Tag Archives: air-conditioning (house)

2015/06/16 (T) More Stupid

Linda was scheduled to go to the bakery this morning but rescheduled to tomorrow due to last night’s weather forecast and the possibility of flooded highways in Detroit.  The morning rush hour traffic is bad under the best of conditions and flooded roadways can make it near impossible.  She also did not sleep well and woke up tired.

The Apex roofing crew started showing up just before 8 AM and the Wimsatt truck showed up with the shingles a little after 8 AM.  They brought a conveyor truck this time and were able to get the shingles off the truck and onto the roof without difficulty.  The Apex crew did not waste any time getting to work.  It turned out to be a great day for roofing; clear skies, no rain, moderate temperatures, lower humidity, and some breeze.  Even so, it is work that is done without the benefit of shade and roofs are hot places to work even on the nicest of days.

Wimsatt unloads shingles onto the garage roof.

Wimsatt unloads shingles onto the garage roof.

Linda continued working on the financials for our amateur radio club while I checked my e-mail.  I had a reply from RV Critter Guard telling me what to order and how much it would cost.  I placed the order through their website and used PayPal to complete the transaction.  I tried calling the concrete contractor that Phil recommended (Bid Rite Concrete LLC in Whitmore Lake) but the phone would disconnect after the first ring and revert to a dial tone.  Perhaps the recent storms caused a problem but I e-mailed Phil to see if he had a different number for them.  I called the Henry Ford Medical Center in West Bloomfield and made dermatology appointments for myself and Linda.

With all of that taken care of I turned my attention to the bus.  The toilet is a Microphor LF-210.  It uses pressurized air to operate the waste valve and the water valve and to help push the waste through the drain pipe and into the black tank.  To remove the toilet I had to undo three connections—air, water, and waste—and take out the four screws securing it to the floor.  If only it was as easy as that makes it sound.

The plumbing at the back of the Microphor toilet in our bus.

The plumbing at the back of the Microphor toilet in our bus.

Undoing the air line was easy and undoing the water connection only a little less so.  The waste connection was another matter.  The 1.5″ black plastic drain pipe was routed from the water bay through the floor and into the HVAC chase that runs along the driver’s side of the coach.  The converter, Royale Coach, brought it out through a hole in the wood that covers the chase, making it impossible to take the wood cover off.  The pipe then made two right angle bends, the first one towards the floor and the second one towards the back of the toilet.  The waste pipe was connected to the toilet discharge pipe with a length of rubber hose and a compression sleeve.

The toilet has a large hole in the back for all of these lines to pass through to the inside where they get hooked up.  It should have been a simple matter to slide the toilet away from the wall/chase but the last bend in the drain line was below the top edge of the bottom of the hole, preventing it from coming out.  After wiggling the toilet enough to get the rubber hose loose from the drain pipe I was able to lift the drain pipe just enough to slide the toilet out.  I took pictures for a possible BCM article on our interior remodeling project and then Linda helped me move the toilet out of the bathroom to the front of the coach.

The more I disassemble this coach the more stupid I think the design and construction of its systems are.  I don’t know that coaches from Marathon, Liberty, Vantare, Featherlight, Parliament, Millennium, Custom Coach, or any of a dozen other companies that have come and gone, is any better as I have never tried to disassemble one of them.  These are one-of-kind vehicles that are custom built specifically for the original purchaser and the over-riding factor in every case is the interior design.  Stuff, like toilets, go where the customer wants it, and systems, which are generally buried and hidden from view, get built wherever and however they can be made to fit.  The converter does not expect to have to repair or replace anything during the very short 12 month, 12,000 miles, warranty period and if stuff breaks after that, or someone wants to do a remodel or upgrade sometime later, it will all be time and material.  How difficult it is to do, and how many hours it takes, is someone else’s problem at that point.

The Apex crew hard at work on the back side of the main roof.

The Apex crew hard at work on the back side of the main roof.

We had a call from Butch updating us on a possible property purchase.  They are waiting for a clear title search before making an offer.  The property includes a house and a sizable barn.  The barn needs a new roof and the house will have to be gutted and the inside rebuilt, but for the right price it will still be a good deal.  They already have a good estimate to replace the barn roof and since they are now retired they have more time to work on the house than they would have a year ago.  They also have family and friends who can help.  Besides, they still have their home/business building in Twelve Mile, Indiana and their bus, which they lived in all this past winter, so they will not be under any pressure to get the inside rebuilt quickly.

Linda started downloading updates from Adobe Creative Cloud, which take a very long time, and then left at 3:30 PM for Ann Arbor.  She agreed to take care of grand-daughter Madeline while Brendan and Shawna attended a reception at the University of Michigan – Ann Arbor for newly tenured and promoted faculty.  I was on my own for dinner and Linda bought an Amy’s pizza so I would have something easy to prepare.

The roofers finished up for the day around 5 PM.  By the time they left most of the trash was in their dumpster trailer and the roof was tarped as a precaution against rain even though the forecast for tonight and tomorrow is for dry weather.  Rain returns to the forecast tomorrow night into Thursday but turns dry again on Friday, so we are optimistic that they will get the job finished this week.  It’s a big job but Apex has a big crew working on it and they got a lot of work done today.  We are very pleased with the look of the Certainteed Landmark Pro Max Def Resawn Shake shingle that we chose.  I took pictures of the work throughout the day as I always try to do with major projects.

After the roofers left I worked for a while in the bus.  I took the mattress into the house along with the electric heating pad controls.  I disconnected the two gas struts that support the plywood bed platform so I could open it far enough to reinstall one of the drawers.  I left them disconnected as I plan to remove the platform to provide better access to the sides of the box and floor.  I also plan to reposition them when I reinstall the platform to provide better access to the storage area underneath.  I then took measurements and made a sketch of the file drawer box for the desk.

Installing soffit baffles and replacing roof decking on the front of the main roof.

Installing soffit baffles and replacing roof decking on the front of the main roof.

I cooked the Amy’s Roasted Vegetable Pizza on the outdoor gas grill, both to avoid heating up the house and to see how it responded to that cooking method.  I used the grilling mat and the result was quite acceptable.  A glass of Franzia Moscato was a nice accompaniment.

After dinner I worked at the drafting board in my office turning my sketch and measurements into a scale drawing.  The two boxes for the desk will be trickier than a standard desk box because of the HVAC chase and because I have to put an Aqua-Hot heat exchanger in the bottom of each one.  I worked until about 9 PM and then came back upstairs.

The air-conditioner worked fine yesterday but was once again unable to bring the temperature in the house below 74 degrees F even though the outside air temperature never rose above 80.  There is clearly something wrong and I am wondering if one of the cold air ducts is open into the attic and/or one of the return air ducts us drawing hot air from the attic.  Either of these conditions would reduce the air flow to the house and overtax the evaporator in the air handling unit.  The more likely cause, however, is lack of refrigerant.  Whatever the case I shut the system off and opened up the house.

I was relaxing in the living room when Linda called at 9:30 PM to let me know she had left her babysitting gig and was stopping at the Whole Foods Market before heading home.  The reception started at 5 PM and lasted until 9 PM.  She was home by 10:15 PM and straight away to bed as she has to go into the bakery tomorrow and wants to leave early enough to be ahead of the morning rush hour traffic.

 

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.

 

2015/05/21 (R) Cats, Cars, and Tenure

Linda got up around 6 AM and got ready to go to the bakery.  I was aware she was up but I slept in.  Once up I showered and dressed for the day.  I did not plan to work in the bus today so I did not put on my work clothes.  Instead I needed to catch up on blog entries and take the cats to a 2 PM appointment at Plaza Veterinary Hospital in Farmington, Michigan.

I was putting a few things back in the master bedroom closet and noticed that the air-conditioning return air grill was stuffed full of insulation.  We had found this in the other return air grills and removed it but we overlooked this one.  I removed the grill and then removed the insulation and threw it away.  There was a 1/2″ thick filter material stuffed up in the register behind the insulation.  I trimmed the filter to just fit inside the grill and reattached it to the ceiling.  Putting the rest of the house back together will take both of us so we will do that this evening.  Besides, we like to give the carpets as much time as possible to dry out.

I went out around 9:30 AM to fuel my car and get a cup of coffee at the co-located Dunkin’ Donuts.  Back home I put my floor mat back in front of my main computer station and settled in to check e-mail and work on my blog.  There was a new driver available for the NVIDIA GeForce GPU in my ASUS laptop, so I initiated the download.  AT&T was providing me with a 160 KB download speed and the 277 MB driver said it would take an hour to download.  No point tying up the Internet connection until the download finished so I used my iPad while I waited.

The driver downloaded a little sooner than predicted and then installed quickly.  When I finally opened my e-mail and had another 50 MB of stuff to download; a lot of it BCM related.  They are trying to wrap up the April 2015 issue and sent me several drafts since I last checked my e-mail.  I have not been 100% successful in getting folks attached to the magazine to transmit large files via Dropbox instead of attaching them to e-mails.

Tim Olsen from our GLCC chapter called yesterday to let me know he had registered for GLAMARAMA and wanted to park with the chapter.  I updated my spreadsheet and need to e-mail a few folks to clarify their intentions before giving an updated coach count to the rally parking coordinator.  As often happens, I did not have much time left to work on blog posts before I had to round up the cats and take them to the vet.

Both cats complained for most of the trip to Plaza Veterinary Hospital, but they are cats and that is what they do.  I weighed them on the scale in the lobby and gave the receptionist the pertinent facts concerning their health.  Once in the exam room I opened their carriers.  Juniper immediately came out and explored the room.  We were early and had to wait a while but Juniper stayed very busy.  Perhaps she was looking go for a way out.  Jasper did not leave his carrier.  Perhaps he figured he was safer staying in there.

Dr. Carron examined Juniper first since she was already out of her carrier.  The cats both got a clean bill of health other than some tartar on their teeth.  Dr. Carron did not suggest, however, that they needed to be cleaned at this time.  They each got vaccinated albeit for different things.  Jasper also had blood drawn.  He is just a month shy of being 11 years old and Dr. Carron likes to do annual blood work on cats 8 years of age and older.  Juniper is due for a 3-year rabies booster in December of this year but Jasper is not due again until sometime in 2017.  Besides rabies certificates we may need an International Health Certificate for each cat to get them into Mexico and/or back into the United States if we decide to make the trip to Puerto Penasco in February 2016.

I had just left Plaza Veterinary Hospital when Linda texted me that she was wrapping up at the bakery.  It was already after 3 PM at that point and traffic was thick and slow in the usual places.  I had a nice QSO with Mike (W8XH) on the South Lyon 2 meter ham radio repeater for the last six miles of my trip.  He and several other club members bought Yaesu digital radios at the Dayton Hamvention to use with the new Yaesu Fusion 2m repeater that five of them bought from Yaesu for a special promotional price of only $500.

I got home around 4 PM and replied to Linda’s TXT message.  I got the cat carriers inside and set them free.  There was no hesitation about leaving the carriers this time.  Linda got home around 5 PM, 90 minutes after she left the bakery, and I filled her in on the cats’ veterinary appointments.  While we were chatting we got an e-mail from our son letting us know that Shawn’s tenure at the University of Michigan had been approved by the Board of Regents at their meeting today.  We were understandably pleased (and relieved) to finally receive this news and texted back our congratulations.  Shawna sent back a cell phone photo of themselves celebrating at a local Ann Arbor establishment.  They looked very happy.

Most car dealerships in this market are open until 9 PM on Mondays and Thursdays, and neither of us was ready for dinner yet, so we paid a visit to Champion Chevrolet on Grand River Avenue between Brighton and Howell.  We were greeted by Ken, but he only dealt in used cars and handed us off to Dan Danaher.  He had a Chevy Colorado on the lot so we checked it out.  It was not the 4-door crew cab Z71 off-road model, but it did have 4-wheel drive.  We climbed in/out of the front and back seats and played with the tailgate.  The front seats were fine but I could not sit in the back without the driver seat being all the way forward.  The 4-door Crew Cab adds about 7″ of rear leg room but it would still be tight.  That is one of the tradeoffs with mid-size trucks.  The front seats fit us nicely but this is not a truck for tall and/or large people IMHO.  The Z71 off-road version may sit slightly higher but we should still be able to get in/out without needing an accessory step or running board.

The MSRP for the truck we saw was just over $30,000 and overall felt very similar to the Nissan Frontier, nice but not luxurious.  In other respects, however, the trucks were very different.  The Colorado 4×4 models have a transfer case and can be towed four wheels down with an automatic transmission.  We liked the Frontier but it can only be towed 4-down with the manual transmission and for that reason alone is not a viable alternative for us.

Dan gave us a brochure on the Colorado and made a few notes on what we are looking for.  We would obviously like to see the 4-door crew cab and drive the Z71 4×4 off-road model before deciding to buy one.  He said he would call if/when he had those available for us to see and test drive.  If we ordered by the end of the month we would get a 2015 model but it would take 8 – 10 weeks to arrive.  Starting June 1st orders will be for a 2016 model and still take 8 – 10 weeks for delivery.  Recent history suggests a 0.5% to 1.0% price increase for the new model year.  We do not plan to order a new car before the end of May and a 1% price increase would not motivate us to change our minds about that.

On our way back to our car we took a quick glance at the Camaro sitting outside the showroom door.  If we were buying a nostalgia car thus would be it.  Linda’s first car, purchased before we were married, was a used 1967 Chevy Camaro convertible.  It was white with a red interior and had a 327 cubic inch V8 under the hood.  No emissions controls in those days, just raw power and $0.35/gal gasoline.

We drove to Panera in Brighton and had black bean soup and Mediterranean veggie sandwiches for dinner.  By the time we got home we were ready to relax.  First we took the spacers out from under the living room furniture, so we had someplace to sit, and put a few items back where they normally go.  I opened one of the bottles of Malvasia Bianca white wine from the Heart of the Dessert (Eagle Ranch) winery in Alamogordo, New Mexico and we celebrated our daughter-in-law’s attainment of tenure.  It’s been a good year for our son and his family and it is nice to see things finally falling into place for them.  The wine was very similar to the late harvest Rieslings we get from Michigan’s Leelanau peninsula; very sweet and thus a good cocktail or dessert wine.  We watched the final episode from season 1 of A Touch of Frost before turning in for the evening.

 

2015/05/05 (T) BAF & MEF3 Visit

Today was a family visit day.  We were up a bit earlier than usual and enjoyed a light breakfast and a quiet first half of the morning.  One of the things I’ve had on my to-do list is ordering Touch of Oranges Wood Cleaner and Touch of Beeswax Wood Preservative.  I finally got those ordered today directly from the company with free ground shipping.  I checked Amazon but the prices were no better and the products were not eligible for Amazon Prime.  I also found what I think is an exact replacement for my iPad2 flip cover and put it in our Amazon shopping cart.

Our son (Brendan) and grand-daughter (Madeline) arrived around 10 AM.  Madeline knows her way around the main floor of our house at this point and headed directly for the pantry to see what snacks we might have.  We tend to have dried fruit on hand, especially raisins and cranberries, as a tasty but healthy choice.  She is very fond of dried cranberries.  We spent the morning playing and talking and having a drawn out snacky lunch.  Somewhere in there Brendan setup the Pack-n-Play.

Pat Davidson from Apex Roofing showed up around noon to look at our roof and give us a quote.  Apex has done two roofs for us on the previous house and did excellent work at a fair price both times.  The quote was about what I expected and I gave Pat the verbal go ahead to put us in the schedule.  They are scheduling out about six weeks, so mid -June looks like the timeframe.  That potentially runs into the SKP Tri-Chapter Rally or the ARRL Field Day, as well as bus and bus barn projects, so we will have to see exactly where things fall.  We like to be around while this sort of work is going on.  This time, however, I also need to build a dormer on the back side of the roof to provide better access to the attic, generally, and the air-conditioner evaporator/air-handler, specifically.

The quote is for a new roof, with new underpayment and ice shield, so it is a “tear off” where they first remove all of the old roofing and repair any damaged/missing roof decking or boards.  They always look for at least a three day window with a dry weather forecast.  Pat said they would work with me relative to the dormer.  Specifically, they would start the tear off in the area where I want to build the former and then move to a different part of the roof so I can do the carpentry.  Linda and I need to visit ABC Supply Co. in new Hudson to pick out the specific shingle we want, and we plan to do that sooner rather than later.

The dormer is simple in concept but a bit trickier in execution.  I would build two tapered walls on the ground that look like right triangles.  The hypotenuse would attach to the roof with the long leg on top and horizontal and the shirt leg facing out and vertical.  Joists would be installed across the two walls, tying the together.  The front wall would be framed for an access door between the two short legs.  Two rafters would be installed at the end wall.  The ridge board would be set in place and cut to tie into the roof.  Two backer boards would be installed on the roof running at an angle from the ends of the side walls up to the ridge board.  The rest of the rafters would then be installed.  The walls and roof would then get plywood sheeting and decking.  The final carpentry would be fascia boards and siding.  Fortunately we have a pile of Hardy Board left over from when the house was sided.  Hopefully there is enough to side the dormer and it is in good enough shape to use.  I would then install the door, which I might have to build.  Apex would then roof the dormer, including continuous ridge venting.  The final steps would be painting the door and door trim and installing fascia and vented soffit material to match what is already on the house if I can find a supplier.  We would like the dormer to blend in and look like it belongs there.

Brendan got Madeline down for her nap at 1 PM and then spent a little time looking at what we plan to do with the floor in the bus before heading back to Ann Arbor.  I gathered up the Armstrong vinyl floor tile samples and drove to Lynch Carpet in Howell to return them and see what else they might have.  Clint let me keep the one we like for a couple more days and gave me a grout color chart.  I then headed to Best Buy in Brighton to pick up a Sony Blue-Ray/DVD player and a couple of flash drives, all of which were on sale.  I stopped for gas and got back to the house just as Madeline was waking up from her nap.

I was able to spend a little time researching a potential new vehicle.  As much as we are enamored with the Jeep Wrangler Unlimited the Consumer Reports data on them is very discouraging, especially the reliability data.  Viable alternatives may be the Nissan Frontier Pickup Truck or the Nissan Xterra SUV, both of which are available in 4×4 configurations.  Even the Ford F-150 might be a possibility as it is available in a 4-door, short-bed, 4×4 version.  They all have much better CR reliability data that the Jeeps.  The problem is, they are not Jeeps.  If we can wait a year, Ford is releasing an F-150 Raptor in fall 2016 that will feature a 10-speed transmission with six selectable driving modes including rock, mud & sand, and Baja (high speed desert racing).  It will probably also feature a ridiculously high price, but then none of these vehicles are inexpensive.

We got a phone call from XPO around 4:20 PM to let us know they would be delivering our box spring mattress foundation around 5 PM.  They showed up right on time and carried it to our bedroom.  Linda signed the delivery slip and they were gone as quick as they arrived.  We will wait until Brendan retrieves Madeline tomorrow to disassemble and reassemble the bed.

I entertained Madeline while Linda prepared dinner, but Madeline was very interested in what her Grandma Linda was doing, so we kept going to the kitchen to check on the work.  Linda served some “mock” chicken tenders, but she also fixed fresh green beans and homemade mashed potatoes, reheated some frozen edamame, and set out fresh black grapes and pineapple chunks.  Madeline is a good eater and we all enjoyed our meal.

Madeline is “potty trained” and very proud of the fact that she is no longer wearing a diaper.  She had a very successful day letting us know she needed to use the toilet.  We have a booster ring for the hall bathroom and put a stool in there for her.  She uses the stool to get up in the toilet seat and then uses it to stand up at the sink and wash her hands.  The hall bathroom sink/counter is lower than normal and turns out to be a great height for Madeline with the use of the stool.

We played after dinner until Madeline was tired.  She has always been comfortable staying with us but at 29 months of age is starting to have some anxiety about being away from her parents.  She wanted her daddy, and was briefly a little bit teary, but it wasn’t anything Grandma Linda couldn’t handle.  Linda followed the usual routine of looking at the rug (wall art) and all of the pictures in the hallway, the small bedroom, and finally the middle bedroom where Madeline’s Pack-n-Play is set up.  She selected the Construction Kitties book (again) for a bedtime story.  It was one of the books we got from the library yesterday and was her favorite choice all day today.  She fell asleep easily as she usually does.  We are active, busy people, but it’s a different kind of busy from having a 2-year old in the house.  We were tired, and turned in about an hour after our grand-daughter, but it was a good kind of tired.

We were so busy today that we failed to notice that it was Cinco de Mayo until it was almost over.