Tag Archives: 50/5 u H2O filter element (home)

2015/11/04 (W) Southbound Liberty

Linda decided last night to work at home today rather than driving into the bakery in Hamtramck.  That meant she did not have to get up at 5:45 AM.  She was up just before 7 and I was up just after that.  I made a large pot of Sweet Seattle Dreams half-caffe coffee and Linda toasted slices of cinnamon raisin bread for breakfast.  After breakfast she settled in to work at her desk while I tended to several chores.

I last changed our whole house water filter in May (of this year) and it looked like it was overdue for replacement.  I had one filter element left so I used it.  The process is simple enough:  I turned off the well pump, shut off the valves on either side of the filter housing, released the pressure in the housing, and unscrew the removable bowl.  When I unwrapped the filter and read the directions I was reminded that I am supposed to clean the bowl with warm, soapy water, rinse it clean, and then sanitize it with a bleach solution and rinse it out again.  That requires water, of course, but I had the water shut off and the filter housing disassembled so I had n way to turn the water back on.  The only way to accomplish this would be to stage the needed water before shutting off the water system but I never remember to open the new filter element are read the directions before I start.  I mean, really, it’s not the sort of procedure that requires me to read the directions each time.

One of the old swivel bearings (L) and one of the new swivel bearings (R).  The new one is obviously smaller than the old one and was not compatible with our pedestals and power bases.

One of the old swivel bearings (L) and one of the new swivel bearings (R). The new one is obviously smaller than the old one and was not compatible with our pedestals and power bases.

Not having any running water I wiped out the bowl with paper towels as best I could.  The directions called for lubricating the main O-ring with silicon grease.  I knew I had some from the last time I changed the filter.  It was hiding in plain sight but took me a while to find.  After greasing the gasket and installing it back on the bowl, I put in the new filter element and screwed the bowl back into the filter head, tightening it with the filter wrench.  I turned the well pump back on, opened the inlet and outlet valves for the filter, and let the trapped air out with the purge valve.

Our filter housing takes a larger than usual element.  It is 10″ long, which is the most common length, but 5″ in diameter, which is much bigger than usual.  It’s a dual density spun polypropylene material with a 50 micron nominal rating at the large outside surface and a 5 micron nominal rating towards the smaller core.  These filter elements are not available at the local home stores so I get them from Adam’s Well Drilling and Water Treatment, who installed out current water treatment system.

I gathered up the laundry and put a load in the washer.  I took the label from the new filter element and headed out on an errand run.  My first stop was Adam’s where I bought four filter elements and two bottles of chlorine tablets for the taste and odor portion of our water treatment system.  Wilson Marine is located next door to Adam’s so I stopped there to see if they sold marine grade plywood.  They didn’t but I had a good chat with the associate.  He suggested that for patching the floor in the bus I just use treated plywood or use Thompson’s Water Seal to treat whatever wood I use.

One of the new swivel bearings on top of one of the old swivel bearings clearly showing that the new bearing is small in diameter, inside and out, than the old one.

One of the new swivel bearings on top of one of the old swivel bearings clearly showing that the new bearing is small in diameter, inside and out, than the old one.

My last stop was O’Reilly’s Auto Parts.  Their parking lot was finally open so I could park near the door.  Ronald had me load the containers of used oil and the bag of filters into a shopping cart.  The bag had leaked onto the paper towels I put under it in the back of my car so Ron gave me a cardboard box to put it in.  He simply put the bag of filters in a container but he emptied the six containers of oil and gave them back to me.  They recycle oil but not the containers.

When I got home Linda checked to see if we could take the plastic oil bottles to Recycle Livingston.  Used motor oil is considered hazardous waste and anything that has had used motor oil in it is considered a hazardous material so we could not take the containers there.  I helped Linda load all of the other recyclables into my car and she made a run to the recycling center, the first in a few weeks.  After moving the laundry from the washer to the dryer and putting another load in the washer I got back to work on the bus floor.

 The area behind the panel to the right of the co-pilot/navigator seat.  The mouse nest is gone and the damaged wood has been removed from between the side-to-side seat mounting rails.

The area behind the panel to the right of the co-pilot/navigator seat. The mouse nest is gone and the damaged wood has been removed from between the side-to-side seat mounting rails.

I spent most of the afternoon working on the floor under the front passenger seat.  First I removed the blocking that provides support for the bottom edge of the switch panel but also spans the three floor boards.  I cleaned out the mouse nest behind the switch panel and found the skeleton of a small mouse.  I then got the piece of wood between the mounting channels out.  The drain line for the front CruiseAir evaporator went through this floor near the outside edge but the floor was rotted enough that I was able to break out the wood on the back side and pull the board out.  As I did this I was reminded, once again, about how much of this conversion was built with the idea that it would never have to be disassembled.

I took a break for lunch, which was leftover lentils and quinoa pilaf with some fresh fruit.  After lunch I resumed working on the floor under the front passenger seat in the bus.  I managed to remove most of the rusted metal filler plate.  I made a lucky guess as to where my wire brush was stored and used it to clean the surface of the rusted metal that remained.  I played with different combinations of wood thicknesses and pondered how I will rebuild this area.  I then sprayed the rusted areas with POR-15 cleaner/degreaser and scrubbed them with a sponge soaked in hot water.

I moved to the driver’s seat area and repeated the process.  There was one area with damaged wood that I still had to deal with.  There was an edge about 10 inches long capped with two thin gage metal angles that were badly rusted.  I removed as much of the angles as I could.  I cut off a strip of wood about 2″ wide and 10″ long and removed the rest of the angles.  I wire brushed the area but left the POR-15 cleaner/degreaser for tomorrow.  In anticipation of applying the POR-15 tomorrow and coating it with black spray on rubberized undercoating paint I began masking off the area with painter’s plastic.

For dinner Linda made a salad, roasted eggplant with garlic and breadcrumbs, and mock fish with vegan tartar sauce.  We finished the Frey Natural Red wine with our meal.  I would love to support this company but this wine is too dry for my pallet.

PBS had an interesting lineup of shows this evening on continental formation, natural wonders, and the human brain.  I dealt with e-mail before the shows and we turned in after the last one.  Chuck and Barbara were planning on leaving this morning, southbound for Florida in their 1993 H3-40 Liberty motorcoach.  I did not have any messages from Chuck today so I presume they got away as planned.  They bought a lot at the Pelican Lake Luxury Motorcoach Resort in Naples where they have spent the last six winters and that is where they are headed.  We will be staying about 90 minutes north of there in January and February and will get together with them as time and commitments permit.  We are looking forward to seeing their lot; it has a coach house and they are doing some landscaping, including large palm trees.

 

2015/05/24 (N) Nuts to That

We had our usual coffee and breakfast granola but made a more leisurely morning of it than normal.  We finally got dressed around 11 AM and headed to the Howell Farmers Market at 11:20 where we bought another bar of soap from Marjorie.  I got to pick this time and chose the ginger-grapefruit.  We bought the Eucalyptus soap two weeks ago and Marjorie suggested letting them air dry for two weeks before using them.  We will see how long the Eucalyptus bar lasts once we start using it and that will tell us how often we need to purchase from her to stay ahead of our usage, allowing for drying time.

We stopped at Lowe’s to return the “white” toilet seat and buy a “biscuit” colored one.  We looked at pipe wrenches but did not buy one.  I did by a 14 TPI, 6″ long blade for my Sawz-All that said it would cut metal up to 1/2″ thick.  I still hoped to get the nut off of the trailer ball on the lawn tractor without having to cut the threaded stud, but the blade was my backup plan.

We had a brief confab regarding the motorcoach refrigerator alcove and cabinet.  I found my small plumber’s toolbox and it had several pipe wrenches inside.  I took the largest one and checked to see if/how it would fit the trailer ball on the lawn tractor.  It opened more than wide enough and looked like it would snug down tight around the throat of the ball (between the ball and the hex flange base).  Linda kept the pipe wrench from slipping out of position on the ball while I used the torque wrench with the 3/4″ drive, 1-1/8″ socket to remove the nut.  It was still a bit of work but we got the ball off without cutting, cracking, or heating.  I then backed the lawn tractor up to the utility trailer and Linda connected the trailer yoke to the tractor tow plate.

Next we tackled the hall bathroom toilet seat replacement.  Once again we encountered nuts that would not come off.  This time the nuts were a hard plastic but the bolts were rusted and the nuts would not turn.  I eventually cut through the two plastic nuts with a utility knife and pried them apart allowing us to remove the old retaining bolts.  We installed the new seat/lid which came with its own special bolt and elongated plastic nut.  The nuts had special tips designed for 1/2″ sockets and engineered to break off when tightened to just the right point.  We had both nuts torqued down and broken off but the seat was slightly crooked so I had to loosen then, reposition the seat, and re-tighten them by feel.  What should have been a simple, short job ended up being a long and difficult one, in part because there was not a lot of room on the sides of the toilet bowl to get under here and work.  As we were cleaning up Linda noticed that the toilet tank was leaning slightly to the right relative to the base/bowl and thought we should adjust it.

I was already aware of the leaning tank, and the fact that it was not as tight as it should be.  The tank is held to the bowl by two bolts that go through the bottom of the tank and are sealed by gaskets under the heads.  I tried tightening the wing nut on the left bolt.  Even though it was rusty I was able to turn it, but the tank immediately started leaking from the bolt hole in the bottom.  We shut off the water and flushed the toilet to get most of the water out of the tank.  Linda held the left bolt head with a long flat blade screwdriver while I turned the wing nut on the underside of the bowl, first by hand and then with pliers.  I was careful not to over torque it and the tank was still a bit wobbly, but it was straighter and it did not leak when we refilled it.  We will keep an eye on it.  A leaky tank will result in water continuously running onto the floor and causing major damage of not detected quickly and stopped.

Linda cleaned up the bathroom while I put the tools away.  We then changed the primary whole house water filter.  The filter we use is the same 10″ length as a standard potable filter element but is about 5″ in diameter and has two micron ratings.  It’s a spun polypropylene media that is 50 microns at the large outer surface and 5 microns at the small inner surface.  In principle it filters better and longer than a single micron rating element by filtering out larger particles first and thus not clogging up the 5 micron material with large particles.  The same thing would be accomplished, of course, with two filters in series, or three, or four, each with progressively smaller micron ratings.

The Post-It note by the filter said we had last changed it on 11 November 2013.  If that was true it was way overdue to be replaced.  The element was completely black from outside to in so it had been in there longer than the fall of 2014 for sure.  We are starting to get some slime in the toilet tanks again and the water seems to have a slight black tinge, but that may have been due to the filter element needing to be changed.  I may need to have Adams Water Treatment come out again to discuss installing an iron filtration system.  Our drinking/cooking water still goes through a reverse osmosis system, so it is very pure.

Having accomplished several rather physical tasks I decide to sit in the living room and work on my blog posts for the last few days.  Linda made hot tea for us to enjoy while iPading, after which she reheated the leftover risotto and asparagus from last night’s dinner and we finished the open bottle of 2013 Egri Merlot.  After dinner I finally settled in to work on computer-based tasks.  I had a long list of things to do but did not get to most them.  I did manage to off-load recent photos of the bus interior from my camera to my computer, select a few to use in blog posts, and processed them.  I edited a few more blog posts but did not get them uploaded to our website.  I then dealt with e-mails and went to bed.