrait or landscape position.  All-in-all a very nice little package.  I have generally been very happy with Logitech products over the years.

I wanted to play with the RVillage mobile development site but still could not get logged in.  On a suggestion from Linda I figured out how to tell my Samsung Galaxy S III phone to NOT remember logins for websites and was finally able to login and navigate around.  The initial login was a 2-step process and my phone was automatically providing the username and password for step 1 even though I was manually entering the information for step 2.  Once I was in I joined a test group, replied to a topic post, created a new topic and made an initial post.  I also replied to a message, searched for two members of the development team, and sent messages to each of them with some site feedback.  Based on our limited testing of the site it appears that the development team has done a great job on the mobile version.

Linda made a barley, kale, white bean stew for dinner.  She has made it before and it is a wonderful blend of tastes and textures.  Besides the named ingredients, it included onions, garlic, mushrooms, and tomatoes.  For dessert she made apple crisp.  Apple cider and apple crisp in the same day; nothing says “fall” like apples.

Butch called to bring me up-to-date on their situation regarding the transfer of parts from their business in Indiana to the buyer in Nevada.  It looks like the 53′ trailer won’t be there to pick up material until the 29th of this month but I could take our bus there any time after the 18th, when their younger daughter (Brittani) is getting married.  And once our natural gas situation is resolved.  As of this writing we have no idea when they will run the line to our house and hang the meter.  The only date we have ever been given was project completion by September 26.

 

2014/08/15 (F) On The Level

I got dressed this morning for physical work, but ended up doing very little.  I worked at my desk most of the morning, including working through the first chapter of the Intro to Linux course on edX.  I came up from the basement to have lunch at 12:30 PM after which I moved my car out of the pull-through driveway.  I then started the bus and, with Linda’s assistance, backed it out of the pull-through driveway, drove it the short distance to our straight driveway (which ties into the other end of the pull-through driveway), pulled it up onto the concrete driveway as far as it could go, and parked it.  The concrete driveway runs uphill from the road to the garage and, not knowing how long it might be there, I lowered the front end and raised the back end; not enough to level it but enough to make it better.  Linda chocked the drive tires while I hooked up the electrical shore-power.  The front bay had gotten water in it from the recent rains so we opened all of the bays to let them air out while Linda soaked up as much water as she could with a couple of old towels.

Spreading 21AA road gravel to fix the driveway.

Spreading 21AA road gravel to fix the driveway.

I got out our 8′ step ladder and pole saw/lopper to prune some large (1 – 2 inch) dead branches that were hanging over the pull-through driveway where the rear end of the bus normally sits.  I no sooner started this work when Phil from Precision Grading showed up right on time with his dump truck, tracked front-loader, and rolling compactor attachment to repair the damage done to the pull-through driveway by the recent landscaping work.

Phil off-loaded the front-loader from the trailer and then disconnected the trailer from the dump truck.  He had a small load of 21AA road gravel (with lots of fines) that he dumped in two different spots in the pull-through driveway.  He then put the truck back in the street and set up his laser level to see just what he needed to do.  He used the front loader to move the gravel around and distribute it evenly and finished by back blading it with the bucket to level it.

Rolling and compacting the driveway.

Rolling and compacting the driveway.

Once he had the gravel the way he wanted it, he removed the bucket and attached the vibrating roller/compactor.  He went over the driveway several times, always making his final pass going backwards while pulling the roller to smooth out the tracks created by the machine’s drive treads.  The roller/compactor worked the fines down into the base and by the time he was done the driveway looked and felt tight; even better than last year when Phil did not yet have this attachment.  The machine also shook the entire house, especially the rear deck which is mostly supported by tall 6×6 and 4×4 posts.  He indicated that we did not need to wait for rain, or anything else, before putting the bus back in its spot, so after he left that is what we did.

But before Phil left, he used his laser level to check the grade in the back.  Although it does not appear to the naked eye to drop very much in the first 70 feet, the laser level indicated that there was a steady down slope over that distance with a total drop of over 1 foot.  He checked all the way to the edge of the cattails marsh, at which point the ground was down 4-5 feet from the deck.  The surface of the neighbor’s pond looks to be at least two feet lower from there.

The compacting roller really makes a difference.

The compacting roller really makes a difference.

There are several implications to this.  For one, it means the surface of the pond is well below our basement slab (6 – 7 feet) and at least 2 feet below the bottom of the footings for our house, so it is probably not the source of the water that runs into our sump.  It also means there is adequate grade to allow surface water to run off once the grass grows in (although it would be better if there was more grade than there currently is in the first 50 feet).  Equally important, the grade is more than adequate for a very effective French drain should we decide to have Phil pull up the existing drain lines and replace them.  Finally, having a hole dug at least 8 feet deep for the ham radio tower base should not pose a problem as the starting elevation is at least 6 feet above the basement slab.

With regards to the tower base, Phil suggested that I have the rebar cage, mounting bolts, and alignment structure built ahead of time and ready to go.  He could dig the hole first thing in the morning with his mini-excavator (up to 8’ deep) and figured it would only take an hour at most.  The assembled rebar could be positioned, plumbed, and secured in an hour or so, and the concrete could be delivered and poured in the late morning.  He indicated that spreading the work out over more time than that, especially letting the hole sit overnight, was not a good idea

Close up of the compacting roller attachment.  This thing shook the whole house!

Close up of the compacting roller attachment. This thing shook the whole house!

We discussed how to get the concrete into the hole given its location about 40 feet northeast of the northeast corner of the house.  Our two options appear to be the little dump carts or a pumper.  The carts would have to drive up the east side of the house between the house and the septic tanks, but Phil thought that would be OK as long as they put down plywood to drive on.  He said a pumper truck would be very expensive but that a separate pump is available that can be towed to the job site.  With that equipment the concrete mixer truck would simply unload the concrete into the pumper, which would then pump it to the hole.  Both the truck and the pumper would be in the east end of our pull-through driveway.  Phil suggested that I call Carl Russell in Byron, Michigan as he is a good concrete guy and probably has a concrete pump.

After Phil left we reversed our earlier steps and moved the bus back into the pull-through driveway.  It rolled right up onto the level pad area and did not leave any noticeable tire tracks.  Nice.  We hooked up the “50 Amp” shorepower cable, turned off the chassis batteries, checked that all of the battery chargers were working, and shut/locked everything.

While Phil was working, Linda went to the Howell Library to return children’s books and came back with a card for the Howell Melon Festival.  The Festival started today and runs through Sunday.  She wanted to go walk around so we skipped dinner and headed out around 5 PM.  At the first turn in our road we encountered two workers from Roese Construction.  They were working on installing the natural gas main line down the street and said another crew would be coming along behind them in 1 – 2 weeks doing the branch runs up to the meters on the houses.

The Howell Melon Festival was just getting started when we got there but parking was already at a premium.  We parked a few blocks away in an empty church parking lot.  Some of the smaller side streets were already blocked off but Grand River Avenue and Michigan Avenue were both still open to traffic.  They will be closed tomorrow and Sunday and filled with vendor booths.

The weather was perfect and all of the downtown restaurants were very busy with lots of outside seating.  In the 16 months we have lived in the new house we have never really visited most of the downtown Howell merchants.  We went into Country Squire, a business that sells fireplace logs and inserts as well as outdoor cooking grills.  They had a couple of natural gas fireplace logs that were 99%+ efficient and did not require the flue to be open.  We thought they were a bit pricey but they were actually capable of heating a room.  We don’t use our existing propane logs because they are mostly decorative and require the flue damper to be open, which just wastes fuel and money.  The Country Squire also had a couple of natural gas grills that would mount to our deck and attach to our existing quick disconnect.

We walked through the food vendor area but did not see anything that interested us.  After walking past the starting gate for the Howell Melon Run we ended up at Uptown Coffee, on the northeast corner of Grand River and Main, where we had some brew and Sabra hummus with pretzel chips.  We started back towards our car and paused at the Old Courthouse long enough to hear the first number by the band.  They sounded good and not too loud.  We had our folding camp chairs in the car but decided to pass on the concert.

We stopped at Walmart on the way home to buy a microwave popcorn popper bowl and stock up on flavors of ICE brand sparkling flavored water.  Meijer’s sells a few flavors but Walmart has the broadest selection, including my two favorites (pineapple-coconut and blueberry-pomegranate).  Our final stop was at Lowe’s for a 100-pack of bright orange marker flags.  I will use these to mark the powerline that runs under the driveway to feed the RV outlet, the propane line to the house, the drain pipe from the corner of the house into the first septic tank, and the drain pipe that connects the outlet of the second septic tank to the beginning of the drain field.

It was a long day but a good one.  We watched another episode of Doc Martin and then called it a night.