While we are traveling, we are having a pole bar built to house the RVs and provide space for a workshop and storeroom. Permits were pulled just as we were leaving. On July 1st we got the first official photographs from the builder. The following show the preparation of the site (barn pad and driveway tie-in), the removed top soil in the low area NE of the barn, and the trenched footings having been dug and the concrete poured. Captions on the photos explain the rest.
More to come as work progresses and images arrive.