Tag Archives: 16′ storage container

2014/09/12 (F) Posted

Linda was up very early to try and beat the morning rush inbound to Detroit from the northwest.  I took an Ibuprofen and went back to bed, finally getting up at 7 AM.  1-800-PACK-RAT was scheduled to pick up the 16 foot long storage container we have had in our driveway for the last two months and I wanted to be up and dressed when they arrived.  I did not have any problems with my teeth overnight.  They felt OK this morning but the upper right was still a bit sensitive to biting pressure.  I had a nice soft banana for breakfast and decided to keep taking the Ibuprofen and Tylenol.

I put a load of laundry in the washer and then ran out to take care of errands.  I stopped at Dunkin Donuts for coffee, Lowe’s for solar salt for the water softener, and then Teeko’s for coffee beans.  Jeff still did not have the Sweet Dreams decaf blend even though he orders it every week.  I got a pound of the Seattle Blend 50/50 regular/decaffeinated, and a pound of regular Brazilian Serra Negra to blend with the decaffeinated beans we already had at home.

Heather, from Root Canal Specialty Associates, called around 9 AM to check on me.  I mentioned the sensitivity and she said that was normal and to keep taking the Ibuprofen/Tylenol through the weekend to counteract any inflammation and/or discomfort.  She wanted to know if I thought the temporary filing was high and making contact before the other teeth.  I wasn’t sure, but she said if it was to call them Monday morning and they would get me in to adjust my bite.

Since I was on the phone anyway I called Bratcher Electric to see about the quote/estimate for the generator service / fuel changeover and the service entrance feed from the transfer switch to the sub-panel to change it into a main panel.  They have been very busy with repairing damage caused by the storms of the last few weeks.  We did not suffer any damage beyond some dead branches breaking off from trees, but south of us folks were hit much harder.  That kind of work always takes priority.

The day was overcast and dreary with morning temps in the mid-40’s and a high of 54, but that was OK; it was a perfect day for sitting at a desk and working on a computer, undistracted by either bad or gorgeous weather.  I did, however, bring my computer upstairs and work at Linda’s desk.  My office is very nice but it is in the basement and it is a bit of a cave.  Sometimes I like that, and sometimes I don’t.  I worked on our blog until early-midafternoon and finally uploaded posts from Aug 2 through Aug 20.

My only interruption was a visit from one of Roese Construction’s field supervisors who was checking on where the runs will go to connect the houses in our neighborhood to the natural gas main.  After looking at our situation he agreed with me and Mel who had looked at this a few weeks ago, that staying to the east of the east entrance to our pull-through driveway made the most sense even through it required them to bore at an angle relative to the main line.  That conversation confirmed that they will be horizontal boring the branch line rather than trenching it in.  He did not give me a firm date, but it sounded like it could be as early as tomorrow (Saturday) and likely by Tuesday next week.

My computer battery was down to under 1 hour of charge remaining, so I took it downstairs and plugged it back in to its power supply.  While I was down there I put another load of laundry in the washing machine.  Back upstairs I made a PB&J sandwich for lunch, along with some green tea.  I got back on the RVillage Mobile development site, played with a few more features, and provided some additional feedback to the development team.  I then worked on this post using my new Logitech Bluetooth keyboard.  The Wacom Bamboo stylus is nice, but the keyboard is the way to go when creating extended text.

Juniper, our female cat, was getting into something in the library so I went to investigate.  She had cornered a yellow jacket and was trying to figure out what to do with it.  I solved the problem for her by capturing it and putting it outside.  I don’t think she was pleased with my solution, but not 20 minutes later she was at it again, and it was another yellow jacket.  We have a nest in the soffit near the library that we need to get rid of, but we have not had a problem with them getting into the house until very recently.  Hopefully that has not changed but I will have to investigate the situation.  It may be that with the onset of cooler temperatures they are finding their way into the library through the recessed ceiling downlight cans.  If so, there’s really no good way to seal those.  Fortunately we can close of the house from the library with a kitchen door and a living room doorwall that includes a screen door.

It started raining very lightly around 4 PM, but never developed into anything.  Linda got home from the bakery at 5:30 PM.  The storage container had not been picked up yet so we called the 1-800 number and left a message with our callback number.  I got a call around 6 PM from the local (Plymouth, MI) office verifying the pickup and address.  The driver arrived around 7:20 PM and had the unit loaded by 7:30 PM.  After he left we headed to dinner at LaMarsa where we had crushed lentil soup and split an order of Koshary and salad.  Even splitting the dish we both ate too much, aided by the fresh-baked pocket bread and garlic spread.   The food and service were both excellent, as always, and the garlic spread was “…the gift that keeps on giving.”

We got back from dinner a little before 9 PM, too late to start any in-depth computer work, but early enough for me to finish this post and for Linda to do some recipe research for Sunday’s brunch.  It seems like only yesterday it was still light at 10 PM at night, but we are approaching the autumnal equinox, and there are noticeably fewer hours of daylight now.

 

2014/09/05 (F) WordPress 4.0

We awoke to temperatures in the low 70’s this morning and by noon it was forecast to be 85 degrees F with rapidly rising humidity.  We turned our A-C on yesterday and left in on overnight and through the day today.

WordPress 4.0 was released yesterday and just before midnight I updated the four websites I manage, including this one.  I was looking forward to working with the new version today, but first things first.  Darryll called at 8:15 AM to make sure it was OK to come over.  We finished breakfast and then opened the garage and moved a few things that might be in his way. Although we would have liked to continue working in the garage during the morning, before it got really hot and humid, we were glad to have Darryll here working on the HVAC installation.

Instead of working on organizing the garage Linda worked at her desk and baked a loaf of bread while I assisted Darryll.  He wired up the library thermostat and showed me how the wires were connected.  He installed the return air grill, which required some minor drywall trimming, and installed a 6″ combustion air duct in the ceiling of the utility closet.  The duct had a screen on one end with a hood, like a dryer vent, and was open on the other end.  He installed it from the attic side with the hood in the attic and the open end sticking down through the ceiling into the closet.  I may decide to caulk or apply drywall compound to fill that gap between the duct and the hole Darryll made in the ceiling.

Darryll’s main focus, however, was hooking up the four pieces of duct, two rigid and two flexible, that will carry conditioned air into the library and installing the two ceiling registers.  That involved working in the attic which was very hot.  The flexible duct for the two ceiling registers was the same kind of product that was used in the main house; a pre-insulated flexible accordion tubing with an 8″ inside diameter that comes in 25′ lengths compressed to about 3′ for shipping.  To feed the two registers on the lower part of the west wall of the library he cut lengths of 8″ diameter (circular cross section) metal duct and assembled them.  He attached them to the supply air duct (plenum) with flange connectors.  He then slide insulation blankets (tubes) around them and connected the bottom ends of the duct into the back of the register ducts using several elbows to bring the duct around and close to the wall.  Finally, he slid the insulation down and secured it.

While Darryll was doing all of that I finished connecting the AC power to the condenser/compressor. That involved the following:

  • removing the terminal cover panel from the inside of the fused disconnect box
  • knocking out access holes on the right side and bottom
  • mounting the fused disconnect box to the side if the house
  • cutting a piece of 3/4″ plastic conduit for the cable from the soffit to the box
  • running the NM cable through the conduit
  • installing a watertight 90 degree elbow into the conduit
  • attaching the elbow to the side of the box
  • cutting, stripping, and connecting the line wires
  • cutting the plastic armor on the hookup cable to the right length
  • installing a straight screw-in watertight connector on the box end of the armor
  • installing a screw-in 90 degree elbow watertight connector on the condenser end
  • cutting, stripping, and connecting the load wires in the box
  • cutting, stripping, and connecting the load wires in the compressor.

I had Darryll check my work and then installed the fuses in the pull-out disconnect but was not able to get it to plug all the way in.  Darryll bent the blades slightly and got it to seat fully.  (I need to get two different fuses.  All he had were 30A fuses but 20A would be sufficient.  Also, the fuses he had in his truck were notched on one end.  I think fuses with full barrels on both ends would be better as they would have more contact surface than the notched ones.)  I reinstalled the terminal cover panel and closed the box.  I then re-installed the cover panel on the A-C compressor that Darryll had removed earlier.

With the power connected and most of the ducts run, we turned on the 120VAC/15A circuit breaker (for the unit in the utility closet) and the 240VAC/20A circuit breaker (for the compressor/condenser).  Darryll turned the thermostat mode switch to “cool” and the fan switch to auto and the A-C came to life.  Hooray!  I love it when that happens.

While Darryll finished installing the ducts and the registers I connected and mounted the thermostat for the garage furnace and then connected the wires on the other end of the cable to the terminals on the back of the unit according to Darryll’s instructions.  I removed the end panel from the Reznor ceiling-mounted garage furnace, removed the documentation packet from the inside, checked that the gas valve was in the “on” position, and put the end panel back on.  I also removed the protective plastic film from the bottom of the unit.

Darryll gathered up his tools, extra parts, and unused materials and loaded them in his truck. He then pressurized his portable air compressor and used it to pressurize the black iron gas pipe.  It has not been holding pressure, so he pumped it up to 15 PSI and we went in search of leaks with a spray bottle of soapy water.  We used my inspection mirror to see behind and under connections and found three leaks.  One was in a 2″ pipe fitting behind the garage, one was in a 2″ pipe fitting near the end of the run by the generator, and one was at an elbow in the 1/2″ pipe where it exits the utility closet on its way to the garage furnace.

Darryll was checking air temperature readings at the registers and in the main plenum of the library HVAC unit.  The library was 89 degrees F when he first turned the A-C on, and the attic was a lot hotter than that.  He connected his gauges to the compressor/condenser and said the readings were close enough to correct that he did not want to add or remove any refrigerant until the room had cooled down and stabilized at the requested temperature.

I was hoping he would get the job finished today but he needed some equipment, which he did not have with him, to work on the iron pipe and he was obviously tired from a long day working in the high heat and humidity.  He may be back tomorrow; if not, Monday or Tuesday. Whenever he returns, I have complete confidence that he will get it done before the gas meter is hung and that it will all work correctly for many years with very little attention other than changing a filter once or twice a year.

We deferred lunch until Darryll left.  We had chickpea salad on a slice of the bread Linda had baked earlier, corn-on-the-cob, and the last of some fresh pineapple.  Nothing says “summer” like organic, non-GMO corn-on-the-cob.

After lunch I called Bratcher Electric to check on the status of the estimate/quote that Mike was putting together to service our generator, convert it to natural gas, and run a 100A Service Entrance Cable from the transfer switch to the garage panel, converting it from a sub-panel to a main panel.  Karen said they have been really busy but he would work on it over the weekend.

I also called 1-800-Pack-Rat to arrange pickup of the storage container on Friday September 12th.  Steven was not able to schedule the pick-up during the call and said he would contact the local office and get back to me.  I made it clear that we did not want to roll over into another billing cycle and I was calling one week ahead of time as we had been instructed.  He assured me that it would not be a problem.  About an hour later we got a return call and follow up e-mail confirming pickup for Friday, September 12.

Late afternoon I checked on the library A-C to make sure it was not freezing up.  Everything looked OK.  The thermostat was set to 76 degrees F and the temperature was down to 77, so I bumped the setting up to 78 to let it cycle off and on.  Although Darryll did all of the heavy lifting on this project (literally) I spent my fair share of time in the attic on warm days installing the pull-down folding ladder and working on electrical wiring and attic lights.  It was very gratifying to see that all of this work—his, mine, and Linda’s—finally result in something that operated correctly.

We were relaxing and reading when severe weather watches and warnings for our area started arriving on our iPads.  Naturally we went outside to see what was going on.  We were both born and raised in the Midwest, the St. Louis, Missouri area, to be exact, and as kids in the 1950’s, threatening weather was a form of summertime entertainment.  Not that we were stupid; we learned from the adults around us when the show was over and it was time to head to the basement.  When I was about 5 years old we lost a plum tree in our backyard to a close encounter with a tornado.

The gathering storm.  The clouds were very dramatic in all directions.

The gathering storm. The clouds were very dramatic in all directions.

The clouds were very dramatic but eventually gave way to a formless mass of gray with swirling winds and a few raindrops.  We checked the Weather Channel app and the Weather Underground Wundermap app on our iPads.  The radar returns showed that we were likely in for some rain, and we got some, but as often happens the worst of it passed north and south of us.  The rain we did get was very welcomed.  We had heavy rain on Monday (Labor Day), Keith mowed the grass on Tuesday, I spread grass seed around on Tuesday and Wednesday, and a flock of six wild turkeys feasted on the grass seed on Wednesday and Thursday. We needed a nice light rain to help the seeds germinate and take root rather than be eaten or washed away in a thunderstorm.

Storm clouds looking east.

Storm clouds looking east.

Around 7:30 PM our power flickered several times and we received e-mail messages from our generator letting us know that utility power had been lost and then quickly regained.  We decided to check the Kohler OnCue software to see what the generator was doing.  We thought sure we had installed the software on Linda’s computer, so we could monitor it from her desk in the kitchen/dining area, but it wasn’t there.  After much searching and head scratching we checked my old laptop and there it was!  When we thought about it we realized that the generator had been installed about a week before Linda started configuring her new Samsung laptop, so there was no way we had put the software on her machine.  We’ve been very, very busy the last 20 months, so it was not surprising to us that we had forgotten the exact sequence of events.

20140905-08295

Approaching from the southwest the clouds got more ominous.

The severe warnings expired at 8 PM and the severe watches at 9 PM, but that did not mean the rain was done.  A big fetch of moisture was located south of Chicago, Illinois and moving through southwest Michigan in our general direction.  The rain was forecast to continue into the early hours of tomorrow but be done before sunrise.  When the rains finally came it rained hard for a while.  Tomorrow is forecast to be a perfect Michigan day and I plan to buy another bag of grass seed to spot seed the areas that got washed away, again.

 

2014/07/17 (R) A-C Service

Allen from TOMTEK arrived a little before 9 AM to do the annual maintenance service on the air-conditioning system.  The A-C system looks to me like it was retrofitted to the house, but it’s hard to say how long ago.  The house has a hot water baseboard heating system so the air-handling portion of the A-C system (evaporator, blower, and flexible ducts) is all in the attic.  The air delivery registers are all in the ceiling of the main floor (it’s a ranch style house).  There is one air return grill in the living room with a 12″ flexible return duct a smaller register and duct from each of the three bedrooms.  The system does not supply conditioned air to the finished basement.

To service the air-handler Allen had to use a step ladder to gain access to the attic through an opening in the ceiling of a hall closet and then work his way through the trusses to the west end of the house.  He had to work by flashlight while lying down, having pushed insulation out of the way to make space.  It was a cool, but sunny, morning so at least the temperature in the attic was pleasant.  He cleaned and inspected the unit and checked it for refrigerant leaks and then had me turn it on.  He checked its operation while running and pronounced it good to go.  He also indicated that there was no evidence of an air filter anywhere in the attic.

The only other place there could be air filters was behind the return air grills.  The living room grill is up high on a wall in the northeast corner of the living room (cathedral ceilings).  I set up my 8′ step ladder so Allen could remove the grill and have a look.  Sure enough, there it was, only it wasn’t a typical furnace/A-C filter with pleated material surrounded by a frame and held in place by a wire fence.  Rather, it was just an oversized piece of loose fiber mesh filter material pressed into the square box that the return air duct attaches to inside the top of the other hall closet.  He removed it, took it outside, cleaned it, and re-installed it.  It was dirty but not completely clogged and Allen said the system was now drawing air better than before.  He then turned his attention to the outside compressor (condenser) unit.

The outside unit is a Coleman, and that is about all we know.  The information plate was so badly faded that Allen was unable to get any of the information he needed from it.  He cleaned and inspected the unit, checked it for refrigerant leaks, and then hooked up his special test fixture.  He said it was working properly and did not need refrigerant, which was a good thing because refrigerant is very expensive and is not included as part of the pre-paid service call.

After Allen was done and had left I climbed back up and measured the return air box.  It was 16″ x 16″.  We checked Lowe’s and Home Depot online and could order one that size but it would not get here until next week.  With company coming Sunday I wanted to complete this project and put the furniture back in place and not have to move it again.  I drove into Howell to check the local stores but they did not stock that size filter.  The guy at Lowe’s suggested I try AAA Appliance (AAA Service Network) just down the street.  They did not have that size in stock either, but they could order one and have it by Monday.  They were cheap enough that I ordered four of the 2″ thick ones.  (I got a call at 5 PM that they had arrived and were available for pickup.). While I was out I also shopped for a new electrical panel for the garage.  I checked Home Depot, Lowe’s, City Electric, and Standard Electric Supply.  I did not buy anything, but that’s a story for another post.

While I was out Linda moved a few more items into the storage container and dealt with much of the stuff we had moved into the library yesterday.  When I got back we worked together to move even more stuff into the container.  That, in turn, freed up space in part of the garage that allowed us to move three of the large stationery shop tools out of the area where Darryll and I will be working.  The whole impetus for the storage container is to clear out the east half of the garage so Darryll can install the garage heater and the new HVAC unit for the library.  As long as we had to make space for him to work, it was an opportunity to further empty out the garage, repair some things, and rearrange where/how we have things stored.  It seems sometimes like a never-ending process as there isn’t really a place for everything so it isn’t possible for everything to be in its place.

In the center area of the back (north) wall the previous owners had removed the drywall and installed Wonderboard to act as a heat shield for a wood burning stove.  The husband restored old cars and used the garage as a shop.  We saw the stove when we looked at the house in January 2013.  Wonderboard is normally used as the substrate for laying tile but contains concrete, so it also works as an insulator against heat and doesn’t burn.  I wanted to drywall this area and decided to remove the Wonderboard.

I removed the Wonderboard and discovered two things:  There was another layer of Wonderboard underneath and there was visible evidence of a fire.  When I removed the second layer of Wonderboard the extent of the damage was fully revealed.  One 2×4 stud was burned almost completely through for about 12″ and the paper facing on the insulation on either side of it was charred.  An electrical wire also ran through that wall and the insulation was discolored.  Such is the nature of remodeling projects; you never know what you are going to find.

I spent a little time after dinner trying to figure out what each of the circuit breakers in the garage sub-panel controlled.  There are 12 breakers occupying 14 of the 16 positions.  I figured out that four of them controlled about 90% of the outlets in the garage.  It dawned on me later as I was discussing this with Linda that the other breakers might supply power to the library.  I will have to verify that tomorrow.

 

2014/07/16 (W) Rat Packing

Today was not a trip down memory lane, although some good Rat Pack music would have been a nice accompaniment while working.  Tim called around 8:30 AM to verify the delivery details for our 16-foot Pack-Rat storage container and confirm that we would be home around 10 AM.

We wanted to get the container as close as possible to the garage while still being able to open the doors.  In that location it would also be out of the way of the pull-through driveway in case we wanted/needed to get the bus out.  The potential problem with this location was that the container had to be unloaded underneath and then behind the main phone line that hangs across our driveway.  The vertical clearance from the driveway to the phone line is just under 12′ 6″.  I was told when I ordered the container that they needed 13′ 6″, minimum.

We had not seen any landscapers by 9:00 AM so I called Steve at VLD and left a message.  The previous owners of the house left a large (bulky) projection TV which we had the movers bring up from the basement and put in garage when we moved in last year.  Linda called Alchin’s,  our trash collection company, to see if they would pick it up.  They said they would so we rolled it out to the curb with the rest of the trash.  I called Steve (VLD) on his cell phone and found out he was in our backyard.  Apparently he arrived just as we finished putting out the trash and went back in the house.  The landscape crew was supposed to have been there at 9:00 AM.  He called them and then left.  A Two-man crew showed up a little while later.

I placed our 8′ fiberglass (non-metallic, non-conducting) stepladder under the phone line and used an 8′ 2×4 and some short pieces (as blocking) to temporarily raise the line to 13′ 7″.  Tim showed up right on time and, after taking care of the paperwork, surveyed the situation.  He said it would not be a problem placing the container where we wanted it and it turned out that lifting the phone line was not necessary.  Here’s why…

The truck that delivers these containers is very specialized.  It has a built in crane with two long arms, kind of like a forklift, that extend down the sides of the truck and then make a 90 degree bend and connect to the main telescoping mast.  The mast is normally just behind the cab when the container is loaded and ready for transport.  To unload the container the arms are swung out away from the sides of the truck a couple of feet and then raised.  Four lifting bars are inserted into the base of the container, two on each side, and attached to the arms with chains.  The arms are then raised, lifting the container free from the truck bed (after it is un-strapped).  The entire crane assembly then slides backwards until the container is clear of the rear bumper, allowing it to be lowered.  Before final placement, however, the truck can still be moved back and forth.  (This is only true if the container is empty.  If it is loaded, the rear stabilizing jacks on the truck have to be lowered, preventing the truck from moving.)

I helped Tim position the truck so the crane mast was just in front of the phone line and the front of the container was just behind it.  We are only using the container for on-site storage so it will be empty when we finally have them come back and pick it up.  Positioned where it is they can retrieve it without raising the phone line so we won’t necessarily have be here at the time.  We will be, but it will still be less work for us.

With the container in place we started moving things out of the garage.  Some went into the container, some went into Linda’s car to go to the recycling center, some got set aside for donation or sale on Craig’s List, and some got designated to go in next week’s trash pickup.  I really hate throwing anything away that might be useful, but our limited experience with things like Freecycle have not been good, and selling things on eBay or Craigslist has never seemed worth the effort the small monetary return.

Around noon the landscapers wanted to know if we knew of an urgent care facility nearby.  That’s not a question you want to be asked on a construction site.  One of the guys was bitten by a spider and thought it might have been a Brown Recluse.  When they first started working on the retaining walls in the back they identified what they thought was a Brown Recluse (fiddleback) spider.  Although Michigan is farther north than their normal range they do occur here, so it was possible that’s what bit him.  The nearest medical facility we knew about was a hospital about five miles away, but Steve wanted them to go to an urgent care facility because he through they would get quicker service.  (They had called Steve before even asking us for assistance.)  Linda got on her computer and located one in the same area as the hospital.  They left to seek treatment and did return.

We did a little online research and found that there are a lot of spiders that resemble the Brown Recluse, which can range from gray to almost black and from the size of a penny to slightly larger than a quarter.  The name “fiddleback” comes from a pattern on the dorsal (upper) side of the spider, but is not a definitive identifier.  The most definitive characteristic is the six eyes; most spiders have eight.  Unfortunately they crew did not have the spider, so a positive ID was not possible.

After lunch Linda went to the recycling center and did some grocery shopping while I continued to work in the garage.  We had cleared out the east wall and the northeast corner which allowed me to remove wire shelving that was installed there.  I also had clear access to the electrical sub-panel so I removed the cover to have a look inside.  There were 11 load wires connected, nine to single-pole 120 VAC breakers and two to a double-poll 240 VAC breaker.  The power feed from the main panel in the basement was three-wire (2 hot, 1 neutral) not four like it should be, and all of the branch circuit ground wires were bonded to the neutral conductors.  This may have been OK at one time but is absolutely not current national electrical code (NEC).  Grounds and neutrals in an electrical system should only be bonded (connected together) at one point, usually in the main panel or at the service entrance.  For remote sub-panels, such as in a separate building, the ground wires can be connected to a pair of ground rods at least 8 feet long driven into the earth, but this is not an ideal arrangement.  If the resistance is not low enough it will limit the current flow through the ground wire to something less than required to trip the circuit breaker.

After dinner I got a phone call from Gaye, the chair of the FMCA Education Committee.  We talked for quite a while about the committee and RVing in general.  The whole committee has never met for a face-to-face meeting and many of us do not really know each other, so this was a chance to get better acquainted.