Category Archives: Projects

2014/09/25 (R) Two M’s

Linda made zucchini bread and muffins a week or so ago.  We ate all of the muffins within a couple of days but she froze some of the bread.  She took the bread out of the freezer last night to let it thaw so we could have it for breakfast this morning.  She warmed it up and made a fruit salad to go with it, along with our usual fruit juice and coffee.  Marilyn took advantage of her visitor status and slept in so we had breakfast without her and she ate when she finally got up.

Madeline in her sofa-bed with her Winnie-the-Poor sleep sack.

Madeline in her sofa-bed with her Winnie-the-Poor sleep sack.

I was working on the electrical outlets in the garage when Brendan arrived at 9:45 AM with Madeline in tow.  Meghan arrived around 10 AM, so Madeline had all the “buddies” here to admire her.  I finished my electrical work, touched up some drywall compound, and then got cleaned up.  I was once again the designated reader and got to read three books to Madeline.  She had lunch at noon and her dad got her down for a nap around 12:30 PM.  Meghan is still experimenting with foods, so she left to do her grocery shopping on the way home.

The "buddies" (L-2-R): Brendan, Marilyn, Meghan, and Linda.  (Not shown: Bruce, taking the photo.)

The “buddies” (L-2-R): Brendan, Marilyn, Meghan, and Linda. (Not shown: Bruce, taking the photo.)

Brendan stayed for lunch and a long chat.  He was thinking about leaving when he decided to check out my old Toyo view camera.  He figured the students in his history of photography class at the University of Michigan had probably never seen one and wanted to take it in for them to see.  He also wanted to have it at his house to play with.  We found it and checked that all the parts were there and he loaded it into his car along with the tripod and dolly (studio roller base).  Madeline started to wake up so he made his exit.  She doesn’t seem the least bit concerned if he’s not here when she wakes up, but is momentarily distressed if she sees him leave.

Flowers along the Mill Pond boardwalk (Brighton, MI).

Flowers along the Mill Pond boardwalk (Brighton, MI).

Madeline is spending the night tonight so we will two M’s here the rest of the day and tomorrow morning.  Linda and Marilyn will take Madeline back to Ann Arbor tomorrow in time for lunch and her 1 PM nap.  Madeline has swimming on Fridays at 4 PM so Linda and Marilyn will leave before that and stop at Whole Foods Market before taking Marilyn to Detroit Metropolitan Airport for her evening flight back to St. Louis.

I took a few minutes to check e-mail while Madeline was napping.  This morning I had tightened up the Wordfence parameters on the FMCA-GLCC site and switched the caching from the faster Falcon Engine to the Basic setting in order to fully activate country blocking.  I only had a few failed login attempt e-mails so I think it made a difference, but only time will tell.  I also white listed our own IP address to make sure we did not get locked out if we mis-typed our login credentials.

Madeline with Grandma Linda on the Brighton Mill Pond boardwalk.

Madeline with Grandma Linda on the Brighton Mill Pond boardwalk.

I had an e-mail from my niece, Amanda, with a couple of pictures of her daughter, Lilly, a very pretty and sweet-tempered child about six weeks younger than Madeline.  We saw them in late June and will like try to visit again en route to the southwest this winter, weather permitting.  If not, we will certainly try to stop in the area on the way back in the spring.

When Madeline awoke from her nap we let he play long enough to fully wake up and then we all went to downtown Brighton.  We walked the boardwalk along the east edge of the Mill Pond and saw a Painted Turtle, an egret, some fish, and lots of ducks and geese.  We then took the pedestrian bridge to the west side of the pond where the playscape is located.  The playscape is a wonderful place with structures built to suggest animals and Madeline explored it thoroughly with Grandma Linda’s help while I took pictures.  It also has an area with chalk boards and a mailbox full of sidewalk chalk that the kids can use to draw.  Madeline spent quite a while trying all the different colors.

Madeline with Grandma Linda at the playscape by the Brighton Mill Pond.

Madeline with Grandma Linda at the playscape by the Brighton Mill Pond.

We stopped by Lowe’s on the way home to return the spark plug I bought last night and get the correct one.  By the time we got back to the house Madeline was hungry so Linda got her dinner ready right away.  For our meal Linda prepared a green salad with sunflower seeds and dried cranberries topped with Ken’s Sweet Vidalia Onion dressing (one of our favorites) and a one pot meal of quinoa with black beans, corn, and onions.  Linda and I finished the Red Guitar Sangria with dinner (Marilyn does not drink alcoholic beverages).

Madline working with chalk at the Brighton Mill Pond playscape.

Madline working with chalk at the Brighton Mill Pond playscape.

Madeline played quietly with Linda for a while as I chatted with Marilyn. Before we knew it, it was time for Madeline to go to bed.  The time between dinner and bed always seem short compared to other intervals during the day.  She is always very good about bedtime and went without a fuss.  Linda spent about 30 minutes getting something ready to e-mail to the bakery software vendor while Marilyn played Words With Friends and I researched where we could buy more Red Guitar Sangria.  It is available at the Meijer’s stores in our area and is very reasonably priced so we will probably get some more.  We had apple crisp for dessert after which Linda and Marilyn played three-way online Scrabble with each other and their brother Ron in Pennsylvania.

 

 

"I think this color goes right here."

“I think this color goes right here.”

Madeline is a very good-natured and relatively calm child but when she is awake she is full engaged with the world around her.  We were all tired after a long but very satisfying day of visiting and turned in without watching any TV.

 

2014/09/19 (F) Renewed Acquaintance

After I installed iOS8 on my iPad2 yesterday morning my Logitech Bluetooth keyboard seemed to change its behavior, giving me double letters in some cases and feeling a little sluggish in its response.  The keyboard itself has not changed, so I presume this has something to do with iOS8.  I also presume the keyboard batteries have not run down already, but I suppose that is a possibility.  If so, I will be replacing them once a week.  While creating an image gallery for the SLAARC WordPress website last night I noticed that the drag and drop feature of the gallery editor did not work.  I upgraded to WP Version 4.0 about a week ago but this was the first time I had tried to use the gallery feature.  If there is a problem with this feature there is no way that I am the first person to discover it and I presume WordPress is aware of it.  I find it strange, however, that they have not released a maintenance update fixing it since an improved and more visual editor was a major feature of the 4.0 release.

A few weeks back I re-established contact through Linked-In with a colleague from 10 years ago.  Jim was Director of General Education Services at Livingston Educational Service Agency at the time and we went through NCA Ambassador training together.  It turns out that he lives and works in the Brighton area, so we are now neighbors of sorts.  He suggested we meet up for coffee and I finally called him this morning to arrange that.  We both had time at 1:30 PM today and agreed to meet at the Panera on Grand River Avenue by I-96 at that time.

Linda got the new Global Bake bakery software installed on her laptop yesterday so this morning she was able to start working on the software conversion process in earnest.  Her work requires a lot of concentration, and she gets very focused when doing it, so I went to my office to continue working on editing blog posts and photos.

In checking my e-mail I noticed that I was still getting failed login attempts from foreign countries on this site and on the FMCA GLCC website, which is sub-domain of this site, in spite having installed the premium (paid) version of the Wordfence Security plug-in.  I looked at the installed plug-ins for the GLCC website and discovered that I had one named “Limit Login Attempts” that I did not have installed on our personal website or the other two sites I manage.  I surmised that this plug-in might be doing just what the name implied and in the process preempting Wordfence from ever doing its job.  I deactivated it and saw a reduction in failed attempts, with none from outside North America, suggesting that the country blocking feature of Wordfence was now working properly.  I saw a similar drop in failed login attempts on our personal website when I activated the country blocking feature for all countries except the U.S., Canada, and Mexico.  Only time will tell, however, if Wordfence is indeed blocking login attempts from outside North America.

We had hummus and apples for lunch after which I hung up one load of laundry and put another load in the washer.  I left at 1 PM to have time to stop at Best Buy to get something to clean our various touch screens and monitors.  Traffic was very heavy in the I-96 and Grand River Avenue shopping area, but Best Buy is in the same shopping complex as the Panera, so I made it there on time.  Jim and I talked for almost two hours and which covered the highlights of the last eight years.

Back home I kept my focus on getting the blog caught up.  Linda wrapped up her work for the day and we finished the bottle of Alpha Rose from Red Trail Vineyards while she fixed a simple but tasty dinner of vegan burgers and corn.  I got a call from Butch letting me know that the company in Nevada had arranged for a semi and taken all of the parts they plan to take.  Everything that is left is Butch and Fonda’s to do with as they please.  The important thing for us is that I can now take our bus down there at my convenience.  I would like to get all of the natural gas related work taken care of and put the finishing touches on the garage project before I move the bus, but I may go ahead and move it next week if the scheduling of contractors works out.

During the evening I had an exchange of TXT messages with Chuck.  He had ordered some miniature 24VDC light bulbs (1829s) that are used in our bus dashboards and the order had arrived.  Rather than go to his shop after breakfast tomorrow we arranged to meet him for dinner tomorrow night.  I also got a call from Michele Henry of Phoenix Paint.  She had a new customer who just bought a mid-1990’s Prevost XL converted coach and she gave him my name and phone numbers in case he had any questions about the rig.  We agreed that we would try to find time during the GLCC Surplus and Salvage a Rally to work on the article I started last year about the process she used to repair the body and roof of our coach, seal and coat the roof, and paint the body.  We capped off the evening with the second to last episode of Season 5 of Doc Martin. We need to return the DVDs to the Howell Library on Sunday, so we want to make sure we get through all of the episodes for Season 5.

 

2014/09/17 (W) Hooked Up

I figured Darryll would be here on Friday but he called a little after 8 AM this morning to see if he could come today and finish up.  I was going to check around to see what sort of price and delivery I could get on the boiler conversion, but with Darryll coming this morning I decided it was not worth trying to save a hundred bucks and risk an even longer delay in getting the furnace converted.  I called TOMTEK back and left a message with the secretary, Virginia, to let Tom know that we were getting the gas hooked up to the house today and that we needed him to come convert the boiler at his earliest convenience.  I also assured her that we would be fine without the boiler for a few days as we are not yet into freezing temperatures at night.  The biggest inconvenience will be the lack of hot water for bathing and washing dishes.  Linda can use our microwave oven, induction cooker from the bus, and our electric toaster oven to fix a wide range of meals.  We also have a microwave oven on the bus as well as a Gaggenau 2-burner electric cooktop and we have a Jenn-Air electric range/oven/grill/fryer/etc. in the recreation room in the basement.  We checked out the Jenn-Air when we moved in but have never cooked on it.  Once I get the extension hose with quick disconnect for the new gas grill we will also be able to cook on that if we want or need to.  We do most of our laundry with cold water, so that is not an issue.

Darryll must have called us from the road.  We had just finished breakfast (re-heated homemade cinnamon rolls and fresh grapefruit) and I was headed outside to move the cars so he could back his truck up to the garage when he pulled into the other end of the pull-through driveway.  Most of his work today involved completing the connections from the natural gas meter to the new 2″ black iron pipe and the old 1″ pipe that currently feeds propane to the house.  All of that work was on the east end of the house so he parked his van there to be as close that location as possible.  His dad came with him this time to help out.

We let our dishwasher finish its cycle and then turned off the boiler, closed the gas shut off valve, closed the shut off valve for the line feeding gas to the range, grill, and old breezeway heater (since removed).  Darryll they shut off the propane to the house at the tank and disconnected the supply line and pressure regulator from the house. He disconnected the supply line on the other end from the pressure regulator at the tank and installed a plug in the outlet.  I used short lengths of 10AWG electrical wire to secure the covers on both propane tanks.  The wires are just twisted, and while easily undone, the covers cannot just be pulled up without untwisting them first.

The old pipe that carried propane into the house is below the gas meter to the left and the new 2″ pipe is at the level of the meter and to the right.  The consumer connection outlet from the meter is a 1.25″ threaded nipple coming out of a shutoff valve below the right lower corner of the meter.  Darryll came out of that nipple and installed an elbow going back towards the house, a short piece of pipe and then a T with the opposing ends horizontal.  From there he was able to adapt down to 1″ i.d. pipe going to the left behind the meter and gas line and use various fittings to bring it around and connect it to the old pipe sticking out of the wall.  He put a union in there to make it possible to assemble all of this.  He went to the right out of the T and used an adapter to go up in size to 2″ i.d. and then elbowed up and over to line up with the 2″ pipe running along the side of the house.  He extended the 2″ pipe and somewhere in there installed a 2″ union, again, to make it possible to assemble all of these pieces.  The number of fittings and the geometry of their assembly was fairly impressive but it was a very neat installation when he was done.

This was a big project, and although Darryll is done with his part of the work the project is not finished.  Rather than post photos as the work has gone along I will be creating a page on our website just for this project and posting several photo galleries illustrating the major steps.

We had a small bird of prey in the back yard this morning being badgered by four very large Blue jays.  When sitting on the ground with its wings folded in it was about the same size as the Blue jays, definitely too small to be a Red Tailed Hawk, but I could not get a good enough look at its wings, tail, or underside markings to identify it.  The Blue jays kept swooping down at it and then it would suddenly take flight and go after one of them.  It appeared to be fast and very maneuverable, so I think the Blue jays were playing a dangerous game.

I called Country Squire Fireplace and Lighting and talked to Bob.  We agreed on the 12 foot extension hose kit and Bob said he would get in on order today.  Country Squire only gets deliveries from their American Hearth distributor every other Friday and the 26th is their next scheduled delivery date.  If our order does not arrive then it will be another two weeks before it gets here.  Obviously we won’t be heating the living room before the furnace gets converted or cooking on the grill before we get the new range unless something goes very, very wrong with those items.

I got a call back from Valerie at TOMTEK to let us know they would hold a service appointment for us on Monday, assuming the part comes in by then.  By definition, that has to be acceptable as there isn’t anything I can do to change it.  I have been a bit annoyed with myself, however, for not checking on all of this sooner and contacting TOMTEK sooner so they had the part in hand when it was time.

While Darryll was working on the meter tie-in I unscrewed the brass flare fitting that connected the old propane fire logs to the 1/2″ i.d. black iron supply pipe.  I then removed the fire log unit from the fireplace and moved it to the garage.  There was already a plug sitting in the fireplace box for the end of the iron pipe, but I left that for Darryll to connect after he had spliced a shutoff valve into the pipe outside the house just before it enters the side of the brick chimney and goes into the firebox.

I noted that the dials on the gas meter had not moved since it was installed and pressurized on Monday.  Darryll finished the iron pipe connections, opened the outlet valve, and put natural gas to the house and the new 2″ iron pipe.  After the pipe filled with gas we noted the readings on the meter dials.  He checked for leaks with his soapy water solution and did not find any.  Darryll made a light pencil mark on the 1/2 cu. ft. per revolution (rotation) dial.  He then opened the gas valve to the library furnace and checked for leaks downstream of the valve.  He did not find any so he turned it on and set the thermostat up.  It took a couple of tries to purge the remaining air out of the line and get the burner to light, but once it started it ran really nice.  He then opened the gas valve to the garage furnace and checked for leaks downstream of the valve.  Again, he did not find any so he turned the power on at the ceiling switch, turned the thermostat on, and turned the temperature up to start the unit.  There was only a small amount of air left in the 1/2″ i.d. line and the unit lit right up and purred like a kitten.  (OK, roared like a small lion.)

These are not dramatic moments but they are significant ones.  After numerous visits spanning more than six weeks, and a myriad of steps integrating various technologies, you flip a switch and voila, you have a functioning furnace; or two, in our case.  Darryll let both furnaces run long enough to burn off some manufacturing oils which sometimes produce smoke from the supply registers and cause homeowners to freak out.  He shut the units off at the thermostats and waited to make sure they would actually cycle off.  They did, so there wasn’t anything left to do except pack up and head for home, stopping to get some lunch for his dad on the way.  He will mail us the final invoice once he has it figured out.  It’s nice to do business we people that trust us.

I called D. R. Appliance to let them know we had natural gas to the house and to find out what they do with the old units they haul away.  Curt said they would be able to bring the new unit and install it very quickly after they receive it.  There’s a chance that will be on Friday or Saturday, which would be really nice.  As I suspected (feared) they take the old unit to a dump.  I asked if they would drop it at Salvation Army but they were reluctant to do that, even though I did not see where it would be inconvenient for them.

According to Curt the Salvation Army is very picky about what they will take.  I figured they would go right past the donation center on their way back to the appliance store but Curt pointed out that their next delivery and installation might well be in the opposite direction and he clearly did not want his delivery/installer to go even a little bit out of their way to do this.  Fair enough.  What did not occur to me until later is that a company that sells new appliances might want to get old ones out of circulation.  If so, I think that is shortsighted; folks looking for a used (inexpensive) appliance at a Salvation Army Thrift Store were not going to be customers for a new one.

I called the Salvation Army Thrift Store and Donation Center in Brighton, Michigan, which is actually on Grand River Avenue as you go towards Howell from our house.  They said they would accept the old range as long as it was working.  I told them it was in reasonably good shape, looked OK, and worked fine except for the spark igniters for the stove top burners.  That was fine with them.  They just asked that we mention the spark igniters when we drop it off.  They also had a truck that could come get it if we were unable to get it into our personal vehicle and gave me the phone number to schedule a pickup.  Cool.  That means we don’t have to try and convince D. R. Appliance to deal with it and it does not end up in a scrap yard.

Although I did not do anything particularly physical today I was very tired by 4 PM and took a 2-hour nap.  Linda woke me up at 6 PM to have a dinner of green salad, leftover lentil stew with sweet potatoes and apples, and homemade biscuits with honey.

After dinner we opened a bottle of Alpha Rose wine that we bought in August 2013 at Red Trail Vineyard in Buffalo, North Dakota.  They are part of the Harvest Host network and it was the first place we used our membership to spend the night at a winery for free.  I posted about the place at the time.  The Alpha Rose was absolutely delightful with a very floral nose that carried over into the mouth.  Made from King of the North grapes, it was light but crisp and very pleasant in the finish.  I wish we had bought a case.  The King of the North vines were the first ones planted at Red Trail Vineyard back in 2003 and have done well in the North Dakota climate.  The Alpha Rose is only available at the winery and two other locations in the Fargo, North Dakota area, so I guess we will have to plan our travels to take us back that way.

Tonight was Season 5, Episode 6 of Doc Martin; at least it was for us.  I think Season 5 originally aired in 2010.  I really liked watching it on the TV monitor from a DVD compared to watching it on an iPad.

 

2014/09/16 (T) Boiled Over

Our son (Brendan) texted Linda early this morning to see if we would like to have grand-daughter Madeline spend the night while Marilyn is here next week.  It turns out that next week Thursday and Friday are Jewish holidays, and Madeline attends a Jewish run day care facility.  Of course we said “yes.”

Linda worked at her desk on our personal finances in the morning, worked on her counted cross-stitch project for a while in the afternoon, went on a couple of long walks, and managed to get breakfast, lunch, and dinner on the table.  But as days go, it was fairly low key even for her.

I called Country Squire Fireplace and Lighting in Howell and asked for Bob as I had been instructed to do.  It was Bob’s day off but I got to talk to Mark.  Mark told me that they can get a 12′ hose with a 3/8″ flare fitting on one end and quick disconnect on the other end.  The QD includes the male fitting attached to the hose and the female fitting that gets threaded onto the supply pipe.  We already have a female QD fitting (Marshall Brass BC0102-0600) but it may not be compatible.  I had measured before I called and knew that we needed at least an 8′ hose, so 12′ will work just fine, especially since two feet of it has to go up through the base from the back and then out the top of the base and attach to the grill.  Mark asked me to call back tomorrow and talk to Bob to order it, so that is what I will do.

I double checked online that the range we had ordered was indeed a natural gas model.  It was, so there was no need to call the appliance store to confirm that.  I had a call back from Darryll at DCM Heating & Cooling.  He thought he would be able to come back on Friday or Saturday to hook up the gas from the meter to the house and the new black iron pipe and start up the two new furnaces.  All of the other gas conversion work we need done is dependent on Darryll getting his piece done first and I asked him if it would be possible to come on Wednesday.  He said he would check his schedule and see what he could do.  Darryll has been great to work with, and I try not to be demanding, but I cannot schedule other contractors until there is gas to the house.

I checked the label on our Weil-McLain “boiler” that provides heat for our hot-water baseboard heating system and domestic hot water.  It’s a GV-5, Series 1.  That allowed me to hone in on the right manuals on the W-M website from which I was able to identify the part number for the LP –> NG conversion kit.  It’s a 510-811-630 and consists of an orifice plate and an adhesive label that has to go on the unit.  The unit is a discontinued model, but service parts appear to still be available.  I found the conversion kit at the first online supplier I checked for under $31 (plus S&H) but delivery looked to be 2 – 3 weeks.  Ugh.  I placed a call to TOMTEK HVAC in Howell to see if Tom had checked on this yet.  He hadn’t so I gave him the model and serial number of our unit and mentioned that I had found the orifice plate online.

I worked at my desk for a while uploading blog posts from the last third of August, but it was such a beautiful day that I decided to work upstairs on my iPad2.  I called Bratcher Electric around 4 PM just to give them a “heads up” that we had a meter with natural gas.  Karen gave me Mike’s cell phone number and a time window during which I would likely be able to reach him.  He has been very busy doing estimates for storm damage repairs and has not been in the shop much the last month.  I got hold of him to let him know that we might be ready for them as early as next Monday, but anytime in the next couple of weeks after that would be OK.  Again, I try not to be unreasonably demanding, and I try to be truthful with folks.  Sometimes, however, that just results in us being put at the back of a long line of people who are unreasonably demanding.

Linda made maple baked lentils with sweet potato and apple for dinner.  It really hit the spot on a cool evening.  After dinner I continued working on selecting and editing photos for a gallery post on the natural gas pipeline work.  My cell phone cannot receive calls in the basement but it can receive txt messages and notifications.  Tom had called back from TOMTEK regarding the boiler conversion.  He can get the parts locally in about four days and wants $250 to do the conversion plus $59 for the service call.  A total bill of $310 to install a $30 part (retail) sounded excessive to me, so I may make a few inquiries first thing in the morning before I call him back.

We watched Season 5 Episode 5 of Doc Martin.  It was nice to see it on the TV rather than the iPad with a large screen, better sound, a DVD quality image, and no buffering.

 

2014/09/15 (M) Congratulations, You Have Gas

As I reported in the blog post for this past Saturday a natural gas hookup crew was at our house in the early morning but it was the wrong crew (trench/plow) installing the wrong size gas line (1/2″ id).  The correct crew (directional boring) showed up today around 9 AM and started boring the line for our neighbor’s yard across the street.  I chatted with the crew briefly and they said we were next.  They had placed a large role of the proper size gas line (1″ id) in our yard, so I knew they knew what they were doing.

Ed, who had stopped by on Friday and runs the hookup crew, was not sure whether they would hang the meter and connect the line at both ends today, but if not, tomorrow for sure.  Their presence on site, however, meant that I would need to be in contact with three contractors fairly soon to follow up on arrangements to get them out here ASAP, and in the following order:

  • DCM Heating and Cooling, to disconnect the propane from the house and tie the new 2″ black iron pipe together with the pipe into the house and connect them to the consumer side of the gas meter.  Also, to start up the new library and garage furnaces.
  • TOMTEK HVAC to convert the hot water base-board heating system to natural gas.  Tom was going to check today with Weil-McLain on the parts needed for the conversion and let me know.  Our own research suggested that a natural gas orifice plate was the only part needed, but a number of steps were involved in the installation and I doubt that W-M would sell me the part directly.  (I did find it later online for $31 plus S&H, so I could buy it if I wanted to.)
  • Bratcher Electric; to convert the whole house generator, do the annual maintenance, and run the new service entrance cable for the garage panel.

Mike Bratcher was here a month ago to look at the job but had not gotten a price to us yet for the work.  They have been slammed with repair jobs as a result of late summer storms.  The generator is the least critical component at the moment as it is on its own propane tank, but we want to get it switched in a timely fashion so we can call AmeriGas and have both tanks removed at the same time.

(Ed told me later in the day that Consumer’s Energy requires us to be switched over to natural gas within 30 days of having gas to our meter.  He also said that a recent Michigan law (last year) made it illegal to have multiple fuel sources to a house.  Since the generator is on its own propane tank and that tank is not connected to, or provide propane to, the house or anything in the house, technically we would not have two different fuels going to the house even if we left it hooked up.  Still, we are not looking to create a “situation” with Consumer’s Energy.  Presumably the multi-fuel prohibition does not include electricity and wood.)

Keith showed up around 9 AM to cut the grass.  I chatted with him briefly about cutting the new grass, which had gotten long enough in many spots that I thought it was probably time for the first cutting.  I picked up some small tree branches that were scattered about the yard from recent storms, and warned him about the trench at the southeast corner of the house.  I chatted with him some more as he was finishing up with the string trimmer.  He said the grass was “April grass, not September grass.”  The grass itself (internally) was very moist, not just the soil.

This is how Keith cuts over 4 acres of grass in a few hours.

This is how Keith cuts over 4 acres of grass in a few hours.

Linda had reserved Doc Martin, Season 5, at the Howell Library and had an e-mail that it was available and needed to be picked up by the end of today or we would go to the end of the waiting list.  She needed to be at the bakery by 11 AM so she left around 9:45 AM to be at the library when it opened at 10 AM.  I would have gone to get it but I was “stuck” at the house as long as contractors were, or might be, working here.  I also needed to be here to pay Keith when he finished cutting the grass.

Linda met with the folks at the bakery (where she was the Controller and Treasurer for the 10 years before she retired) on Friday regarding a major software conversion project that she is going to do for them and was finally feeling like we could afford a new range.  She is a very good accountant/CPA and has always worked hard for what she earned, but has always been reluctant to spend money.  We grew up in very different circumstances and that reluctance on her part has provided a good balance over the years as I tend to be less concerned about what things cost and more focused on making sure we have what we need and are getting good functionality and quality for what we spend.  One component of my formal education and work experience was engineering, and that developed a certain way of thinking about things that has stayed with me ever since.  Need is, of course, relative.

We had been deferring a decision about the new kitchen range but decided on Friday evening that, with the natural gas hookup imminent, we would get a new one rather than convert our old one.  We decided on the model we wanted, a G.E. JGB870DEFWW, and knew the price, delivery time, and installation charge from Lowe’s.  I also talked to Curt at D. R. Appliance, a local family owned appliance store, on Saturday and expected to hear back from him today with pricing and availability.  That call came late morning and their price, while a little higher than Lowe’s, was close enough to be worth the possible end-of-week delivery and installation so I told them to go ahead and order it.

By 3:30 PM the gas line to our house was in the ground and the meter was mounted on the side of the house but a crew was still digging out by the street trying to clear access to the main line so the fuser could tie our line and our neighbor’s line into the 2” main line.  My camera battery went dead while they were installing the meter so I grabbed a few shots on my cell phone while the camera battery recharged.  Linda got home around this time and got to see some of the final steps in the process.

I followed the process closely all day and tried to get photos of most of the details, especially as they hung the meter, tied the line in, and pressure tested it.  All was good, so they tapped the main line and we finally had gas in our branch line.  They purged the line, reconnected it to the meter inlet, tested the meter and connections for leaks, and then verified gas availability to the outlet connection.  At 5:30 PM they plugged the outlet, put the hang tags on, and handed me the door knocker tag that said “Congratulations, you have gas.”

We always seem to have interesting things in our yard.

We always seem to have interesting things in our yard.

Linda took a call from Bob at Country Squire Fireplace and Lighting regarding our quick disconnect for the Broil King outdoor grill.  She indicated that I was busy with the gas crew and would call them back tomorrow.

Late last week we received an invitation to a political fund-raiser for Brian Robb, an incumbent councilman in Ypsilanti, Michigan.  We do not live or vote there, but Brian is Kate de Fuccio’s significant other, and Kate is a former co-worker of mine and continues to be a very good friend of ours.  I called DCM Heating & Cooling and left a message for Darryll that we had gas to the meter.  We left around 6 PM and arrived at the Tower Inn Cafe around 7 PM.  We made a donation to Brian’s campaign and Kate ordered a small vegan pizza for us.  We visited for about an hour and then took our leave.

When we got home we relaxed in the living room thinking about how nice it will be to have our natural gas fire logs while we had some fresh strawberries and nectarines for dessert.  I also had a mug of hot apple cider which put me in the mood to go to bed.

 

2014/09/13 (S) Overnight Guest

Linda’s sister, Sister Marilyn, called a couple of days ago to let us know she would be in the Detroit area on business this weekend.  She wanted to know if we could fetch her this afternoon and if she could spend the night at our house?  The answer was “of course,” of course.  Her flight out wasn’t until Sunday evening, so Linda put the gears in motion and arranged a brunch with the local family for 10 AM tomorrow.

Being Saturday, we went to our ham radio club breakfast in South Lyon.  Before leaving our neighborhood we drove to the other end of the street (dead end with turn-around) to see where the gas hookup crew left off yesterday.  We knew they were working down there today because we saw the trucks leave sometime between 5:30 and 6:00 PM last night.  There’s a chance they will be back today and we wanted to see how close they were to connecting our house to the main line.  It looked like they had quite a few houses to do ahead of ours, so we went to breakfast.

We got home around 10:30 AM to find a crew working in our yard trenching in the branch line to our house.  I was told yesterday they were going to bore it in, so something obviously did not get communicated.  Not only that, they were running a 5/8″ line, which was way too small for the 425 meter we are supposed to get.  I stopped the crew and the guy in charge pulled out his paperwork.  It had “425” written on it big letters, but the drawing showed a 5/8″ line.  He agreed that the 5/8″ line was way too small for that meter and that we should have 1.25″ line.  They pulled the little bit of line they had already run out of the ground, raked out some of the dirt they had already trenched, and moved their machine across the street to trench our neighbors yard.

We were lucky we got home when we did.  They had already cut through some tree roots that did not need to be disturbed and would have torn up a lot more of our yard unnecessarily if I had not interrupted their work.  They were nice about it, but I still found it troublesome that I had spoken to two different supervisors face-to-face about this, one as recently as yesterday, but this crew showed up and did something different than what I had been told, and agreed, would be done.

I was finally going to try to remove the fogged window from the bus today, but we had a lot of rain overnight and woke to overcast skies, temperatures in the upper 40’s, and a forecast high of 57 degrees F with a strong chance of rain through mid-afternoon.  That was not the sort of weather for removing a window from a vehicle parked outside.  Besides, with Marilyn arriving mid-late afternoon I did not want to work on anything messy and then have to get cleaned up.

Linda looked up the kitchen ranges we had been considering.  The GE 30″ 5-burner double-oven convention model (JGB870DEFWW) was on sale again at Lowe’s for $180 off MSRP and we would get another 5% off the sale price by using our Lowe’s credit card.  If we ordered it today delivery would be September 27, longer than I would like, but it is what it is.  We have to order this range because Linda wants a white one to match all of the other appliances in the kitchen and the appliance stores do not tend to stock white ranges with the features we want.  I called our local Lowe’s store and confirmed the free delivery and take away of our current range.  Installation is $20 plus a new flex gas line for $30.

I called TOMTEK HVAC and got hold of Tom.  He seemed put off by the fact that I have someone else doing HVAC work at the house and will have the natural gas already tied in when he comes to convert the main house furnace from propane to natural gas, but he said he would check with Weil-McLain on Monday about what parts he needs to do the conversion.  While on the phone with Tom he suggested that we try D. R. Electric Appliance Sales and Service in Howell for our new gas range.  We looked them up on the web and got their (incorrect) phone number and hours.  I got the correct number from 411 before I realized that it was also on their website.  They closed at 2 PM on Saturdays, so we didn’t make it there today, but I called and got an answering machine, left my name, number, and the reason for the call.  Curt called me back a short time later.  I gave him the model number and he said he would call G.E. on Monday.  He said he had been holding off ordering G.E. appliances waiting for Columbus Day sale pricing.  He figured he would have the range three days from ordering and could probably install it at the end of the week or early next.  They charge $25 for installation and haul away, and $25 for the new flex gas line if we need one, so it’s the same $50 as Lowe’s.  (Lowe’s assured me that they were REQUIRED to install a new flexible gas line.)  That all sounded good depending on the price of the range.  Getting it sooner has some dollar value to us, we’re just not sure how much.

I stayed home while Linda went to Meijer’s for groceries.  Finding the crew in our yard this morning doing work they were no supposed to be doing spooked me enough to not want to leave the house unattended the rest of the day.  As long as I was stuck at home, I called Bratcher Electric to give them a heads up that the gas connection to the house was imminent.  Being Saturday I got their answering machine and left a message.  I also called Darryll at DCM Heating & Cooling and left a message regarding the gas connection.  Once the meter is hung and connected everything else depends on Darryll getting his piece done first.

We checked the website for Country Squire Fireplace and Lighting in Howell and saw a 10% off coupon, so I printed that.  I wanted to go there today and buy a set of high-efficiency vent-free natural gas fire logs but it will probably be tomorrow afternoon instead.  These logs are more efficient than a typical kitchen range and are designed to be used with the fireplace flue closed, throwing most of the heat they produce into the room instead of up the chimney.  Darryll said he would hook it up for us and add a shutoff valve when he came back to tie in to the gas meter, so we need to have it here before he comes back next week.

Marilyn called and said their flights were running a little behind schedule and that Linda should pick her up around 3 PM rather than 2:30 PM as originally planned.  She called back again and said 3:15 PM would be better.  Linda got back from the grocery store and we had a quick lunch of leftover Sloppy Joe’s.

With overnight lows in the 40’s, highs only in the mid-50’s, and the connection of our natural gas somewhat imminent, we decided we could afford to use propane to heat the house.  We have been conscious of our propane use because we did not want to get in a position where we needed to have either of the tanks filled.  I turned the furnace on and set all the thermostats a few degrees above ambient to take the chill off.

While Linda drove over to Lake Orion, Michigan to fetch Marilyn I decided to work at my desk selecting photos for gallery posts on the garage/HVAC project and natural gas work, and worked a little bit on the websites for the FMCA Great Lakes Converted Coaches and Freethinkers chapters.  I really need to have the GLCC site usable in the next three weeks and the FTH site within a month of that. That sounds ambitious even as I write it down and I suspect it won’t happen.

Linda and Marilyn got to the house around 4:30 PM and after we got Marilyn settled in her bedroom we just sat and relaxed and talked for a while.  We thought she might appreciate a good home-cooked meal but we ended up taking her to LaMarsa for dinner.  She had the Koshary, which we had last night, and we split an order of garlic almond vegetable Ghallaba with green salad and crushed lentil soup.  We all ate way too much pita bread with garlic spread and were uncomfortably full by the time we finished our meal, but it was delicious and we did not have to prepare it or clean up afterwards.

These days twilight now comes around 7 PM and it was dark by the time we got home at 8 PM.  I made a pot of decaf coffee and we settled in the living room for a long chat.  I set the thermostats back before we turned in for the evening as all three of us prefer to sleep in a cool room.

 

2014/09/12 (F) Posted

Linda was up very early to try and beat the morning rush inbound to Detroit from the northwest.  I took an Ibuprofen and went back to bed, finally getting up at 7 AM.  1-800-PACK-RAT was scheduled to pick up the 16 foot long storage container we have had in our driveway for the last two months and I wanted to be up and dressed when they arrived.  I did not have any problems with my teeth overnight.  They felt OK this morning but the upper right was still a bit sensitive to biting pressure.  I had a nice soft banana for breakfast and decided to keep taking the Ibuprofen and Tylenol.

I put a load of laundry in the washer and then ran out to take care of errands.  I stopped at Dunkin Donuts for coffee, Lowe’s for solar salt for the water softener, and then Teeko’s for coffee beans.  Jeff still did not have the Sweet Dreams decaf blend even though he orders it every week.  I got a pound of the Seattle Blend 50/50 regular/decaffeinated, and a pound of regular Brazilian Serra Negra to blend with the decaffeinated beans we already had at home.

Heather, from Root Canal Specialty Associates, called around 9 AM to check on me.  I mentioned the sensitivity and she said that was normal and to keep taking the Ibuprofen/Tylenol through the weekend to counteract any inflammation and/or discomfort.  She wanted to know if I thought the temporary filing was high and making contact before the other teeth.  I wasn’t sure, but she said if it was to call them Monday morning and they would get me in to adjust my bite.

Since I was on the phone anyway I called Bratcher Electric to see about the quote/estimate for the generator service / fuel changeover and the service entrance feed from the transfer switch to the sub-panel to change it into a main panel.  They have been very busy with repairing damage caused by the storms of the last few weeks.  We did not suffer any damage beyond some dead branches breaking off from trees, but south of us folks were hit much harder.  That kind of work always takes priority.

The day was overcast and dreary with morning temps in the mid-40’s and a high of 54, but that was OK; it was a perfect day for sitting at a desk and working on a computer, undistracted by either bad or gorgeous weather.  I did, however, bring my computer upstairs and work at Linda’s desk.  My office is very nice but it is in the basement and it is a bit of a cave.  Sometimes I like that, and sometimes I don’t.  I worked on our blog until early-midafternoon and finally uploaded posts from Aug 2 through Aug 20.

My only interruption was a visit from one of Roese Construction’s field supervisors who was checking on where the runs will go to connect the houses in our neighborhood to the natural gas main.  After looking at our situation he agreed with me and Mel who had looked at this a few weeks ago, that staying to the east of the east entrance to our pull-through driveway made the most sense even through it required them to bore at an angle relative to the main line.  That conversation confirmed that they will be horizontal boring the branch line rather than trenching it in.  He did not give me a firm date, but it sounded like it could be as early as tomorrow (Saturday) and likely by Tuesday next week.

My computer battery was down to under 1 hour of charge remaining, so I took it downstairs and plugged it back in to its power supply.  While I was down there I put another load of laundry in the washing machine.  Back upstairs I made a PB&J sandwich for lunch, along with some green tea.  I got back on the RVillage Mobile development site, played with a few more features, and provided some additional feedback to the development team.  I then worked on this post using my new Logitech Bluetooth keyboard.  The Wacom Bamboo stylus is nice, but the keyboard is the way to go when creating extended text.

Juniper, our female cat, was getting into something in the library so I went to investigate.  She had cornered a yellow jacket and was trying to figure out what to do with it.  I solved the problem for her by capturing it and putting it outside.  I don’t think she was pleased with my solution, but not 20 minutes later she was at it again, and it was another yellow jacket.  We have a nest in the soffit near the library that we need to get rid of, but we have not had a problem with them getting into the house until very recently.  Hopefully that has not changed but I will have to investigate the situation.  It may be that with the onset of cooler temperatures they are finding their way into the library through the recessed ceiling downlight cans.  If so, there’s really no good way to seal those.  Fortunately we can close of the house from the library with a kitchen door and a living room doorwall that includes a screen door.

It started raining very lightly around 4 PM, but never developed into anything.  Linda got home from the bakery at 5:30 PM.  The storage container had not been picked up yet so we called the 1-800 number and left a message with our callback number.  I got a call around 6 PM from the local (Plymouth, MI) office verifying the pickup and address.  The driver arrived around 7:20 PM and had the unit loaded by 7:30 PM.  After he left we headed to dinner at LaMarsa where we had crushed lentil soup and split an order of Koshary and salad.  Even splitting the dish we both ate too much, aided by the fresh-baked pocket bread and garlic spread.   The food and service were both excellent, as always, and the garlic spread was “…the gift that keeps on giving.”

We got back from dinner a little before 9 PM, too late to start any in-depth computer work, but early enough for me to finish this post and for Linda to do some recipe research for Sunday’s brunch.  It seems like only yesterday it was still light at 10 PM at night, but we are approaching the autumnal equinox, and there are noticeably fewer hours of daylight now.

 

2014/09/05 (F) WordPress 4.0

We awoke to temperatures in the low 70’s this morning and by noon it was forecast to be 85 degrees F with rapidly rising humidity.  We turned our A-C on yesterday and left in on overnight and through the day today.

WordPress 4.0 was released yesterday and just before midnight I updated the four websites I manage, including this one.  I was looking forward to working with the new version today, but first things first.  Darryll called at 8:15 AM to make sure it was OK to come over.  We finished breakfast and then opened the garage and moved a few things that might be in his way. Although we would have liked to continue working in the garage during the morning, before it got really hot and humid, we were glad to have Darryll here working on the HVAC installation.

Instead of working on organizing the garage Linda worked at her desk and baked a loaf of bread while I assisted Darryll.  He wired up the library thermostat and showed me how the wires were connected.  He installed the return air grill, which required some minor drywall trimming, and installed a 6″ combustion air duct in the ceiling of the utility closet.  The duct had a screen on one end with a hood, like a dryer vent, and was open on the other end.  He installed it from the attic side with the hood in the attic and the open end sticking down through the ceiling into the closet.  I may decide to caulk or apply drywall compound to fill that gap between the duct and the hole Darryll made in the ceiling.

Darryll’s main focus, however, was hooking up the four pieces of duct, two rigid and two flexible, that will carry conditioned air into the library and installing the two ceiling registers.  That involved working in the attic which was very hot.  The flexible duct for the two ceiling registers was the same kind of product that was used in the main house; a pre-insulated flexible accordion tubing with an 8″ inside diameter that comes in 25′ lengths compressed to about 3′ for shipping.  To feed the two registers on the lower part of the west wall of the library he cut lengths of 8″ diameter (circular cross section) metal duct and assembled them.  He attached them to the supply air duct (plenum) with flange connectors.  He then slide insulation blankets (tubes) around them and connected the bottom ends of the duct into the back of the register ducts using several elbows to bring the duct around and close to the wall.  Finally, he slid the insulation down and secured it.

While Darryll was doing all of that I finished connecting the AC power to the condenser/compressor. That involved the following:

  • removing the terminal cover panel from the inside of the fused disconnect box
  • knocking out access holes on the right side and bottom
  • mounting the fused disconnect box to the side if the house
  • cutting a piece of 3/4″ plastic conduit for the cable from the soffit to the box
  • running the NM cable through the conduit
  • installing a watertight 90 degree elbow into the conduit
  • attaching the elbow to the side of the box
  • cutting, stripping, and connecting the line wires
  • cutting the plastic armor on the hookup cable to the right length
  • installing a straight screw-in watertight connector on the box end of the armor
  • installing a screw-in 90 degree elbow watertight connector on the condenser end
  • cutting, stripping, and connecting the load wires in the box
  • cutting, stripping, and connecting the load wires in the compressor.

I had Darryll check my work and then installed the fuses in the pull-out disconnect but was not able to get it to plug all the way in.  Darryll bent the blades slightly and got it to seat fully.  (I need to get two different fuses.  All he had were 30A fuses but 20A would be sufficient.  Also, the fuses he had in his truck were notched on one end.  I think fuses with full barrels on both ends would be better as they would have more contact surface than the notched ones.)  I reinstalled the terminal cover panel and closed the box.  I then re-installed the cover panel on the A-C compressor that Darryll had removed earlier.

With the power connected and most of the ducts run, we turned on the 120VAC/15A circuit breaker (for the unit in the utility closet) and the 240VAC/20A circuit breaker (for the compressor/condenser).  Darryll turned the thermostat mode switch to “cool” and the fan switch to auto and the A-C came to life.  Hooray!  I love it when that happens.

While Darryll finished installing the ducts and the registers I connected and mounted the thermostat for the garage furnace and then connected the wires on the other end of the cable to the terminals on the back of the unit according to Darryll’s instructions.  I removed the end panel from the Reznor ceiling-mounted garage furnace, removed the documentation packet from the inside, checked that the gas valve was in the “on” position, and put the end panel back on.  I also removed the protective plastic film from the bottom of the unit.

Darryll gathered up his tools, extra parts, and unused materials and loaded them in his truck. He then pressurized his portable air compressor and used it to pressurize the black iron gas pipe.  It has not been holding pressure, so he pumped it up to 15 PSI and we went in search of leaks with a spray bottle of soapy water.  We used my inspection mirror to see behind and under connections and found three leaks.  One was in a 2″ pipe fitting behind the garage, one was in a 2″ pipe fitting near the end of the run by the generator, and one was at an elbow in the 1/2″ pipe where it exits the utility closet on its way to the garage furnace.

Darryll was checking air temperature readings at the registers and in the main plenum of the library HVAC unit.  The library was 89 degrees F when he first turned the A-C on, and the attic was a lot hotter than that.  He connected his gauges to the compressor/condenser and said the readings were close enough to correct that he did not want to add or remove any refrigerant until the room had cooled down and stabilized at the requested temperature.

I was hoping he would get the job finished today but he needed some equipment, which he did not have with him, to work on the iron pipe and he was obviously tired from a long day working in the high heat and humidity.  He may be back tomorrow; if not, Monday or Tuesday. Whenever he returns, I have complete confidence that he will get it done before the gas meter is hung and that it will all work correctly for many years with very little attention other than changing a filter once or twice a year.

We deferred lunch until Darryll left.  We had chickpea salad on a slice of the bread Linda had baked earlier, corn-on-the-cob, and the last of some fresh pineapple.  Nothing says “summer” like organic, non-GMO corn-on-the-cob.

After lunch I called Bratcher Electric to check on the status of the estimate/quote that Mike was putting together to service our generator, convert it to natural gas, and run a 100A Service Entrance Cable from the transfer switch to the garage panel, converting it from a sub-panel to a main panel.  Karen said they have been really busy but he would work on it over the weekend.

I also called 1-800-Pack-Rat to arrange pickup of the storage container on Friday September 12th.  Steven was not able to schedule the pick-up during the call and said he would contact the local office and get back to me.  I made it clear that we did not want to roll over into another billing cycle and I was calling one week ahead of time as we had been instructed.  He assured me that it would not be a problem.  About an hour later we got a return call and follow up e-mail confirming pickup for Friday, September 12.

Late afternoon I checked on the library A-C to make sure it was not freezing up.  Everything looked OK.  The thermostat was set to 76 degrees F and the temperature was down to 77, so I bumped the setting up to 78 to let it cycle off and on.  Although Darryll did all of the heavy lifting on this project (literally) I spent my fair share of time in the attic on warm days installing the pull-down folding ladder and working on electrical wiring and attic lights.  It was very gratifying to see that all of this work—his, mine, and Linda’s—finally result in something that operated correctly.

We were relaxing and reading when severe weather watches and warnings for our area started arriving on our iPads.  Naturally we went outside to see what was going on.  We were both born and raised in the Midwest, the St. Louis, Missouri area, to be exact, and as kids in the 1950’s, threatening weather was a form of summertime entertainment.  Not that we were stupid; we learned from the adults around us when the show was over and it was time to head to the basement.  When I was about 5 years old we lost a plum tree in our backyard to a close encounter with a tornado.

The gathering storm.  The clouds were very dramatic in all directions.

The gathering storm. The clouds were very dramatic in all directions.

The clouds were very dramatic but eventually gave way to a formless mass of gray with swirling winds and a few raindrops.  We checked the Weather Channel app and the Weather Underground Wundermap app on our iPads.  The radar returns showed that we were likely in for some rain, and we got some, but as often happens the worst of it passed north and south of us.  The rain we did get was very welcomed.  We had heavy rain on Monday (Labor Day), Keith mowed the grass on Tuesday, I spread grass seed around on Tuesday and Wednesday, and a flock of six wild turkeys feasted on the grass seed on Wednesday and Thursday. We needed a nice light rain to help the seeds germinate and take root rather than be eaten or washed away in a thunderstorm.

Storm clouds looking east.

Storm clouds looking east.

Around 7:30 PM our power flickered several times and we received e-mail messages from our generator letting us know that utility power had been lost and then quickly regained.  We decided to check the Kohler OnCue software to see what the generator was doing.  We thought sure we had installed the software on Linda’s computer, so we could monitor it from her desk in the kitchen/dining area, but it wasn’t there.  After much searching and head scratching we checked my old laptop and there it was!  When we thought about it we realized that the generator had been installed about a week before Linda started configuring her new Samsung laptop, so there was no way we had put the software on her machine.  We’ve been very, very busy the last 20 months, so it was not surprising to us that we had forgotten the exact sequence of events.

20140905-08295

Approaching from the southwest the clouds got more ominous.

The severe warnings expired at 8 PM and the severe watches at 9 PM, but that did not mean the rain was done.  A big fetch of moisture was located south of Chicago, Illinois and moving through southwest Michigan in our general direction.  The rain was forecast to continue into the early hours of tomorrow but be done before sunrise.  When the rains finally came it rained hard for a while.  Tomorrow is forecast to be a perfect Michigan day and I plan to buy another bag of grass seed to spot seed the areas that got washed away, again.

 

2014/09/04 (R) More Organized

Darryll did not call last night so we knew he would not be here today. That gave us another day to work in the garage.  We moved things around, cleaned, sorted through stuff, decided what to re-store, and where, and what to add to various disposal collections.  We are pretty sure the old window A-C unit is going to our son’s house, so we loaded it in the Honda Element, which got it out of the garage.  Linda also loaded some old video and satellite TV electronics in the car to take to Recycle Livingston tomorrow.

We were making good progress and decided to stick with it and then have a slightly later lunch.  We removed all of the doors from some old kitchen cabinets, upper and lower, in the northwest corner of the garage.  We plan to eventually remove these cabinets, but not this year.  Without the doors we will be able to see what is stored in them, or at least that something is stored in them.  We moved a set of small parts bins and a bookcase which allowed us to reposition two work benches.  That, in turn, allowed us to move the radial arm saw and finally set the saw on the base and secure it.  It is now in a place where I could use it if needed, if it had power.  It requires a 240VAC/15A outlet.  I bought and installed a 30A double pole breaker in anticipation of this, so I will have to get a 15A breaker instead.

The weather forecast for today and tomorrow was for warm temperatures becoming hot with increasing humidity and chances for rain.  We closed the house up at lunch time and turned on the A-C.  We have hardly used it this summer, but have appreciated having in on those few sultry days.

We watched our current resident flock of wild turkeys—three adults and three young that have been in the area for a few weeks now—forage in our back yard while we ate lunch.  After lunch Linda decided to make banana bread as we had several bananas that did not get eaten fast enough.  She was researching dinner recipes when I went to my office to work on computer tasks.  Except for a dinner break, I worked late into the evening on the following:

  • Cleaning up (filing or deleting) e-mails
  • SLAARC Website user maintenance
  • Updating WordPress websites (ver 4.0 was just released)
  • Social media sites (RVillage, Facebook, Linked-In)
  • Editing daily blog posts
  • Off-loading digital photographs
  • Organizing photo storage

BTW:  Dinner was a new dish, a pineapple quinoa stir-fry with cashews, ginger, scallions, a little bit of hot peppers, and several spices/seasonings including fresh basil that Linda has been growing in the northwest corner of the kitchen where there is good light. It was excellent.

 

2014/09/03 (W) Pine Cone Midden

After breakfast Linda downloaded the Hanks Writer to her iPad2 while I downloaded three app updates to mine.  After checking in on the blogs that I follow, I spread some grass seed around the bare and thin spots in the back and west side of the yard by the house.  I wanted to take care of that while it was cool and the ground was still damp with dew from the overnight lows in the upper 50’s.

Darryll did not call last night, so I did not expect him to be here today.  Our son might be interested in the old window air-conditioner so we moved it to the southeast corner of the garage and plugged it in to make sure it worked.  It did, so I sent him a text message to that effect.

We cleared off the table we have been using to cut drywall and got the 1/4″ birch plywood panel that will be the front of the box that encloses the electrical sub-panel and cables.  We measured carefully, twice, laid out the cut lines, and checked the measurements again.  We got the center cutout very close to correct on the first try and only had to trim it a little bit in one corner to get it to fit around the panel box.  We did not secure it place as we still need to feed the thermostat cable through the wall and put some insulation in the wall cavity to the left of the panel as this is an outside wall.

With the carpentry work done we started cleaning and reorganizing the garage, making sure that Darryll will still have access to things he needs to work on.  We plan to have the storage pod picked up on the 12th or 13th, so even though Darryll is not quite finished, we were anxious to start working on the rest of the garage.

We moved the tools and supplies we’ve been using to the three new shelving units on the east wall of the garage.  We then unloaded two shorter units and two tall units on the west wall and spread everything out on the floor.  We moved the units to the northeast wall, the shorter ones fitting nicely under the low end of the flue where it exits the utility closet wall.  We went through the stuff on the floor and put some of it in the trash, set some of it aside to recycle, designated a few things to go to the Salvation Army, collected RV parts in boxes to take to the GLCC Surplus and Salvage rally next month, and put the rest back on the shelves.

We took a break for lunch and then finished up in the garage for the day.  Linda worked at her desk and I changed out of my construction clothes into something more suitable for working at my desk.  She made marinated baked tofu cubes for dinner, with sautéed green beans and corn-on-the-cob (organic and non-GMO, of course).  We sat on the deck and watched our resident American Red Squirrel gather pine cones and move them under the cluster of three big fir trees where we presume it has a nest and pine cone midden.  These trees have never been trimmed and the lower branches are sizable and long and the ends rest on the ground.  I peeked in there the other day but did not see pine cones piled around any of the trunks like I expected, so I’m not sure where the midden is located.

I was up later than I should have been but I finished reading Big Lake Scandal.  The fifth book in Nick Russell’s Big Lake murder mystery series, it was a good read.  Nick has created an interesting place with interesting characters and reveals a little more about them with each volume.  He is particularly good at capturing the way people might actually talk to one another on a daily basis in a small western town.  He should know; he has spent a lot of time in such places over the years.

 

2014/09/02 (T) No More Painting

After breakfast Linda worked on the financial and membership records for our GLCC RV chapter and I took care of a couple of e-mails.  Keith showed up to cut the grass, which he managed to do in spite of the wet conditions from yesterday’s heavy rains.  After chatting with Keith for a few minutes I started to resume work on “the project” but decided to look for the tub of grass seed and fertilizer we brought from the old house.  I found it rather quickly and we still had a partial bag of grass seed, so I spread it around the front yard by hand filling in the bare and thin spots, of which there were plenty.  Our flock of wild turkeys was back today.  I think they like the grass seed I put out for them.

Wild turkeys gather in and around the fire pit.  No...we do plan to cook them.

Wild turkeys gather in and around the fire pit. No…we do not plan to cook them.

I sanded the drywall compound in the library and applied another thin layer.  I’ve been applying non-overlapping horizontal strips of mud, letting them dry, sanding them smooth while feathering the edges, then repeating the process for the areas in-between, or outside, the previous strips.  I will eventually turn this 90 degrees and apply the strips vertically.  The last set of steps will be to fill around the outside of the opening, feathering everything back to the existing wall surface and sanding it smooth with the central part of the patch.  We don’t want it to be obvious that there was ever a hole in the wall.  Once the drywall patching is done I have to prime the new compound and then paint the entire wall.

The paint on the east wall of the garage and the outside of the utility closet looked good and the paint on the inside of the utility closet looked good enough; it is, after all, the inside of a furnace closet.  I was done painting, at least for now, which should have felt like a big deal, but it just meant I could wrap up a couple of things and move on to the next thing.

The first thing was to mount the electrical box on the wall to the left of the library HVAC unit, make all the wiring connections, screw the switch into the box, and put on the cover plate.  I routed the thermostat wire alongside, and zip-tied it to, the armored AC power cable.  The second thing was preparing the mounting holes for the garage furnace thermostat on the outside of the utility closet wall.  I then cut the thermostat cable to the correct length beyond the wall, removed the outer sheath, stripped the ends of the wires, and secured the cable with a zip tie to prevent it from slipping back into the wall.  I did not actually mount the thermostat, however, since I was going to wait for Darryll to connect the wires.

Three adults and three young.  They are large and impressive birds.

Three adults and three young. They are large and impressive birds.

By then it was time for lunch, after which Linda left for her dentist appointment in Dearborn.  I wanted something easy to do, so I assembled the three plastic shelving units I bought at Lowe’s yesterday.  They went together easily, but one was missing the feet, top caps, and wall brackets and another one had a defective top cap.  I put them against the east wall of the garage and the floor was flat enough that they lined up well, so I don’t necessarily need the feet.  But the top caps are important, and it bugs me that I did not get everything I paid for.

The next thing I decided to tackle was the wood box in the utility closet that will enclose the electrical sub-panel and make it appear to be recessed and hide all of the electrical cables.  I cleared off the table we have been using to work on sheets of drywall and stood the scrap pieces of drywall against the back wall.  I got the two 8-foot 1×10’s I bought yesterday, put them on the table, made careful measurements and then marked them.  The two side pieces needed to be 52″ long x 7-1/4″ wide, with notches to create clearance for the top plate, horizontal blocking, and electrical cables passing through holes in studs.  I cut them to length with the Rockwell circular saw, and then ripped them to width using the Craftsman band saw.  The band saw had not been used in years but it had no problem ripping each board.  The notches were made with our Porter-Cable saber saw.  This kind of work is a pleasure when you have the right tools.

I screwed the two side pieces into place and then measured and cut a bottom cross member, and a trim strip to go below it, and installed those with screws.  I then cut a top cross member and a backing strip to go behind it between the two side pieces.  When I was done I had a box that would support a 48″ high by 33″ wide 1/4″ thick plywood panel with the outside face flush with the front edge of the sub-panel once I cut a rectangular opening in the plywood to allow it to fit around the box.  The plywood panel will be secured around the edges with a few screws and the sub-panel cover plate will overlap and cover any gap between the panel box and the opening in the plywood.  I will finish the plywood panel tomorrow or Thursday depending on when Darryll returns and how much I have to work with him to get the power connected to the new A-C compressor.

Jasper the cat in the kitty tent on the deck.  He spends a lot time looking around and sniffing the air when he is out here.

Jasper the cat in the kitty tent on the deck. He spends a lot time looking around and sniffing the air when he is out here.

That was the end of my project work for the day so I took a shower and put on some clean clothes.  Linda poured a couple glasses of wine and we sat on the deck and enjoyed an absolutely beautiful late summer Michigan evening.  We brought the kitty tent out so Jasper could sit outside with us.  Linda threw a green salad together, followed by the leftovers of the penne pasta dish and Italian bread she made for dinner on Saturday.  As twilight set in we moved inside and I decided to go to Lowe’s for some grass seed.  I figured if the soil was still moist first thing tomorrow morning I would spread it around the bare and thin areas in the back and on the west side of the garage, of which there are plenty. Otherwise I will wait until just after the next rain.

I started reading Big Lake Scandal last night and continued with it this evening.  It’s the 5th and latest book in the Big Lake murder mystery series by full-time RVer Nick Russell.  Nick is a good writer, but he and his wife, Terry, are personal acquaintances, which makes reading his books that much more fun.

 

2014/09/01 (M) A Day To Labor

One of the odd things about being “retired” is that holidays, like weekends, do not have the same significance they had when we were employed full time.  We no longer have “3-day weekends.”  We also do not have a tradition in our family of gathering on the summer holidays, so those days tend to blend into the days around them.  If not for our Saturday morning ham radio breakfast and the Sunday morning Howell Farmers Market we probably would not know what day of the week it was.

Knowing that today was Labor Day, Linda prepared vegan cinnamon rolls yesterday and baked them first thing this morning.  This was the first time she has made these and they were a real treat. Vegan, yes; whole plant-based food, not exactly.  These will be a rare treat for us.

As has been my pattern for the last few weeks, I sanded and touched up drywall first thing after breakfast.  Most of the drywall compound was finally smooth enough that I felt it was ready to prime.  I discovered that I was out of primer, so I went to Lowe’s to get some and picked up a few other things while I was there.  It was very humid today, which tends to slow the drying of paint, but primer is thinner than paint and gets absorbed into the paper drywall covering   I was hopeful that I might get a first coat of paint applied this evening.

Mike (W8XH) sent an e-mail Saturday evening to the members of the SLAARC announcing the availability of the new WordPress website and indicating that they would each be receiving a unique username and password from me in the next few days.  I wanted to wait at least 24 hours before I started creating users.  That waiting period had passed, so today I parked myself in front of my computer and registered users.

Part of the registration process required me to create a username.  That was easy for a ham radio club as (almost) everyone has an FCC call sign.  It also required a valid/unique e-mail address.  When I created an account an e-mail, with their username and a randomly generated password, got sent to the e-mail address I entered.  The e-mail also contained instructions on how to get to the website, how to login, and how to change their password.  I finished creating the last user account around 9 PM, but I did not work on this between 5 PM and 8 PM.

The vegan cinnamon rolls made for a filing and somewhat higher calorie breakfast, so we skipped lunch today and had an early dinner.  I had requested a picnic type of meal to celebrate the end of the summer tourist season, and Linda fixed a nice one.  We had vegan potato salad, corn-on-the-cob, and pan-grilled tofu slices with BBQ sauce and caramelized onions served open-faced on some of the Italian bread she made for dinner on Saturday.  Dessert was watermelon balls.  And the wonderful thing is that I am maintaining a good weight.  Eating well and eating healthy are not mutually exclusive.  However, like low-fat and fat-free foods, and then gluten-free foods, the processed food industry has discovered a “market” for foods that are free of animal products.  That, however, does not mean they are free of unpronounceable chemicals or excessive amounts of sugar and salt.  There is a growing amount of vegan junk food available in the marketplace.

We spent a little time after dinner on the back deck watching wildlife as a storm front approached from the west.  As the wind kicked up we lost our AT&T DSL connection and then our phone went out, exhibiting the same behavior we have had throughout most of August.  I shut down my computer and changed back into my work clothes to do some painting.  I put a coat of paint on the east wall of the garage and both the inside and outside of the utility closet.  It started raining really hard so I had to close the garage door, which cut down on my light, but eventually the rain let up and I was able to open the garage doors again.  The inside of the utility closet may need another coat, but I think that most of the outside of the closet, and the east wall of the garage, may be done.  That means I can finally mount the thermostat for the garage furnace and put cover plates back on switches and outlets.

I am still working on the outside of the south wall of the utility closet (with the door).  I am using drywall compound to create a smooth transition at the hinge edge of the door to correct for a carpentry error I made when installing the door much earlier in the project.  The transition will make it possible for me to install trim around the door, but I have to build up the transition in thin, tapered layers, allow it to dry, sand it smooth, and repeat the process over, and over, and over.  Ditto for the west wall of the library, which is the other side of the east wall of the garage, where I am building up a slightly recessed area where the opening was for the old window A-C unit so it will blend in with the surrounding wall surface.

2014/08/31(N) By Any Other Name

My first task after breakfast was to sand drywall compound and apply the next coat where needed.  I’m down to touch up work in most spots and so I am trying to apply very thin layers with feathered edges that will dry quickly and require minimal sanding.  The old A-C opening in the library, however, is taking many, many overlapping layers.  Fortunately I can finish that at my leisure as Darryll is not working in that location.  Since he just this week installed the two pieces of duct in the lower part of the wall between the garage and the library I am still building up drywall compound to fill the irregular and, in places, large gaps on the garage side.  Unfortunately, the thicker compound takes longer to dry and watching drywall compound dry is worse than watching paint dry as it’s even slower.  The trick is to have something else to do while I wait.  Fortunately, I have lots to do.

I had some e-mail correspondence on Friday with the publisher of Bus Conversion Magazine, Gary Hall, whose name turns out to actually be Gary Hatt.  He had his reasons for not using his real name when he first took over BCM, which he explained and which made good sense.  BCM is running my article on Suncoast Designers in the August 2014 issue and he sent me a Dropbox link to the draft.  It looks like another really good issue, but is again coming out a month late.  Ever since the editor had a minor heart attack in early May they have been a month behind.  It appears that they will be doing an article on spin-on oil filters in the October issue and will also use my article on the Spinner II centrifugal oil cleaner that Joe and I installed a year and half ago.  I only have one other article ready for them to use, so I guess I need to get busy and write some new ones.

When I am not working on the house, the yard, or the bus, there’s always computer work to be done.  I have multiple projects to work on, but I also like to relax on a pleasant day and catch up on reading the blogs and RV magazines that I follow.  It was very pleasant today so we turned off the air-conditioning, opened up the house, and sat on the back deck reading and watching wildlife.  I addition to our resident American Red Squirrel we were treated to a visit by three Sandhill Cranes.  The squirrel has been busy for most of the month harvesting and stockpiling pine cones in what we presume is a midden under a cluster of very large fir trees northwest of the house.  The cranes spent a long time wandering around the back yard foraging.  We sat quietly and watched them and they came closer to the house than usual so we got a very good look at them.  They are large and magnificent.

I finally decided to continue editing the rough drafts of my blog posts for this month and get them ready to upload.  I still need to select photographs to go with some of the posts, or to put in separate gallery posts, but I finally uploaded the tree photos I took on the 21st to our Dropbox and e-mailed the link to Paul at Detroit Tree Recycling.

I spent some time online searching for sources of supply for an ignition coil for our Aqua-Hot diesel-fired hydronic heating system.  I can get one from Darin, but he quoted me MSRP and it is an expensive part.  I wasn’t having much luck so I called Butch mid-evening to discuss the situation.  He suggested that I hold off on getting a new ignition coil until I got the coach to his place and we were able to look at it more carefully.  He said I should have had white smoke and a definite smell from the atomized but unburned diesel fuel.  I didn’t which made him wonder if the problem might be fuel delivery rather than ignition spark.  Good advice, as always.  I don’t know enough about the control circuitry on the Aqua-Hot (it’s actually a Webasto inside) to know how the operation of the spark and fuel solenoid might be intertwined.  I have the manuals, but I have not had time to dig into them.  Besides, I have enough other things to work on right now that I am willing to let this one go for a few more weeks.

 

2014/08/29 (F) Sand Mud Press

Before breakfast this morning I tried to start the Aqua-Hot (hydronic heating system) in our converted coach, but the burner would not ignite.  We had the same problem back on June 9th when Darin Hathaway of Hydronic Heating Specialists serviced the unit while we were at Elkhart Campground waiting to go to the GLAMARAMA rally in Goshen.  Darin suspected a bad coil but managed to jiggle a few wires and got it to work.  It started several times in a row, so we decided not to spend the money for a new coil at that time.  I hoped then the decision wasn’t a mistake, but it looks like perhaps it was.  I will try to find some time over the next few days to jiggle some more wires and see if anything comes of it.  I recall Darin saying the ignition coils were expensive, so I don’t want to replace ours if it is not actually broken.

For breakfast we had some of the vegan muffins that Linda made yesterday.  They were yummy.  We took a little time to revisit our options for a white, free-standing, double oven, 5-burner, gas range with a convection feature in at least one of the ovens but did not come to any decision regarding purchasing a new one.  Linda made a grocery list and then went to the Howell library to see what Consumer’s Reports had to say about gas ranges before stopping at Meijer’s.

While Linda was gone I placed follow-up calls to Heights Tower Systems and Bratcher Electric to check on the status of their pending quotes and then e-mailed Darin about the Aqua-Hot.  I then got to work in the garage and library working on the drywall.  I sanded all the drywall compound (mud) I had applied yesterday and added the next layer to the places that needed it.  Patching the library side of the opening where the window A-C was installed has proven to be particularly challenging, or at least tedious.  The new piece of drywall is recessed slightly compared to the original wall surface surrounding it, so I have been building up layers of drywall compound to “fill the hole.”  It has taken many passes so far and it is going to take quite a few more before it’s done.

I finished up for the day, cleaned up the tools, and changed out of my work clothes.  Rather than spend a lot of time at the library, Linda photographed the relevant pages of recent issues of Consumer’s Reports with her iPad so we could study them at home.  What we got from the reviews was that LG, GE, Electrolux, and Samsung are making good gas ranges while Kitchen Aide, and Jenn-Air are best avoided.  Lowe’s, Home Depot, and Best Buy all carry LG, GE, and Samsung appliances, so we have a choice of local dealers.  While we were pondering all of this over lunch a group of wild turkeys came through the back yard several times foraging for food.  There were three large adults and three much smaller birds, obviously this year’s brood.

I spent most of the rest of the day working at my desk getting the SLAARC WordPress website to the point where I was comfortable creating user accounts.  I had hoped to have user accounts set up by August 13th, but that did not happen.  One reason for the delay was that I was trying to find a way to automatically e-mail each user as I created their account.  It took me a while, but I figured out how to do this with the WP-Members plug-in.  I also found a plug-in that hides the WordPress Toolbar from users based on their WordPress user role.  In this case I was only concerned about users with the Subscriber role but the plug-in allows me to control all defined user roles.  I did a final edit of the User’s Guide, uploaded it to the private Members Only Area of the website, and e-mailed Mike (W8XH) and Larry (K8UT) that the site was ready to go.  Our DSL connection was pretty good most of the day but got flaky for a while during the evening.  The phone continued to be unusable with loud noise masking weak audio.  So far AT&T’s response to our MPSC complaint has been a phone call and e-mail from someone in the “Office of the President.”  Impressed?  I’m not.

 

2014/08/28 (R) This And That

I put in a full day working on our garage project while Linda put in a full day working on this and that.  She baked vegan muffins, made vegan rice pudding, worked at her computer on bills, banking, and RV club financial records, and helped me in the garage with drywall installation.

My first task was sanding down drywall compound from yesterday and then adding more in certain places.  I then measured, marked, and cut the drywall for the inside of the new utility closet.  Linda helped me install it.  We had to cut one piece in half lengthwise in order to get it into position.  I also had to drill a hole for the garage furnace thermostat cable and push it out through the utility closet wall.  Once all of the pieces were secured with drywall screws I applied self-adhesive fiberglass tape to the seams and then applied drywall compound to the seams and screw dimples.

Jasper doing his cat thing.

Jasper doing his cat thing.

Since I could not sand, prime, or paint until the drywall compound was dry I worked on some loose electrical ends.  I installed a saddle connector in the side of the library HVAC for the armored AC power cable and a cable strain relief for the thermostat cable and A-C compressor control wires.  Darryll had already installed these cables through the gas pipe hole, so I made a diagram of how they were connected, uninstalled them, re-routed them through the strain relief, and reconnected them.  I prepped the AC power cable, partially installed the switch in the surface mount electrical box, and connected the armored cable to the saddle connector.  The final AC power connections for the library HVAC unit will have to wait until the drywall is finished and the surface mount junction/switch box is installed.

I mounted the library thermostat on the wall above the air return but did not connect the wires.  The color coding of the wires in the thermostat cable does not exactly match the labeling of the terminals and the instructions were less than clear, so I thought it best to leave this for Darryll.  I removed the side panel from the Reznor garage furnace and made the AC power connections.  I did not, however, connect the thermostat wires and I left the documentation packet inside the unit.

After dinner I checked e-mail and edited a half dozen blog pages before turning in for the night.

 

20140827 (W) HVAC and Dentistry

The only thing these have in common (for me at least) is that they occurred on the same day.  Darryll and Alec were back this morning to continue working on our garage furnace and library HVAC project and I had a 2 PM dentist appointment to have them check if I had lost a piece of one of the abfractions they did back on June 17th.

Our dentist is in Dearborn some 50 miles to our southeast, so I try to leave 90 minutes for travel.  I got there ahead of time and they got me in about 15 minutes early.  It was a quick appointment but I was glad I went.  The hard piece of material I crunched while brushing my teeth a few weeks ago was, indeed, the abfraction material from the upper outside of tooth #11.  They replaced it under warranty and I was back on the road by 2:30 PM, which allowed me to make the trip back towards home somewhat ahead of the afternoon traffic rush.

These mushrooms appeared in the yard a few days ago as round balls and then opened up.

These mushrooms appeared in the yard a few days ago as round balls and then opened up.

I needed a saddle connector and Linda needed some “power greens” for our dinner salad so I exited I-96 at Grand River Avenue and headed towards Brighton.  There is a Home Depot right there, but they only had the 3/8ths saddle connectors in bags of five.  I only needed one, which I knew I could get at Lowe’s in Howell.  Traffic headed back towards Howell on Grand River was badly congested so I used a back route, taking Challis Road to Chilson Road to Latson Road.  The Lowe’s and Meijer’s are on opposite sides of Grand River Avenue at Latson Road.

By the time I got home Darryll and Alec had left.  Darryll had indicated they would knock off early and that he would be back next week to finish up.  While they were here they set the library A-C compressor/condenser in place by the west wall of the garage and got the refrigerant lines run, the power cable routed, and the control cable run.  They also cut the openings for the two lower supply registers in the library, installed the through-wall duct work, and the register grills.  Darryll will be back during the latter half of next week to finish up.  That gives me plenty of time to finish drywall work.

Summer is coming to an end.  The parochial schools are already back in session and the public schools start on Tuesday next week.  Lots of folks are heading north for the upcoming holiday weekend which marks the end of the summer tourist season.  Fall colors have already appeared on a variety of trees in our part of the county and a few seem somewhat advanced.  Except for the last few days, it has been a cool, moist summer.

Early this morning I e-mailed Shelly from the AT&T Office of the President thanking her for calling us on Monday in response to our Michigan Public Service Commission complaint filing that morning, and for following up with her contact information by e-mail.  Our phone line is still noisy to the point of being useless, but we have not seen the dreaded “Check Tell Line” or “Line In Use” messages on our phone and the DSL has stayed connected as near as we can tell.  I am not aware, however, that AT&T has actually done anything yet to fix the problem.  They certainly have not communicated any such information to us  Unfortunately working on the SLAARC WP website and creating user accounts absolutely requires me to be reliably online, as does the Intro to Linux course I am (supposed to be) taking through edX, so these tasks may have to wait until our AT&T DSL connection has been solid for a while.

 

2014/08/26 (T) Dinner With Kate

Darryll planned to be back on Wednesday morning.  He figures two more days to finish everything except the hookups to the gas meter.  I figured I needed to have at least one coat of paint on the east garage wall today to stay ahead of him, so my first task after breakfast was to paint the wall.

Madeline being read to by Aunt Meghan with Grandma Linda.

Madeline being read to by Aunt Meghan with Grandma Linda.

 

Madeline goes for a ride on her new Radio Flyer tricycle.

Madeline goes for a ride on her new Radio Flyer tricycle.

When I was done with the morning painting I did a light sanding of the drywall compound on the outside of the utility closet walls.  After a cursory inspection, I decided it was good enough and went ahead and painted it and then cleaned up the paint tools.  I took care of a couple of minor electrical tasks and then sanded the library side of the former window A-C opening and applied some more drywall compound.  I cleaned up my drywall tools and by 11:30 AM was done with construction projects for the day.

I got cleaned up just in time for lunch.  We had left over Koshary, after which we sat outside and read.  Linda is reading an e-book titled “Consider the Fork: A History of How We Cook and Eat.”  The book is about the intertwined evolution of cooking technique, cookware, and utensils.  I started reading the September-October 2014 issue of The Gypsy Journal, which I had downloaded on Sunday and e-mailed to our iPads yesterday.

 

MEF3 steers the Radio Flyer with a little help from her dad.

MEF3 steers the Radio Flyer with a little help from her dad.

We left around 2 PM for our son’s house in Ann Arbor, making a stop at the Whole Foods Market for some dry ingredients.  The reason for our visit was to deliver Madeline’s new Radio Flyer convertible tricycle and visit until time to meet Kate for dinner.  Madeline started day care yesterday, which is a really big deal.  We were curious how the first two days went, and just wanted to see everyone; I think it’s only been a couple of weeks, but it feels much longer.  Today was my lucky day as Madeline decided I was the designated book reader.  She has let me read to her occasionally in the past, but usually goes to her mom, dad, aunt, or Grandma Linda, all of whom she has spent more time with than she has with me.  It made for a very special afternoon for Grandpa Bruce.

 

 

The Radio Flyer tricycle even has a sunshade!

The Radio Flyer tricycle even has a sunshade!

We left Brenda and Shawna’s house around 5:45 PM and found ourselves in the middle of the evening traffic jam on eastbound Washtenaw Avenue.  We slowly worked our way east towards US-23 and then turned into a strip mall to pick up some disposable paint tray liners at an ACE Hardware store.  We got back into the traffic flow using a street at the end of the strip mall that had a traffic signal.  Once we were back on Washtenaw Avenue we had more reasonable traffic flow the rest of the way in to Ypsilanti.

After weighing several options, Kate chose the Wurst Bar in Ypsilanti for dinner.  Linda had been their once before with Kate but it was my first visit.  It was well rated on Yelp and the menu had several vegan options.  They also had one of my favorite beers, the Lindeman Framboise, a raspberry lambic ale brewed in Vlezenbeek, Belgium.  They were out of the Lindeman but had another lambic from a different producer.  It came in something that looked like a large sparkling wine bottle and cost $15, so Linda and I split it.  Long before hops were used in beers they were seasoned with fruits and vegetables.  I’m not a big fan of hops, but I like fruit.  The substitute was OK, but not what I recalled from the last time I had this at a restaurant in Frankenmuth, Michigan.

 

Grandma Linda's turn to "drive" the Radio Flyer.

Grandma Linda’s turn to “drive” the Radio Flyer.

 

Kate had recently been to Paris, France and to both Venice and Padua in Italy with one of her nieces and nephews.  She had printed about 40 photos (8×10) for us to see.  While these are inherently beautiful places her photography was, as usual, superb.  The Wurst Bar serves “tots” instead of French fries.  Linda and I had some as an appetizer with vegan sausage crumbles, vegan cheese, and sliced jalapeños. Not health food, to be sure, but at least no animal products.  For dinner Linda had the vegan wurst and I had the Asian tofu burger.  Kate had a regular wurst and a dark beer on tap that she had not had before.  She really liked it, but I did not catch the name.

 

 

 

It's finally Grandpa Bruce's turn to drive the tricycle.

It’s finally Grandpa Bruce’s turn to drive the tricycle.

 

 

By the time we were done eating the lights had been turned down and the music volume had been turned up, so we moved to Sweetwater Coffee and Tea a couple doors down the street.  We all had coffee and to our delight they had a piece of vegan apple pie, which Linda took, and a piece of vegan mixed berry pie, which I took.  I really like fruit pies but they have always been a rare treat; all the more so now that we eschew animal products.  So tonight I had fruit beer and fruit pie.

 

 

 

I had planned to put a second coat of paint on the garage walls when we got home but the lateness of the hour disabused me of that idea and I went to bed instead.

Madeline shows her new tricycle to he mommy.  It's not a Subaru, but it's pretty cool.

Madeline shows her new tricycle to he mommy. It’s not a Subaru, but it’s pretty cool.

 

2014/08/25 (M) AT&T and the MPSC

I was scheduled to participate in a meeting of the FMCA Education Committee at 4 PM today but it got rescheduled to Monday, September 8, same time.  That was a welcomed change of plans which allowed me to concentrate on our construction project.

Roese Construction, the contractor for Consumer’s Energy, is still working along our street.  The main gas lines are run.  They are now digging the connection trenches, fusing the sections of pipe together, and filling the trenches back in.  We heard them working at the west end of our property and walked down to see what they were doing and take a few photographs.  A large backhoe was just starting to fill a trench at the northwest corner of our yard where two pieces of main line were joined with a branch line going to the cul-du-sac to the west.  There was a lot of water in that trench and it looked like a (muddy) lap pool.  The surface of the water was only about two feet below the surface of the ground.  I asked the backhoe operator if that was ground water and he said it was.  The northwest corner of our property is a low spot that forms small ponds around many of the trees when it rains, and stays wet for a very long time even after the surface water disappears.

We spent the morning and afternoon sanding drywall compound and touching up a few spots.  While the compound was drying I worked on electrical tasks and Linda worked in the kitchen and did some weeding in the beds around the house.  Somewhere in the middle of all that we put all of the sections of the ham radio tower back on the middle deck, had lunch, and made a trip to Lowe’s for a light switch and various cover plates.  I also picked up an 18″ x 28″ sheet of 1/4″ thick Plexiglas to use as a temporary replacement for the fogged window in the bus when I finally get around to removing it to have it repaired.

Our AT&T phone and DSL service is worse than useless at the moment.  After three un-returned phone calls to both the technician (who gave us his number and said to call him directly if the problem re-occurred within 30 days) and the infrastructure manager for this area (whose name and number we got from the technician) we were fed up, so we filed a complaint with the Michigan Public Service Commission.  About four hours later we got a call from a women who claimed to be from the Office of the President of AT&T letting me know that she was in receipt of our commission filing and that she would be coordinating the “investigation and service repair process.”  The audio level was low and the noise on the line was high, so I could barely hear her and said so.  Apparently she heard the noise too, so at least she knew we were not making this up.  She e-mailed us shortly thereafter with her name and contact information.  That’s a start, but what we really want is the clean, reliable signal that we pay for.

There are things I can do, and need to do, at my computer that do not require me to be online, such as editing the rough drafts of blog posts and selecting/post-processing photographs.  The last post I uploaded to our blog was for August 1st, so I am once again almost four weeks behind.  I needed to finish processing the tree photos from last Thursday, put them in a Dropbox folder, and e-mail the link to Paul at Detroit Tree Recycling, but I did not get that done either.  When I wasn’t eating or driving back and forth to Lowe’s I was working in the garage.

Speaking of food, Linda made stuffed mushrooms for dinner and served them with a side of grilled asparagus.  Both were very tasty.  After dinner I gave the east wall of the garage a final sanding and then worked on the utility closet wall while Linda vacuumed up the dust.  I wiped down the wall with a barely damp sponge and applied a coat of Zinzer primer.  It should be dry enough to paint in the morning.

I drove back to Lowe’s to return a couple of incorrect cover plates I had purchased earlier in the day and get the correct ones.  I picked up another gallon of paint while I was there to make sure I had enough on hand for tomorrow.  On the way home I had a nice QSO (ham radio contact or chat) with Mike (W8XH).  Ham radio is fun and we have yet to get involved in making long distance (DX) contacts with folks all over the world on the HF (high frequency) bands.  Getting our tower up with some HF antennas on it will help a lot.

 

2014/08/24 (N) The Critical Path

The current “critical path” on the garage/HVAC project is the east wall of the garage which has to be finished before Darryll returns.  Although not as pressing as the drywall work, our first task after breakfast was to (finally) connect the separate ground wire from the garage sub-panel to the house main electrical panel and remove the bonding screw that tied the grounds and neutrals together in the sub-panel.  That took about an hour, but that was because it was work that had to be done carefully as the main panel was energized while I was working on it.

With the ground wire taken care of we sanded drywall compound on the east garage wall.  We wiped the dust off with a slightly damp sponge and I applied the next coat of drywall compound.

We then worked on wiring.  I finally decided on the locations for the two furnace switches, each of which had to be within three feet of their respective units.  I decided to locate the switch for the library HVAC unit on the new wall opposite (20″) and above (16″) the cable entry hole in the side of the furnace.  The switch will be in an outdoor rated surface mount junction box with the supply cable entering from the rear.  I had already run the cable into the middle wall cavity and had to drill a hole through one of the studs to get the cable where I needed it to be.

I decided to locate the on/off switch for the ceiling mounted garage furnace on the ceiling about a foot to the right of the right rear corner, again using an outdoor rated surface mount junction box.  The dedicated 15A cable was already routed to that general area so we just had to move it to the new location.

We also had to install the wiring for the thermostats.  Darryll brought a large reel of 4-conductor, 18 AWG thermostat cable, so we had the material we needed.  I was studying the installation instructions for the thermostats and it appeared that they needed 24 VAC to operate.  I called Darryll and left a message regarding this.  He called back fairly quickly and told me we did not need transformers as they were already in each of the furnaces.  He also left me know he would be back on Wednesday morning.

With the transformer question answered we were able to proceed with the cable installation.  The thermostat for the garage furnace will mount on the outside of the west wall of the new utility closet, so we had to run thermostat wire from that location through the attic to the ceiling mounted switch box.  The thermostat for the library HVAC unit will mount on the wall to the right of the door into the garage and above the return air register/duct, so we also had to run thermostat wire from there through the garage attic and over to the location of the on/off switch in the utility closet.  I worked in the attic while Linda worked in the garage.

We took a break for lunch and then started installing insulation in the utility closet walls.  We got one staple installed and discovered that we were out of staples.  That meant a trip to Lowe’s.  Lowes’s is about six miles driving distance and we prefer not to go for just one small thing, so we made a list.  The Arrow staple gun takes T50 staples.  The surface mount junction boxes have several threaded holes into which you can screw different clamps depending on how the cable is connected.  I planned to use flexible armored cable, sometimes referred to as “greenfield”, to bring 120VAC power to the furnaces.  Lowe’s had 6′ lengths of armored cable with an extra foot of wire on each end.  I needed a little more than 36″ for the library furnace and a little less than 36″ for the garage furnace, so that worked out nicely.  The guy in the electrical department got me set up with the right clamps for the ends called saddle connectors.

When I got home, I discovered that I had bought brads rather than staples, so Linda headed back to Lowe’s to return the brads and buy the staples.  While she was gone I pulled the wires out of the armored cable and cut the armor into two pieces.  I fed the wires back through the shorter piece and connected it between the garage furnace and the switch box.  Linda got back before I could complete the cable for the other furnace, so I set it aside to finish later.

With a good supply of staples we insulated the west wall of the utility closet and the space above the door on the south wall.  We then installed drywall over those same areas.  We had to notch around the flue pipe and the black iron gas pipe, but we measured carefully (and twice) and the panel fit just right.  We applied fiberglass tape to the one vertical seam, and prepared a length of corner bead for the outside corner at the junction of the two walls.  Linda prepared dinner while I applied joint compound to the seam and screw dimples.  I mudded the corner, pressed the corner bead in place, and then mudded over it lightly.  I then did some touch up sanding on the east garage wall and applied what I hoped would be a final coat of drywall compound.

I finished just in time to clean up and have dinner; vegan Pad Thai made from scratch.  A small glass of the 2009 Egri Merlot and some lemon melon later for dessert put a nice cap on a very productive day.

 

2014/08/23 (S) Square Waves

We have so much to do at home and on the bus that we might have skipped the SLAARC (ham radio club) breakfast in South Lyon this morning, but I had agreed to meet Chuck at his shop (bus garage) at 10 AM in Novi and to bring Mike (W8XH) along with his oscilloscope to look at the tachometer signal, or lack thereof.  We had a nice chat with our ham radio friends, discussed having dinner in a week or so with Bruce and Linda, and then headed to Chuck’s shop.

We had two different opinions as to what signal we might find, if any, at the end of the wires that connect to Chuck’s tachometer.  Matt, from Bob’s Speedometer, told me that the signal to both the VDO tachometer and speedometer were variable frequency square waves at 3 to 5 volts peak and that the electronics in the gauge moved the needle in proportion to the frequency.  Mike (W8XH) had talked to Jim (N8KUE), who works in the research lab at Ford Motor Company, and Jim was of the opinion that the input to these gauges was a pulse width modulated signal.  With pulse-width modulation the frequency and amplitude of the waveform are constant but the width of the “pulse” (the “on time” of non-zero voltage) varies from zero to some maximum percentage of the half cycle, up to 100%.  If it is on for the entire half cycle it becomes a square wave.  The longer the pulse (on time percentage) the more energy is transmitted.  The gauge electronics can convert that to a needle position or run a motor faster or slower, such as might drive an odometer.

So which was it?  Well…neither.  What we saw was an alternating current signal that appeared to simply be an impulse (sudden spike in the voltage), one positive and one negative per cycle, with the frequency responding in direct proportion to the engine RPM.  The impulse had a rapid but noticeable decay time that appeared to me to exponential, but we did not have the wires connected to a load and that may have affected the signal. The voltage we were seeing appeared to be in 300 mV range, a far cry from the 3 – 5 volts we expected.

We loaded the cardboard in my car before going to breakfast, so when we were done at Chuck’s we headed directly to Recycle Livingston.  From there we went to pet Supplies Plus for some cat litter and then to Lowe’s for four more sheets of drywall (Sheetrock) and a large tub of better drywall compound.  After fighting with the back wall of the garage recently and having trouble with using the patching and repair compound yesterday, I wanted a drywall compound that would go on easier and smoother.  It could just be my technique, of course; I wasn’t that good at dry-walling 32 years ago, and feel like I have lost what little technique I once had.

Back home we unloaded everything, changed into our work clothes, and had lunch; grilled “cheese” sandwiches with tomatoes and dark leafy greens and fresh peaches, ripened to perfection.

While Linda sanded the drywall compound I applied yesterday I removed the panel from the library side of the opening for the old window A-C unit.  I insulated the cavity, cut and installed a new piece of drywall, and re-taped the seams.  I helped Linda finish the sanding, wiped off the dust with a wrung out sponge, and then applied another coat of drywall compound.  I then applied a first cost of “mud,” as drywall compound is commonly called, to the filler panel in the library.

In preparation for dry-walling the new utility closet we had to do some carpentry to box around the flue and gas pipe where they pass through the west wall.  We also had to box around the supply air duct where it passes above the utility closet door.  Finally, we added some backer boards along the edge of the platform by the west wall.  The purpose of all of this carpentry was to provide backing along all drywall edges so it will be supported and can be secured.  Our final task for the day was to trim a piece of 2×4 to block off the top of the wall cavity where the return air duct is connected next to the door between the library and the garage.

For dinner we had leftovers from Thursday:  Koshary and pita bread with vegan garlic “butter.”  Linda read somewhere recently that drier white wines are generally considered (by someone) to go better with Middle Eastern food, but we thought our 2009 Egri Merlot went quite well with dinner.  Of course, Koshary is an Egyptian dish, and so perhaps more Mediterranean than Middle Eastern.  All of that reminded me that there really are no rules about these things; drink what you like and enjoy life.

 

2014/08/22 (F) Radio Flyer

Today was mostly about drywall.  Most of the drywall on the lower half of the east garage wall was removed by the previous owners to access and repair baseboard heating pipes that had frozen (they used water in the system instead of coolant).  We also have a 19″ h by 29″ w opening higher up in that same wall where the window air-conditioner was installed.  (It cooled the breezeway by dumping heat into the garage.)  We needed to replace the lower drywall and patch the A-C opening before Darryll returned next week as he will be running supply air ducts down the wall at two locations to feed through the wall into the library just above the hot water baseboard heat radiator.  Before installing the drywall, however, we had some prep work to do.  When Linda wasn’t helping me she broke down cardboard boxes and got them ready to go to the recycling center tomorrow.

On the lower part of wall I drilled through the corners of the two register locations Darryll had marked on the library side.  We then added horizontal wood 2×4 blocking above and below the locations of the two registers.  We also added blocking around the inside of the old A-C opening to provide backing and attachment surfaces for the drywall.

With the carpentry done we removed some old insulation that was not in good shape and insulated the lower section of the wall.  I marked the locations of all the studs on the floor and on the upper half of the wall.  I also marked the locations of the horizontal blocking, the hot water heating pipes, and the capped off gas pipe that supplied the wall-mounted propane heater in the library.  Finally, we were able to install the drywall.  It took two pieces, 48″ x 87″, to cover the lower half along with lots of screws.  By the time we finished it was time for lunch.

We needed another sheet of drywall to cut the two pieces for the A-C opening, so after lunch we drove to Lowe’s and bought a 4′ x 8′ sheet.  When we got back we cut the two pieces and installed them.  Linda then helped me apply self-adhesive fiberglass tape to all of the seams.

The next step was applying drywall compound.  While I “mudded” the drywall seams and screw head dimples Linda started assembling a Radio Flyer configurable tricycle.  She ordered it for our grand-daughter a couple of days ago (Amazon Prime) and it arrived late yesterday.

I finished the first coat of drywall compound at 6 PM and cleaned up my tools.  While Linda pulled together leftovers for dinner (potato lentil curry, sautéed green beans with garlic, and naan bread) I measured the tow bar on the back of the bus to see how long of a cable we needed for the EZ*Connector system.  24″ + 34″ = 58″, about 5 feet, so their standard 6′ cable should be a good length.  Although it was only 3 PM in California, I decided to wait until Monday to place an order as I still needed to determine some circuit details.

After dinner I tried to check my e-mail and discovered that our DSL connection was not working, again, even though the AT&T gateway said it was.  The phone (POTS) had gone out earlier in the day and was out again.  I called Ken, the AT&T technician, and left a message and then called Steve, the AT&T infrastructure manager for the Howell and Lansing areas, and left a message.  I had called both of them twice this week already without getting a return call from either one.  My message this time indicated that I expected a return call with some information as to what they are doing to try and resolve the problem.

I called Chuck (on my marginal connection Verizon cell phone) to get a status update on his bus tachometer, then called Mike to firm up arrangements for him to bring his oscilloscope to breakfast tomorrow so we can go to Chuck’s shop and investigate the signal feeding his tachometer.  I texted Chuck back to confirm that we would be there by 10 AM.

I helped Linda finish assembling the Radio Flyer tricycle.  It is very spiffy and, of course, very red.  We spent the rest of the evening reading.  As I was typing this post I realized that I forgot to insulate the wall cavity where the window A-C unit was installed.  That meant I would have to remove the piece of drywall on the library side, insulate the cavity, and then cut and install a new piece of drywall.  I had already applied the seam tape and initial coat of drywall compound, so it will be a messy task.  Fortunately, I do not make those kinds of mistakes very often.

 

20140821 (R) Words With Friends

With a dry morning on tap I took care of chores after breakfast while Linda worked on preparations for dinner.  First I photographed trees around our entire property that were dead or obviously distressed and not doing well.  Next I took all of the sections of our Heights aluminum tower off of the back deck, where they have been stored since we bought it in May, and laid them out in the yard in the order in which they go together.  I then photographed all of the pieces, including details of how they interconnect, along with the fold-over assembly, fold-over motor, and bearing plate.

Thrust bearing plate for ham radio tower.

Thrust bearing plate for ham radio tower.

I transferred the photos to my computer and then processed a selection of the tower photos, resizing and sharpening them.  I put them in a folder in my Dropbox and e-mailed the link to Heights Tower Systems along with a description of what we have, what we intend to do, and what we think we need to do it.  I also gave them the name of the amateur radio operator we bought the tower from.  He was the original owner.

20140821-07952

The gear-motor for the fold-over mount. Mast rotor in the plastic bag to the right.

Fold-over mount standing up on hinge end.

Fold-over mount standing up on hinge end.

 

 

One meaning of having “words with friends” suggests that they might not be your friends anymore, but in this case it’s the name of an online game from Hasbro that Linda plays with Karen Limkemann.  Karen and Steve came to visit this today and arrived around 3:30 PM.  We all talked for an hour and then Steve and I went to my office to look at our Linux computer while Linda started pulling dinner together.

 

 

 

Ham radio tower sections laid out in the yard end-to-end.

Ham radio tower sections laid out in the yard end-to-end.

Linda spent much of yesterday and this morning preparing this meal.  She made a salad dressing from scratch, crushed red lentil soup from scratch, pita bread from scratch, mixed up a small batch of garlic butter, and made Koshary from scratch.  We had a semi-dry white wine from Leelanau Cellars with the meal, and red grapes for dessert.  The meal was truly outstanding.

Heights Tower Systems aluminum tower sections laid out in the yard.

Heights Tower Systems aluminum tower sections laid out in the yard.

After dinner we took a stroll around the property and showed them the landscaping work, the (disassembled) ham tower, the proposed location of the barn, and the natural gas and HVAC projects.  Back at the house we discussed past travels and future plans at some length before they needed to head for home.

 

2014/08/20 (W) Like A Well-Oiled Clock

Darryll and Alec (DCM Heating & Cooling) were back today to continue working on the garage and library HVAC project.  I was talking to them as they unloaded tools and materials when I got a call back from Paul Keech.

Paul has changed the name of his company from Paul’s Tree Service to Detroit Tree Recycling and is also running American Mulch.  As I was told yesterday he is trying to focus on tree removal, especially wood lots with multiple trees, rather than tree trimming.  Among other reasons, the trees he removes provides the raw material for his mulch business.  Also, the guy who did most of his climbing the last ten years has moved on to another job and it’s hard for Paul to run a business when he’s up in a tree, even with a cell phone.  I tried to describe the trimming and removal work we need done but in the end we agreed that I would take some photos, put them in a Dropbox folder, and e-mail him the link.  He also encouraged me to get a couple of quotes from some companies more local to our new location.

While I was talking to Paul, Darryll found a small leak in the reducer at the T-fitting behind the garage and tightened it.  The pipe out of this reducer will bring gas into the garage and was the last piece of pipe they worked on the last time they were here.  Alec reset the pressure to 12 PSI and it appears to be holding better than it has up to this point.

In the course of the day, they…

  • …finished setting the Library furnace/air-conditioner and connected the parts together.
  • …cut the hole for the return air register and installed the return air duct.
  • …ran the supply air ducting from the top of the unit along top of the ceiling, over the top of the utility closet door, and then angled it to run along east wall at the ceiling.  All of the duct outside the closet is insulated.  Two flexible ducts will come off the top and run through the attic to supply air through ceiling registers on the east end of the library.
  • …marked the location for the two registers that will be at the bottom of two rigid ducts running down the east garage wall to supply air to the library just above the baseboard heat radiators.
  • …removed the old library window A-C unit and covered the hole with cardboard.  We will have to patch the opening on both sides with drywall and paint it.
  • …shut off the propane to the old library wall-hung space heater, removed the unit, capped the line (iron pipe), turned the gas back on and checked for leaks.
  • …connected the double-walled flue pipe for the library furnace.
  • …connected the double-walled flue pipe for the garage furnace.
  • …ran the 1/2″ iron pipe for the gas supply to the garage furnace.

They will take care of the air-conditioner condenser/compressor installation on a subsequent visit.  In the meantime I need to install electrical junction boxes for the two furnaces, which must have switches located within three feet of each unit.  I also need to run new 12 AWG 2+g NM cable for old A-C condenser/compressor and repurpose the existing A-C condenser/compressor wiring as an outside 120 VAC / 15 Amp outlet.

We still needed to repair drywall in the library and upper east garage wall and install new drywall on the lower east wall of the garage and on the new utility closet walls.  The lower half of the east garage wall is the next thing I have to do as I need to have it done before he comes back to finish the duct work.

I got a call from Chuck Spera just before noon letting me know that he was headed to his shop to pick up his old VDO bus tachometer and take it to Bob’s Speedometer Service on Bergin Road.  Bergin is an east-west road about one mile north of our house.  Bob’s was over at Old US-23, less than five minutes away.  I met Chuck there at 12:30 PM and we met with Matt who handles their VDO instrument repairs.  He tested Chuck’s tach and pronounced it broken but probably repairable, so Chuck decided to leave it there.

Matt did confirm for us that both the tachometer and the speedometer take a square wave input signal in the 3 – 5 volt range with deflection of the needle proportional to the frequency of the waveform.  Presumably this same signal regulates the speed of a motor that drives the gears of the odometer.  I had discussed this very situation with Mike (W8XH) just last night and he is willing to bring his 100MHz 2-channel storage oscilloscope and help us look for and trace these signals if needed.  Once we have known good gauges installed knowing what waveform to look for will help greatly with troubleshooting should they still fail to indicate the appropriate information.

After we were done at Bob’s I headed over to the Meijer’s northeast of M-59 and US-23 to get a few things for Linda.  By the time I got home, Glen Williams of Tenor Clocks LLC had arrived to service our grandfather clock.  I “broke” it about a month ago by trying to wind it at just the wrong time and it has not chimed since then.  It has also never been oiled in the 11 years since we bought it and Glen told us on Saturday that it should be cleaned and oiled every 5 – 7 years.  (We saw Glen at the GLCC/CCO rally in Clio, Michigan this past Saturday when we were there.)  Glen took the mechanism out and examined it and said that nothing was broken.  Apparently it finally bound up the last time I wound it from lack of proper oiling.  He cleaned it, oiled it, and checked it for wear but did not see any.  He reassembled it, checked the operation and timing, and said it was running smoothly and keeping very accurate time “…like a well-oiled clock.”

Although my time on the computer today was limited, I managed to post my blog entry for August 1st and started selecting photos for other posts.  I updated the Technical page on the SLAARC website with a document on low band antennas for Field Day use, and added a link to an online Smith Chart Tutorial.  I then updated the online roster.  I am at the point where I need to generate WordPress user accounts for the club members so I looked more carefully at the WP-Members plug-in documentation to see if there was a way to have the website e-mail each member as I create their account.  It appears that there is, but it will take a little more work on my part to get that set up and working correctly.  As I was working on this our AT&T DSL line started dropping out; again.

Linda spent part of the day preparing food ahead in advance of having company tomorrow.  She held back some of the crushed red lentil soup for our dinner and served it alongside sandwiches.  While we were eating we noticed that the phone said “Line In Use.”  We knew we were not using it, but I picked up one of the handsets, pushed “Talk”, and got a very loud, very noisy busy signal.  We checked all of the phones to make sure there wasn’t a problem with one of them.  There wasn’t.  When I checked again the message said “Check Tel Line.”  That usually means we won’t have a dial tone when we push “Talk” and that was, indeed, the case.

Ken is the service technician that has been out twice to try to resolve the problem and he left his AT&T cell phone number in case we had recurring problems.  He also left his manager’s name and phone number.  I called and left a message for Ken and then called and left a message for his manager, making it very clear that Ken has been working hard to resolve our problem and we are happy with the service he is providing.  I also tried to convey that the service disruptions are interfering with our ability to do things online, like edit websites.  It’s bad enough that the data rate is so slow, but we depend on our “always on” DSL service to always be on.

We went to Lowe’s after dinner to buy a couple sheets of drywall.  We looked for special cover plates with a switch opening in one half and a round hole in the other, but did not find anything like that.  We stopped at Teeko’s on the way back and had Jeff roast two more pounds of half-caff blends for us; one Ethiopian Yirgacheffe and the other Seattle Blend.  He was still out of the Sweet Dreams decaf blend, which we have him mix 50-50 with the regular Seattle Blend to make Sweet Seattle Dreams, but he is supposed to be getting some in his shipment tomorrow.

Back home we unloaded the drywall, had some fresh strawberries for dessert, and read quietly for a while.  I’ve been reading the PDF version of the 2nd edition of The Mobile Internet Handbook and am done except for the glossary and the appendices.  It is over twice as many pages as the 1st edition and is the definitive resource on connectivity for RVers in particular.

 

2014/08/19 (T) Horizontally Boring

Yesterday the crew installing the main natural gas line down our street was at the house just east of ours, so we figured they would be at our house today.  Not long after we finished breakfast we heard the sound of trucks and checked to see where they were.  They were set up by the east end of our pull-through driveway pulling 2″ plastic pipe back through the tube they had just bored.  They then relocated their horizontal boring machine down by our third (west most) culvert that will eventually be the driveway for our bus barn.  From there they bored back towards the east following a track that was parallel to the road and about 30 feet to the north of the centerline.

We bought some marker flags at Lowe’s the other day.  I decided that this morning would be a good time to put them in the ground to mark the locations of the 240VAC/50A power lines, the propane line, the septic tank outlet to the drain field, and the drain pipe for the SE corner of the house.

The horizontal boring technology is fascinating and I got to chat with the crew chief while he worked.  He had what looked to be a fairly sophisticated measuring device that told him the current location and direction of travel of the drill head, which has electronics packaged with it that allow it to be tracked.  He relayed instructions via radio back to the operator of the Vermeer drilling rig who could then “steer” the drill head.  We also got to spend a little time by the horizontal boring machine and I tried to capture the essence of this very specialized piece of equipment.

Mel, who is one of the project supervisors, stopped to check on the crew.  I was able to get a few minutes of his time to explain our concern about how they plan to run the gas line to our house.  The diagram sent by Consumer’s Energy was not accurately drawn.  Mel called Phil, who handles the scheduling of the service drops, and had him make a note on the service card to check with us before finalizing their planned approach.  After inquiring about how many gas appliances we have, Mel said to make sure Phil gives us a 425 gas meter.

I spent the rest of the day and evening working at my computer.  I started by updating the online roster in the SLAARC/WP website.  I then selected and post-processed about 70 photos in two groups; one for the front sidewalk/stairs and one for the retaining walls and drain pipes, and created gallery posts for each project.  I will do similar gallery posts for the garage electrical/HVAC project and the natural gas project once they are completed.

 

2014/08/18 (M) Tasks Menagerie

I woke up early, before 5 AM, so I got up, showered, shaved (not a daily occurrence), got dressed, and sat in the living room to read.  I started making coffee around 7 AM, which provided Linda the clue (incentive?) to get up and get dressed.  Ahhh, breakfast (homemade granola).

No more limbs hanging over the bus.

No more limbs hanging over the bus.

Linda was on tap to babysit in Ann Arbor today and left around 8:15 AM.  I got the Little Giant ladder out of the front bay of the bus and set it up as 14′ extension ladder.  This is the only ladder we own that will get me onto the roof of the bus.  I took a brush to clean off the roof of bus and a pole saw/pruner to trim tree branches encroaching on the bus.  When I was done on the roof I collapsed the ladder and put it back in the front bay as this ladder goes wherever the bus goes.  I trimmed lots of other trees from the ground and then gathered up the limbs into a pile to get them out of Keith’s way so he could cut the grass.  (Monday is grass cutting day this year.)

I wanted to run the Aqua-Hot but discovered we had left the electric heating element on so the coolant was hot enough the diesel burner would not come on.  We have been told by Aqua-Hot service technicians in seminars that the unit should be run at least once a month to keep it in peak operating condition.  I turned the electric heating element off and checked to see what else might be on that wasn’t needed.

I looked at replacing the overflow reservoir with the larger Oasis one I got from Butch, but it would require stand-offs or brackets to clear existing water lines (at least until I rebuild the water bay) and I did not feel like getting involved in that today.  Besides, the overflow reservoir was just below the full/hot mark from having left the electric heating element turned on, so I needed to let the system cool down before I could do anything anyway.

No limbs hanging out into the pull-through driveway.

No limbs hanging out into the pull-through driveway.

I chatted with Keith for a little while after he finished cutting the grass and then had lunch, after which I settled in to work at my desk on the SLAARC WordPress website.  I took a break mid-afternoon and made several phone calls.  My first call was to Heights Tower Systems in Pensacola, Florida to start finding out what I need to get our used Heights tower erected, how to order it, and what it’s going to cost.  My chat with Katie made it sound like they might not be all that helpful.  They need measurements, photos, and the name of the previous (original) owner as a starting point and I said I would send her that information as soon as I could.

I called Paul’s Tree service next to see if Paul Keech might come out and trim our trees.  The gal who answered the phone said Paul was trying to get out of the tree-trimming business but wanted to know if we needed trees trimmed or felled?  We need both, but I was primarily looking for trimming.  I guess that was the wrong answer.  I left my name and phone numbers and asked that he at least give me a call.  I suspect we will have to find someone else to trim several trees in places I cannot reach.

My last call was to EZ-Connector in Tulare, California.  I talked to Joe and was ready to order until he suggested I double check a couple of things first, specifically the number of circuits (wires) I need and the length of connecting cable.  I need to get these parts ordered, but I’m not sure when I will find time to verify these things.

Linda stopped at the Whole Foods Market in Ann Arbor but still got home ahead of the afternoon traffic.  She bought an Amy’s roasted vegetable pizza for dinner which we enjoyed with red grapes and sweet Bing cherries.  I worked some more on the SLAARC website creating pages for business meeting documents and uploading them.  I also uploaded my blog posts for the last five days of July to our personal blog.  I added more projects to my bus project list, got discouraged at its growing length, and went to bed.