Category Archives: Family-Friends-Home

Post related to our family and close friends and projects around the house.

2015/06/18 (R) Chiseled Bikinis

The light rain that started late yesterday afternoon continued off-and-on through the overnight hours.  We awoke to heavily overcast skies but a forecast that called for dry conditions until the early afternoon.  We were up at 7:15 AM and had our usual granola breakfast.  I took some more Ibuprofen in advance of working in the bus.  We were just getting ready to have our morning coffee when I noticed several cars in the driveway.  It was 7:45 AM and the roofers were arriving.  Pat Davidson was among them so I went outside to chat briefly with him.

We had our morning coffee and then got to work, Linda at her desk and me in the bus. I spent another two hours using the Makita 11 pound power chisel.  By 11 AM I had removed as much material from the floor as I felt was worth the effort.  Linda brought the camera out and took a few photographs of me at work after which I packed up the equipment, closed up the bus, and went to Home Depot in Howell to return it to their rental department.

I stopped at Lowe’s on the way home and ordered the new Frigidaire refrigerator for the bus, an FFHT1621QB (16.3 cu. ft., top freezer, black, no ice maker or water).  I scheduled delivery for Friday July 3rd to Chuck’s shop in Novi.  I will arrange with Chuck to take the bus their sometime after that when he is available to operate his fork lift and I can get Brendan or some friends to give us a hand.

Me using the Makita 11 lb power chisel to remove thinset and mastic from the floor of our H3-40.  (Photo by Linda)

Me using the Makita 11 lb power chisel to remove thinset and mastic from the floor of our H3-40. (Photo by Linda)

Work continued on the roof through the morning and then the crew tarped off the roof and left in a few of their vehicles for a long lunch.  As forecast it started to sprinkle around 2 PM as they returned from their lunch break.  It never rained hard and they kept on working but always with the tarps at the ready in case they were suddenly needed.  One of the guys finished installing our two Velux Sun Tunnel skylights which required a tall step ladder in our living room.  They looked very nice when he was done.

I had a chat with Jarel Beatty in Logansport, Indiana about the custom desk he is going to build for the bus.  I sent him a follow-up e-mail describing the pullout pantry we also need him to build.  I then spent an hour working on drawings before I had to quit and change clothes.

Kate had secured tickets through her cousin, Michaela, for this evening’s performance of The Bikinis at the Meadow Brooke Theatre at Oakland University in Rochester Hills.  Kate suggested O’Conner’s Public House (Irish Pub) in Rochester for dinner.  The roofers had been working in the living room installing the Velux Sun Tunnel skylights but were done by 3:45 PM.  That allowed us to get cleaned up, dressed for the theatre, and out the door at 4:30 PM even though the roofers were still working up on the roof.

We got to the pub at 6 PM.  Kate got there shortly before us and had ordered a soft pretzel appetizer before the happy hour prices expired at 6 PM.  Conveniently there were three large sticks so we each got one.  Kate got the cheesy dipping sauce and we split the spicy horseradish mustard, which really had a kick to it.  Linda and Kate each had a Smithwicks ale and I had a pineapple ale.  To paraphrase “the world’s most interesting man”:  I don’t always drink beer, but when I do, I prefer a fruit beer.  Not as mysterious as Dos Equis, or as authentic as Guinness, but it’s what I like.  Kate had a regular (beef) burger and we both had black bean burgers on soft pretzel buns with fresh hand-cut French fries.  The burgers and fries were both really good and the pretzel buns, which had been toasted on a grill, did not get soggy.

The musical was a lot of fun with a wonderful performance by the cast of four women.  All four of them were on stage singing and dancing with a lot of energy for most of the performance.  Their singing was excellent, each voice having its own unique quality but blending well, and they carried 4-part harmonies in tune with one another and the small 4-pieces band.  Two of them, Bambi Jones and Jeanne Tinker, were also in the Meshuggah Nuns musical we saw a month or so ago at the Meadow Brooke Theatre.

The Bikinis is the last production that Kate’s cousin Michaela will work on at the MBT.  The production run ends on Sunday and one week later she leaves for a summer stock gig in New England.  Meadow Brooke Theatre is a wonderful venue but not convenient to where we live, even less convenient to where Kate works, and very inconvenient to where she lives.  All of which is to say, I doubt that the three of us will be going there very often now that Michaela is moving on.  That is too bad in a way as we have all enjoyed the shows we have seen.  The fact that Michaela, as a cast/crew member, was able to get us tickets did not hurt.

Michaela met us in the lobby where Kate gave her a nice assortment of flowers.  She then gave us a behind the scenes tour of the wardrobe area where she has spent the past year working on costuming.  We walked out to our cars and by the time we all drove off it was 11 PM.  Even with light traffic it took us almost an hour to get home but we arrived while it was still Thursday, albeit just barely.

 

2015/06/17 (W) Bakery Scraper

Linda was up at 5:45 AM and out the door by 6:15 AM to beat the morning rush hour traffic headed into the northwest corner of the Detroit metroplex.  I got up about an hour later, tended to my morning cat chores, made coffee, had some granola for breakfast, gathered up the trash, and took the big trash can to the street.

The Apex roofing crew started showing up just before 8 AM.  After everything was squared away with Apex I went to The Home Depot in Howell to rent the small power floor scraper.  The scraper took some of the thinset off but was not as effective as I had hoped it would be.  The tool is designed for stripping linoleum floors, so I had no reason to complain that it did not do what I needed it to do.  I returned it within four hours and paid the 4-hour rental fee rather than the day (24-hour) fee.  The guy in the tool rental department suggested I try a different machine which they had not mentioned to me previously.  It was a Makita 11 pound power chisel.  I rented it with three chisels.

The roofers were at the point where they needed to install the two Velux Sun Tunnel skylights in the roof of the living room.  I showed them where I wanted them installed, if possible, and they tarped off the furniture and floor in the living room.  Apex is very good about protecting the yard from damage and capturing the mess that is associated with a roof project.  That same care and attention carried over to the inside work, which I appreciated.

Our bus looking forward from the the hallway by the refrigerator and pantry.

Our bus looking forward from the the hallway by the refrigerator and pantry.

After a break for lunch I spent most of the afternoon using the power chisel to strip the area of the floor in the bus where the ceramic tile was installed.  I was not able to strip it down to the plywood subfloor, but I was able to knock down most of the ridges of thinset and adhesive that remained after I chiseled out the tiles.

I had a brief chat with Chuck around lunchtime regarding the refrigerator.  Butch called mid-afternoon to fill me in on why he was not able to answer the phone last night.  Linda called around 2:30 PM to let me know she was leaving the bakery.  She pulled in the driveway an hour later and came in the bus to see what I was up to and let me know it was starting to rain.  I had made good progress but was not done and decided I would keep the power chisel until tomorrow and pay the 1-day (24-hour) rate.

The roofers were aware of the rain, which was very light though increasing steadily, but were in the middle of replacing plywood and installing the skylights.  Some of them finished that up as quickly as they could, cleaned up the roof, and spread out the tarps while the others picked up the debris from the yard and got it in the trash trailer.  The trailer was full so they took it with them when the left at 4:40 PM.

We had a snack of pretzels, green grapes and a small glass of Moscato wine.  My thumbs were both bothering me (arthritis) so I took some Ibuprofen and then went back to work in the bus.  I had to close the roof vents because of the rain so it was warmer inside and a bit stuffy as the humidity had come way up.  I worked as long as I could and quit for the day at 6 PM.

For dinner Linda made a simple green salad and then cooked some whole wheat capellini and tossed it with the homemade tomato-based Marinara sauce she made the other day.  After dinner I worked in my office for a while.  I thought I would upload some blog posts but I had an e-mail from Bus Conversion Magazine with the draft of the May 2015 issue.  I proofread part 2 of my 4-part article on the Exterior Makeover of our bus by Phoenix Paint.  I found one thing that needed to be corrected and e-mailed it to the editor.

Linda got a DVD of Wild from the Howell Library the other day but we were too tired to watch it and just went to bed.  I turned my light out at 9:58 PM, the first time since I can’t remember when that I have done that before 10 o’clock in the evening.

 

2015/06/16 (T) More Stupid

Linda was scheduled to go to the bakery this morning but rescheduled to tomorrow due to last night’s weather forecast and the possibility of flooded highways in Detroit.  The morning rush hour traffic is bad under the best of conditions and flooded roadways can make it near impossible.  She also did not sleep well and woke up tired.

The Apex roofing crew started showing up just before 8 AM and the Wimsatt truck showed up with the shingles a little after 8 AM.  They brought a conveyor truck this time and were able to get the shingles off the truck and onto the roof without difficulty.  The Apex crew did not waste any time getting to work.  It turned out to be a great day for roofing; clear skies, no rain, moderate temperatures, lower humidity, and some breeze.  Even so, it is work that is done without the benefit of shade and roofs are hot places to work even on the nicest of days.

Wimsatt unloads shingles onto the garage roof.

Wimsatt unloads shingles onto the garage roof.

Linda continued working on the financials for our amateur radio club while I checked my e-mail.  I had a reply from RV Critter Guard telling me what to order and how much it would cost.  I placed the order through their website and used PayPal to complete the transaction.  I tried calling the concrete contractor that Phil recommended (Bid Rite Concrete LLC in Whitmore Lake) but the phone would disconnect after the first ring and revert to a dial tone.  Perhaps the recent storms caused a problem but I e-mailed Phil to see if he had a different number for them.  I called the Henry Ford Medical Center in West Bloomfield and made dermatology appointments for myself and Linda.

With all of that taken care of I turned my attention to the bus.  The toilet is a Microphor LF-210.  It uses pressurized air to operate the waste valve and the water valve and to help push the waste through the drain pipe and into the black tank.  To remove the toilet I had to undo three connections—air, water, and waste—and take out the four screws securing it to the floor.  If only it was as easy as that makes it sound.

The plumbing at the back of the Microphor toilet in our bus.

The plumbing at the back of the Microphor toilet in our bus.

Undoing the air line was easy and undoing the water connection only a little less so.  The waste connection was another matter.  The 1.5″ black plastic drain pipe was routed from the water bay through the floor and into the HVAC chase that runs along the driver’s side of the coach.  The converter, Royale Coach, brought it out through a hole in the wood that covers the chase, making it impossible to take the wood cover off.  The pipe then made two right angle bends, the first one towards the floor and the second one towards the back of the toilet.  The waste pipe was connected to the toilet discharge pipe with a length of rubber hose and a compression sleeve.

The toilet has a large hole in the back for all of these lines to pass through to the inside where they get hooked up.  It should have been a simple matter to slide the toilet away from the wall/chase but the last bend in the drain line was below the top edge of the bottom of the hole, preventing it from coming out.  After wiggling the toilet enough to get the rubber hose loose from the drain pipe I was able to lift the drain pipe just enough to slide the toilet out.  I took pictures for a possible BCM article on our interior remodeling project and then Linda helped me move the toilet out of the bathroom to the front of the coach.

The more I disassemble this coach the more stupid I think the design and construction of its systems are.  I don’t know that coaches from Marathon, Liberty, Vantare, Featherlight, Parliament, Millennium, Custom Coach, or any of a dozen other companies that have come and gone, is any better as I have never tried to disassemble one of them.  These are one-of-kind vehicles that are custom built specifically for the original purchaser and the over-riding factor in every case is the interior design.  Stuff, like toilets, go where the customer wants it, and systems, which are generally buried and hidden from view, get built wherever and however they can be made to fit.  The converter does not expect to have to repair or replace anything during the very short 12 month, 12,000 miles, warranty period and if stuff breaks after that, or someone wants to do a remodel or upgrade sometime later, it will all be time and material.  How difficult it is to do, and how many hours it takes, is someone else’s problem at that point.

The Apex crew hard at work on the back side of the main roof.

The Apex crew hard at work on the back side of the main roof.

We had a call from Butch updating us on a possible property purchase.  They are waiting for a clear title search before making an offer.  The property includes a house and a sizable barn.  The barn needs a new roof and the house will have to be gutted and the inside rebuilt, but for the right price it will still be a good deal.  They already have a good estimate to replace the barn roof and since they are now retired they have more time to work on the house than they would have a year ago.  They also have family and friends who can help.  Besides, they still have their home/business building in Twelve Mile, Indiana and their bus, which they lived in all this past winter, so they will not be under any pressure to get the inside rebuilt quickly.

Linda started downloading updates from Adobe Creative Cloud, which take a very long time, and then left at 3:30 PM for Ann Arbor.  She agreed to take care of grand-daughter Madeline while Brendan and Shawna attended a reception at the University of Michigan – Ann Arbor for newly tenured and promoted faculty.  I was on my own for dinner and Linda bought an Amy’s pizza so I would have something easy to prepare.

The roofers finished up for the day around 5 PM.  By the time they left most of the trash was in their dumpster trailer and the roof was tarped as a precaution against rain even though the forecast for tonight and tomorrow is for dry weather.  Rain returns to the forecast tomorrow night into Thursday but turns dry again on Friday, so we are optimistic that they will get the job finished this week.  It’s a big job but Apex has a big crew working on it and they got a lot of work done today.  We are very pleased with the look of the Certainteed Landmark Pro Max Def Resawn Shake shingle that we chose.  I took pictures of the work throughout the day as I always try to do with major projects.

After the roofers left I worked for a while in the bus.  I took the mattress into the house along with the electric heating pad controls.  I disconnected the two gas struts that support the plywood bed platform so I could open it far enough to reinstall one of the drawers.  I left them disconnected as I plan to remove the platform to provide better access to the sides of the box and floor.  I also plan to reposition them when I reinstall the platform to provide better access to the storage area underneath.  I then took measurements and made a sketch of the file drawer box for the desk.

Installing soffit baffles and replacing roof decking on the front of the main roof.

Installing soffit baffles and replacing roof decking on the front of the main roof.

I cooked the Amy’s Roasted Vegetable Pizza on the outdoor gas grill, both to avoid heating up the house and to see how it responded to that cooking method.  I used the grilling mat and the result was quite acceptable.  A glass of Franzia Moscato was a nice accompaniment.

After dinner I worked at the drafting board in my office turning my sketch and measurements into a scale drawing.  The two boxes for the desk will be trickier than a standard desk box because of the HVAC chase and because I have to put an Aqua-Hot heat exchanger in the bottom of each one.  I worked until about 9 PM and then came back upstairs.

The air-conditioner worked fine yesterday but was once again unable to bring the temperature in the house below 74 degrees F even though the outside air temperature never rose above 80.  There is clearly something wrong and I am wondering if one of the cold air ducts is open into the attic and/or one of the return air ducts us drawing hot air from the attic.  Either of these conditions would reduce the air flow to the house and overtax the evaporator in the air handling unit.  The more likely cause, however, is lack of refrigerant.  Whatever the case I shut the system off and opened up the house.

I was relaxing in the living room when Linda called at 9:30 PM to let me know she had left her babysitting gig and was stopping at the Whole Foods Market before heading home.  The reception started at 5 PM and lasted until 9 PM.  She was home by 10:15 PM and straight away to bed as she has to go into the bakery tomorrow and wants to leave early enough to be ahead of the morning rush hour traffic.

 

2015/06/15 (M) Cover Up

Linda was originally scheduled to go into the bakery today but it got rescheduled to tomorrow so we did not have to be up by any certain time other than to be ready for the delivery of our new roof shingles.  Apex Roofing is scheduled to put a new roof on our house this week, weather permitting, and assuming they can finish up jobs they had scheduled for last week when it rained so much.

The truck from Wimsatt Materials in Waterford showed up at 8 AM with our shingles but they were unable to deliver them.  They brought them on a boom truck that was too tall to fit under the phone lines across our driveway and there was nowhere else they could position the truck that would allow them to operate the boon.  They were on the phone with their dispatcher and I called Pat Davidson at Apex roofing to let him know what was going on.  The decision was that they would be back this afternoon with a conveyor truck which would fit under the wires and be able to get the bundles up to the roof.  Pat called back to let me know they would be starting in the morning around 7:30 AM.

Later in the day someone showed up in an Apex van with a large enclosed trailer.  We moved our cars and he backed it up in front of our single garage door.  Wimsatt did not return with shingles so they will presumably deliver them first thing tomorrow morning.  They will need to back into the driveway and position the truck in front of our double garage door but that is also where Apex plans to put their debris trailer.  The guy in the van also made it sound like there would be at least six cars/trucks here needing someplace to park.  It should be an interesting morning, especially given the overnight weather forecast which includes drenching rains and possible severe weather and flooding.  The forecast for the daylight hours, however, looks OK.

After the Wimsatt truck left we finished the last batch of granola for breakfast and then got busy with our chores and projects.  Linda spent part of the day at her desk working on the financials for our local ham radio club (SLAARC).  She also tried to contact PayPal to opt out of their upcoming RoboCall campaign but was not able to get through to a real person.

I settled into my office for the morning, dealing with e-mail but focusing on editing blog posts for the last seven days.  Kate got in touch with me to see if we wanted to see The Bikinis musical production at the Meadow Brooke Theatre this week.  Wednesday through Sunday is the final run.  She also forwarded an invitation to a former colleague’s retirement gathering in a couple of weeks.

We have an RV Critter Guard that seals around our 50 A electrical cord and water hose to keep “critters” from entering the coach via that access hole.  We lost our original foam insert when I forgot to remove it from the cable entrance hole in the floor of the bus utility bay and it fell (blew) out while we were driving.  I checked the RV Critter Guard website and my exact products were not listed.  I measured our existing tongue and groove plate and then contacted the company via their contact form and explained what I needed.  I got an e-mail back indicating that my product was custom made and asking me for one additional dimension from the plastic plate.  I got that measurement and e-mailed it to them and indicated that I wanted another plastic plate and two spilt foam inserts.  I expect to receive an e-mail tomorrow with the price.  Once I have that I will call them to place the order.

I have tried several times in the last two years to order products from EZ Connector but they have always had another question for me that required me to go check something and I have never managed to close the loop with them.  I’ve been on a roll the last couple of weeks and decided that today was the day to get this done.  The company is in California, so I called them during the afternoon (my time).  The woman I spoke to on the phone gave me some good information but suggested I e-mail Joe with my requirements.  Joe e-mailed me back and answered several questions but had another one for me.  I responded to that question and went on to something else while I await the prices.  Once I have the pricing I will have to call them and finalize the order.

I exchanged e-mails with Josh from Coach Supply Direct and got a series of revised quotes from him for our new RV furniture and window shades.  What I really need are the drawings that show the exact dimensions of each piece including the size of the base and the location of the pivot (swivel) point.  Apparently he is having difficulty getting these from Flexsteel.  I would also like to have these for the Lambright Comfort Chairs but we took our own measurements at Bradd and Hall.  The whole process of getting furniture is getting very frustrating.  I need to contact Mike at Suburban Seating regarding the ISRI 6860 and pick a day to drive to ISRI USA in Galesburg to look at fabrics.  While I am at it I should probably get a price from Prevost.

I finally got back to work in the bus this afternoon.  I shut off the auxiliary air compressor, closed the valve on the air manifold that supplies air to the toilet and other house accessories, and drained the water separator.  I then investigated what will be required to remove the toilet.

There is a shut off valve on the water line behind the toilet so I closed that.  The water line is attached to the toilet mechanism with a plastic connector with two wings and looked like I could undo it by hand.  The air line looked equally easy to disconnect but the drain looked a bit trickier.  It goes out the back of the toilet rather than through the floor.  There is a metal sleeve with band clamps at each end that connects the discharge pipe to the drain line.  Fortunately the band clamp screws are accessible.

The toilet is screwed to the floor with four Philips head screws.  The centers of the screw heads are threaded and there are plastic caps with posts that screw down into the mounting screws to conceal them.  With the water, air, and waste lines disconnected once I unscrew the base the toilet should slide forward and then we may have to lift it to get clear of the water line.  The trick to getting it back in will be to get the four mounting screws back in the exact same holes.

The humidity outside was near 100% and I did not feel like running the bus air conditioners so I did not remove the toilet today.  I need to get it out, however, to remove the last few pieces of ceramic tile from the bathroom floor.  Once it is out it will have to stay out until the new floor is installed.

I tried pulling on one of the window latch knobs on the fixed window across from the kitchen counter and was surprised by easily it moved the latch.  I did not pull it far enough to unlatch it but it appears that getting the window unlatched will be relatively easy.  Getting the frame open without damaging the frame seal, and getting it closed again so it is weather tight, may be slightly more challenging.

I used a chisel to try removing the thinset and mastic that was adhered to the plywood subfloor.  It came off better than I thought it would but it was a slow process.  In addition to being humid in the coach it was very warm as I have had to leave the roof vents closed with the fans off due to the rainy weather.  I removed enough thinset, however, to convince me that it is worth renting the power floor scraper from the Home Depot in Howell for a day and see how it works.

Late afternoon Linda worked in the kitchen making another batch of her fabulous granola and a black beans and rice dish for dinner.  She soaked two Hatch chilies, two Ancho chilies, and four Pequin chilies and used them in the bean dish.  I had a call from Pat Lintner before dinner to let me know that they took their Prevost to McMillers in Nappanee and were very pleased with work and the price.

I thought about driving to the Lowe’s in Howell after dinner to order the new Frigidaire refrigerator for the bus but it got too late to go.  We have decided to have it delivered to Chuck Spera’s shop in Novi.  We can pull it inside and he has a forklift, so hopefully that works out OK.

We were both tired and headed off to bed at 10 PM.  The weather radar showed a band of more intense rain setting up to our southwest and taking aim at us.  Linda fell asleep quickly but I was still up writing when the rains started around 11:15 PM.  We had the house closed up with the air conditioner running and a small fan for air movement so the sounds of the weather are not as noticeable as when we have the windows and doorwalls open.  I checked the radar again on Wundermap and it looked like we might be in for a long stretch of persistent rain unless the line drifted south just enough to miss us.  The strongest weather in the region stretched from Ft. Wayne, Indiana WSW to just south of Logansport, Indiana but there were lots of pockets of yellow with some orange on the screen over all of the southern half of Michigan’s lower peninsula and the northern half of Indiana.  It looked like it might be another restless night.

 

2015/06/14 (N) WordPressing

We had yet more rain overnight.  I heard the rain around 6 AM and checked the Wundermap app on my iPad but did not get up.  Linda did not need to go to the Howell Farmers Market today as the refrigerator is quite full and the rainy weather made the prospect less appealing.  We finally got up at 9 AM and I made coffee.  Linda checked the weather forecast.  It called for a 100% chance of rain between noon and 3 PM with thunderstorms and up to 2″ of rain.  By 10:15 AM it was raining steadily again.

We deferred by one more day getting back to work on the bus.  The monthly meeting of our South Lyon Area Amateur Radio Club (SLAARC) was this evening and we did not want to get involved in physical work today.  I wanted to do a load of laundry but deferred that as the high humidity makes it harder to get the clothes dry.

I opened the three boxes that made up the OTA TV antenna shipment from AntennasDirect.com and laid all the parts out on the floor.  As I wrote yesterday I need to determine exactly what types/lengths/connectors I need to get everything hooked up and make sure I have it on hand before I climb the 40 foot tower next to the house.  After I laid all of the parts out this morning Linda asked how I was going to get all of that stuff up the tower.

Our new Antennas Direct DB8e Over-The-Air TV antenna.

Our new Antennas Direct DB8e Over-The-Air TV antenna.

My plan is to preassemble as much stuff as possible.  I will then take a 100 foot rope with me when I climb the tower, loop it over one of the crossbars, and drop it back down to the ground where Linda can tie it to a bracket, or directly to some part, and pull it up to me.  As I describe this it occurs to me that I should probably rig up a pulley.  We also figured out that we should run the TV co-ax inside the house before I climb the tower.  That will allow Linda to scan for signals and talk to me on our portable ham radios while I am on the tower if the antennas need to be aimed.  I called Mike (W8XH) to see if he would bring his climbing harness to our ham radio club meeting this evening and he agreed.

For breakfast I had some of the Pepperidge Farm cinnamon chocolate chip bread Linda bought and we both had fresh grapefruit.  After breakfast I got cleaned up and dressed and then partially assembled the OTA TV antenna.  I then went to my office and settled in at my desk to upload blog posts.  I had not been in my e-mail for a few days so there were some things I had to respond to before working on our blog.

I got my blog posts uploaded for May 29 through June 7 and then decided to update the other three WordPress websites I work on.  Much to my dismay I was not able to log in to the FMCA Freethinkers website.  I got an error message instead and the contents looked to me like the site might have been hacked.  I notified the President of the chapter and indicated that I would contact the ISP technical support folks and see what they can tell me.  I have never opened that site up to the members of the chapter because I never quite finished it but I intended to and I have a lot of time and effort invested in its development.  Still, if the site is totally corrupted I may just delete it and abandon the whole project.

I wrapped up my work just in time for dinner.  Linda reheated the two leftover vegan cheeseburgers and served them with the remaining vegan potato salad and fresh nectarines.

Linda spent a little time during the afternoon getting the treasurer’s report ready for our SLAARC meeting.  We left at 6 PM and were at the Witch’s Hat Depot in South Lyon by 6:30 PM.  We have changed the meeting format to have social time from 6:30 to 7:00 PM, followed by a business meeting, and then a program.  I got the climbing harness from Mike (W8XH) as soon as we arrived and put it in the car.  I then had a brief chat with Scotty (AC8IL) regarding Universal Towers in Clinton Township, Michigan and LMR-400 co-ax.  Scotty stocks LMR-400 but also stocks RG-213 which he thinks is better for outdoor use.  His opinion is based on a Motorola white paper that discusses potential problems with the aluminum foil wrapped copper braid outer conductor in LMR-400 in the presence of moisture.

Tonight’s business meeting was a discussion about preparations for the upcoming ARRL Field Day lead by this year’s club field day chair Paul (KD8SNZ).  The program was a presentation by Larry (K8UT) on the N1MM Logger+ contest logging program that we will be using to log contacts on four different networked computers.  Larry is a member of the N1MM development team.  I asked Larry if I could send him the URL for my broken WordPress website and he said he would look at it.  We left at 8:45 PM.

When we got home Juniper was hunched over something in the living room and I could see immediately that she had caught another mouse.  It was very small, like the last one, and for all I know it was the same mouse.  I got her to drop the last one and it escaped into my office.  Linda grabbed one of the antenna boxes and pulled out the shipping paper that was stuffed inside.  I managed to get Juniper to drop the mouse in the box, from which it was not going to be able to escape, and then took the box outside and set it free.  If it has any sense it won’t come back in the house and it will tell all if its little mouse friends to steer clear of this place.  Juniper is a very skilled hunter and will catch anything in that house that moves that is smaller than she is.

Linda prepared some fresh strawberries and served them with some non-dairy ice cream.  She logged in to Amazon.com and ordered six live traps and a new cover for my iPad, both eligible for Amazon Prime.  We then spent a little more time reading and writing and checking the weather.  The 10-day forecast is for continued rain almost every day.  We are still expecting the new roof shingles to be delivered tomorrow but we won’t be surprised if they are not.  We are also expecting that Apex will have to push the start date of our project back due to all of the recent rain delaying other jobs that are ahead of ours.  We turned in for the night at 10:30 PM; late for Linda and early for me.  She was asleep fairly quickly but I stayed up writing and played a few games on my iPad as I do most nights.

 

2015/06/13 (S) On to Illinois

It has turned out to be a wet June so far and we had more heavy rain last night.  In spite of waking up during the night I was up at 7:30 AM and made coffee.  Everyone else got up as suited their level of rest and we sat around chatting for a while.  Ron put a load of laundry in the washing machine and then we sat down to a light breakfast.

Ron and Mary spent most of the rest of the morning repacking all of their stuff for the drive to northwest Illinois and their week-long bicycle ride.  FedEx Home Delivery delivered the Cyclo 5-Pro Mark II Dual Head Orbital Polisher I ordered along with all of the foam pads and detailing chemicals.

Ron retrieved their laundry from the dryer and after they finished packing we had a light lunch.  By 1 PM they were ready to load up the car so we helped get their bags out.  After a brief “farewell and safe travels” they were on their way.  They had a five hour drive but would gain an hour as they entered the Central Time Zone so they would be at their motel by 5 PM local time with plenty of daylight and time to eat dinner.

Linda took a short nap and then went for a walk.  I read through the manual for our SureCall Fusion5s cell phone booster and was part way through the manual for the Cyclo 5 when I decided to take a nap.  Linda returned from her walk and a little while later a USPS mail carrier delivered the OTA TV antenna I ordered from Antennas Direct.  All I am waiting for now is the cable entrance box I ordered from KF7P Metalwerks.

Once the cable entrance box arrives I will have a bit of a project.  First I will need to drill two 2″ holes through the east wall of the house and into the sump pump closet in the northeast corner of the basement, mount the box to the wall, and ground it to the outside ground rod by the tower.  I may also need to install additional ground rods.  I will then need to climb the tower by the house and do the following:

  1. take down the old OTA TV antenna and rotator;
  2. mount the new OTA TV antenna and aim it;
  3. mount the amplifier for the OTA TV antenna;
  4. attach a short piece of 75 Ohm co-ax from the antenna output to the amplifier input and weatherproof the connections;
  5. attach a longer piece of 75 Ohm co-ax to the output of the amplifier and weatherproof the connection;
  6. mount the outside antenna for the cell phone booster system;
  7. attach one end of a 50′ piece of LMR-400 or RG-213 co-ax to the cell phone antenna and weatherproof it;
  8. unmount our Diamond SG7900 2m/70cm ham radio base station antenna and remount it at the top of the tower;
  9. attach a 50-to-60 foot length of LMR-400 or RG-213 co-ax to the ham radio antenna;
  10. dress and secure all of the coaxial cables with plastic cable ties (zip ties).

Once I am done with tower work I will need to do the following to complete the installation:

  1. install the lightning arrestors in the cable entrance box for the cell phone booster and OTA TV (?) co-ax cables;
  2. route each of the co-ax cables into the bottom of the cable entrance box and attach them to appropriate lighting arrestors;
  3. attach additional co-ax cables to the lightning arrestors and feed them through the 2″ holes into the basement;
  4. mount the Surecall Fusion5s in the sump pump room and connect the co-ax for the outside antenna and the power supply;
  5. run a 50′ length of LMR-400 from the sump pump room across the basement ceiling and up through an old vertical furnace exhaust chase to the attic;
  6. drill a hole in the ceiling of the main floor hallway near the chase;
  7. mount the inside done antenna for the cell phone booster system to the ceiling with the co-ax dongle in the attic;
  8. connect the antenna dongle to the co-ax coming up from the basement;
  9. run additional co-ax from the sump pump room to the ham shack;
  10. run additional co-ax from the sump pump room to the video distribution point in the laundry room (or directly to the locations of the two TV sets);
  11. turn on the Fusion5s booster (transceiver), adjust the gain (if needed) and test it with our phones and Mi-Fi;
  12. test the TV sets (and hopefully not have to go back up the tower to reposition the antenna);
  13. connect our Icom IC-7000 amateur radio and test the antenna connection.

As I wrote out this list it occurred to me that I need to make a list of all of the co-ax types/lengths/connectors I need and that, at a minimum, I probably need to order a length of LMR-400 orRG-213 co-ax cable and the proper N-connectors to complete the ham radio antenna connections.  It also occurred to me that I might be able to do some of the inside wiring while I am waiting for the cable entrance box to arrive.  Also, once the TVs are connected Linda can scan for channels and communicate with me with our HT ham radios if I need to change the aim of the antennas on the tower.

All of this reminded me that I need to follow-up with a Bratcher Electric on running a new 100 Amp main feed from the transfer switch to the panel in the furnace room in the garage.  I also need to order some new split foam fillers from Critter-Guard and new electrical hardware for connecting the bus to the toad from EZ-Connector in California.

I must have been sleeping lightly and dreamed all of these details because I got up from my nap around 5:30 PM, finished reading the manual for the Cyclo 5, and then took a shower and got dressed for dinner.  Barb Spera had called Linda yesterday to see if we were available for dinner this evening.  They had really enjoyed our meal at La Marsa in Brighton a couple of weeks ago and wanted to go again so we agreed to meet them there at 7 PM.  We did not have to wait for a table and our waiter, Najheem (Naa-gheem), was delightful.  Barbara had the Koshary again, and Chuck had the Chicken Shwarma with tabbouleh salad, while we split an order of spicy vegetarian ghallabah with rice and a salad.  I had a mango smoothie and we all enjoyed the swarm pocket bread and garlic spread.

It was after 9 PM when we got home and we headed off to bed at 10.  We knew Ron and Mary had arrived at their destination because Ron played a Scrabble word.  Linda had also checked that our daughter and son-in-law were on their way back from Las Vegas.

 

2015/06/12 (F) Forms and Family

I was awake at 6 AM but not fully rested so I stayed in bed.  I got up at 7:30 AM, fed the cats, cleaned their litter tray, and then settled in at my desk to continue editing blog posts.  I had edited four more posts by 9 AM when I heard footsteps and running water, signaling that people were up and about.  I wrapped up my work and went upstairs to make coffee.

We sat around drinking coffee and tea and visiting.  Both cats have gotten more comfortable with Ron and Mary being here, but especially Juniper, who is seeking their attention and sleeping on the living room sofas while we sit and talk.

Ron and Mary were expecting a package today but found out late yesterday that it had not been sent.  As a result they needed to have documents e-mailed to us so they could deal with them and return them before they leave tomorrow for a week-long bicycle ride in northwest Illinois.  The e-mails came through and all of the documents were PDFs so they were easy to save and print.  I restarted my old Dell Precision Workstation in Windows 2000 Pro mode as that is where the scanner is installed and we would need it later to scan the signature pages, save them as PDFs and e-mail them back to the sender.  (I normally use this computer to run Linux.)

I left at noon for a 12:15 PM appointment at the Honda dealer to have the oil changed in my Element.  My car has just under 99,000 miles and really needed its 100,000 mile service, but I did not have time for that today so I had them change the oil and scheduled a return visit for Wednesday June 24 at 10 AM.  It has a torn driveshaft boot on the driver side front and the mechanic thinks the drive shaft should be replaced as water and dirt have certainly gotten in there and there is probably rust.  Ron tended to concur with that opinion.

Linda gave me a short grocery list before I left and I went to the Brighton Meijer’s after my car appointment.  By the time I got back Ron and Mary had finished reviewing documents.  I was going to scan the signature pages but it turned out that one of the signatures had to be notarized and the documents had to be faxed back in their entirety.  Linda researched places to get all of that done and they were headed out to take care of that as I returned home.  While I was out UPS dropped off a package from Prevost Parts with the window panel seal I ordered earlier in the week.  That’s two UPS deliveries to this week so my confidence is restored.

While Ron and Mary were out Linda made potato salad and I worked in my office.  I restarted my Dell Workstation in Linux mode (Ubuntu 14 point something) and installed about 45 updates.  While that was happening I edited a few more blog posts and got caught up.  Now all I have to do is post them.

Brendan, Shawna, and Madeline drove up after Madeline got up from her afternoon nap.  They arrived around 4 PM.  I quit working at my desk just before that and came upstairs.  Madeline is always excited to visit Grandma Linda and Grandpa Bruce but having Ron and Mary here was a bonus for everyone.

For dinner Linda served the potato salad, baked beans, and vegan cheese burgers with all the fixin’s.  We had a break in the rain and she cooked the burgers outside on the grill.  We had fresh strawberries and non-dairy “ice cream” for dessert.  Ron and Mary picked up an apple pie from the Grand Traverse Pie Company store in Brighton so everyone else tried some of that as well.  Conversation was about family, work, and travel.

By 7 PM Madeline was showing signs of being tired so Brendan and Shawna gathered up their things and headed back to Ann Arbor.  We stayed up until 10 PM talking, but did not play Mexican Train, and then turned in for the night.

 

2015/06/11 (R) Absent 34

Ron and Mary had a long drive yesterday, and an exhausting 10 days prior to that, so they went to bed tired.  Consequently they did not get up early and I did not make coffee right away.  I was up at 7:30 AM and went to my office instead.  Chris at KF7P Metalwerks accepted my change to the cable entrance box late last night and sent me a PayPal invoice.  I paid that this morning and e-mailed him back to clarify and confirm a couple points about the box.  Once everyone was up we had coffee (us) and tea (them) on the back deck and enjoyed a beautiful early summer morning.  We eventually went back inside and had the granola for breakfast that Linda made yesterday.  So good.

After breakfast we gave them a tour of our partially disassembled motorcoach and explained what we are trying to do.  I mentioned that the motorized windshield roller shades were not winding up straight and that the driver side was binding part way up.  One of the MCD vendors at the rally last week told me to put a piece of tape on one end (lengthwise) to force the shade to not run (in that direction).  Ron, who is a retired mechanical engineer, suggested that I create a tapered roller by putting tape around the roller tube at 5 to 7 places.  The tape cannot go all the way around the roller tube because of the shade but it can go most of the way around.  Ron’s suggestion was one layer towards the outside, two layers next, then three layers and finally four layers in the center.  These tapered rollers are commonly used in industry to keep conveyor belts centered.

We had just exited the bus when a minivan that I did not recognize pulled in our driveway.  It was the electric power company meter reader.  We chatted briefly, and she was very nice but was obviously on a tight schedule.

Ron and Mary needed a duffle bag and some batteries so we drove to the Dick’s sporting goods store at US-23 and Lee Road.  They found a nice duffle bag but not the batteries so we stopped at Meijer’s on the way back to the house and they found what the needed there.  We also picked up a card for our daughter, Meghan, whose 34th birthday was today.

Back at the house we called Meghan and wished her a happy birthday via voice message.  We got a text message later saying thank you.  We also had a voice message on our home phone from Pat Davidson at Apex Roofing indicating that the shingles for our new roof would be delivered on Monday.  For lunch we had pretzels and pita chips with hummus and some grapes.  I slipped off into the small bedroom and opened the box from Cellular Solutions to make sure everything was there.  It was.

Although Ron and Mary slept well last night they were still tired and decided to take naps.  That left Linda free to go for a walk and me to work in my office.  I transferred rough drafts of blog posts from my e-mail to MS Word and then started editing them but did not have time to upload them to WordPress before we had to leave to go to dinner.

We left around 5:15 PM for La Marsa.  They were in the second of two days of their 4th year celebration for the Brighton location and everything was 34% off.  They were backed up 90 minutes for carry out orders but we got a table after only a short wait.  We had Koshary and they had kabobs.  After dinner we went for a walk around the Brighton Mill Pond where we saw two gigantic snapping turtles in the pond.  One of them almost caught a muskrat and they eventually bumped into one another and seemed to be fighting.  It was quite the show.  Snapping turtles are nothing to mess around with and the shells on these two were about 2 feet long, front to back.  Gigantic.

When we got back to the house we played 13 rounds of Mexican Train.  By the time we finished it was midnight and we all got to bed around 12:15 AM.

 

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.

 

2015/06/09 (T) Cyclo 5

I was up at 7 AM, fed the cats, and made coffee, which has become Linda’s wake up alarm.  Phil Jarrell showed up at 8 AM.  He set up his laser level and checked elevations for a gravel driveway that would connect our concrete driveway around to our third culvert.  Some of this driveway may eventually provide access to a barn, but it will also provide a second pad that is level and big enough to support a 45 foot bus conversion.

Phil moved the laser level to a different spot and checked the elevations of various points at the west end of the property relative to the culvert that runs under the road to the little triangle of our yard in the southwest corner.  Although it did not appear so to me, all of the property to the west and north is higher than the bottom of the culvert.  That means Phil should be able to construct a French drain that will help dry this area out and hopefully save the trees that are there.  He will also use the top soil he pulls out of the driveway to fill in the various low spots.

Phil was done and on his way by 9:30 AM.  I forgot to mention the hole for the ham radio tower base so I e-mailed him about that additional work.  While it will almost certainly be less expensive to have him dig the hole while he is already here working on other things it is a project that requires my involvement, parts that I do not yet have, and coordination with a concrete company who can pump or cart the concrete from the truck to the hole.

The old driver's chair in our bus is a Villa captain's chair.

The old driver’s chair in our bus is a Villa captain’s chair.

We had breakfast after which I sorted the laundry.  The warm white load was small so I stripped the bed in the bus and added those sheets to the load.  We cleaned off the twin mattress in the small bedroom with most of the stuff going down to my office.  The stuff on the double bed in the middle bedroom then went to the small bedroom, allowing us to strip the double bed so I could launder the sheets and pillow cases.

Based on the e-mail I got yesterday from Cory at Rupes/Cyclo I figured out that I wanted the Cyclo 5-Pro Mark II Dual Head Orbital Polisher with the ProGuard backing plates.  I also determined which foam pads and chemicals I wanted and placed the order directly with Rupes/Cyclo online.  I also updated our PayPal account and used it for this transaction.

 

I went to my office and spent several hours doing a second floor plan drawing for the bus, this one showing the tiles installed as diamonds rather than squares.  Over the course of the afternoon Linda heated up some Amy’s chili for lunch and I got two more loads of laundry done.

Late afternoon brought a call on our landline that turned out to be a recorded message claiming to be from the IRS and stating that this was their final attempt to reach us before filing a lawsuit.  Yeah, right.  The IRS does not make such calls, of course, nor do they send such e-mails.  They like paper trails and contact people by registered mail or show up unannounced at the door.  And they don’t sue people, they just seize assets.  A Google search quickly revealed that this was an IRS Impersonation Scam that has been around for a while but gets resurrected from time to time.

The swivel/slide 6-way power base under the driver's chair in our bus.  We will reuse this if we get a Flexsteel replacement chair but not if we get an ISRI.

The swivel/slide 6-way power base under the driver’s chair in our bus. We will reuse this if we get a Flexsteel replacement chair but not if we get an ISRI.

We were annoyed enough by this particular scam that I filed a complaint with the U. S. Treasury Department and the Federal Trade Commission.  While I was on the FTC website I opted us out of receiving “Firm Offers” for insurance and pre-approved credit cards.  I also verified that our landline and cell phones (2) are on the Federal Do Not Call list, although it has not eliminated telemarketing calls. The fact that we are on the DNC list, however, allows us to file complaints with the FTC when we get such calls.

For dinner Linda made a nice salad with poppy seed dressing and heated up a couple of teriyaki noodle bowls.  It was yummy and a small glass of Moscato was very agreeable as well.  After dinner I was revisiting the EZ Connector website when a TXT message came through with a picture of his Chuck’s new VDO 0–15 PSI turbo boost gauge.  I was thinking about calling Chuck anyway so I rang him up and we had a long chat.

 

2015/06/08 (M) Home for a While

It rained until well after midnight last night.  The rain was not steady but more in the form of heavy downpours associated with thunderstorms.  The gutter along the rear of our house was not able to handle the volume of water and it was spilling over onto our deck making a sound that we are not used to.  I noted that I should check the gutters for clogs at the downspouts today.  My phone chirped, which meant I had an e-mail, and I presumed it was from our whole house generator.  When I got up this morning the clocks on the microwave and range were flashing “2:06”, so my first thought was that we must have taken a power hit then, but the messages on my phone indicated that utility power had been lost and restored around 3:45 AM; at least that was the date/time stamp on the e-mails.  I got up just before 6 AM and finally figured out that the clocks probably reset to 00:00 when the power blipped (3:45 AM + 2:06 elapsed time = 5:51 AM).

I sat in the living room writing with my iPad and playing games until a little after 7 AM and then made coffee, which got Linda out of bed.  We had planned to empty out more of the bus today but the weather was gloomy and we were tired from the rally so we had a long, leisurely morning before busying ourselves with inside chores.  Linda worked at her desk and I wasn’t in the humor to work downstairs in my office so I set my computer up on the dining room table.  Other than an occasional trip to the bus or the garage I mostly sat in front of my computer and talked on the phone all day.

Linda called Alchin’s, our regular trash collection company, to see if they would pick up the old RV furniture.  They do not have a special truck they can send and could not take the steel furniture even if they could get it into their garbage truck.  Linda suggested we find a company like “Got Junk” and searched online for one in the area.  We decided to call “Chuck It Junk Removal” as they are located relatively close to our house.  Keith, from Kish Lawn Care, showed up around 11 AM to cut the grass and Brad, from Chuck It Junk Removal, showed up around 12:45 PM to look at the furniture and flooring we pulled out of the bus and give us a quote on the cost to haul it away.  As Keith was finishing mowing the grass dark clouds were rolling in from the west and not long after he left we had more rain, although nothing like last night.

My dentist thinks my current intermittent teeth issues are the result of clenching my teeth at night so I made an appointment to get fitted for a mouth guard to wear while sleeping.  I also got hold of Phil Jarrell and he decided that tomorrow morning at 8 AM would be a good time for him to stop by and take some elevation readings for the driveway extension and a French drain for the far west end of the property.  Besides the obvious economy of having him do both jobs while he is on site, we need a place to put the topsoil he will dig out for the driveway and we need topsoil to fill in low spots on the west end of the yard.

I managed to finally get some orders placed today.  The big one was for a SureCall Fusion5s multi-band cell phone booster (transceiver) system from Cellular Solutions in Mt. Pleasant, Michigan.  The other was for a window seal from Prevost.  This is not the seal that holds the glass in the frame but rather a large rubber part that seals the space between the window frame and the structure of the coach.  We may need to unlatch the large fixed window on the passenger side and use it to get the old refrigerator out and the new one in.  This window frame has not been opened since we bought the bus and may not have been opened for many years before that, possibly not ever since the bus was built.  I want the new seal on hand in case the current one gets damaged trying to open the window frame.

Besides these two purchases I talked to someone at A-1 Upholstery and described our home made sofa plans.  She suggested that we would need ~9 yards of 54″ wide material for the sofa seats and back cushions.  I sent an e-mail to Josh at Coach Supply Direct reminding him of some things we had discussed at the rally last week and Rick Short at Isringhausen with questions about their 6800 series bus driver seats.  I also finally got to talk to Mike at Suburban Seating in New Jersey.  As I suspected we cannot buy the seat directly from ISRI, but I may be able to order it through Suburban Seating and pick it up from ISRI USA in Galesburg, Michigan.  That would be much nicer than having it shipped to our house on a truck from New Jersey.

I called Rupes/Cyclo to try to get answers to a few questions about the Cyclo 5-Pro Mark II Dual Head Orbital Polisher and its various pads but could not figure out how to talk to a real person.  I submitted the online Contact Form with my questions and got a speedy reply from Cory as a result of which I now know what to order.  All I have to do is figure out how many of each thing I need.  The Cyclo 5 is available on Amazon Prime, by itself, but it did not appear to be the Mark II model.  Some of the major distributors claim to give you a set of “free” ProGuard Orbital Backing Plates, but the Rupes/Cyclo website clearly states that the polisher is not sold without one of the three head options.  I prefer not to patronize businesses that misrepresent their offerings and will probably order the polisher, pads, and chemicals directly from Cyclo even if I am paying MSRP.

I got a call from Gary Hatt at Bus Conversion Magazine.  I had not looked at or replied to e-mails in over a week and he wanted to make sure everything was OK.  While we were talking we got a call from Curtis Coleman of RVillage so Linda took that initially until my other call was concluded.  I had e-mailed Curtis earlier in the day and he was responding to that communique.

Somewhere in the middle of all that we had chickpea salad on a bed of greens for lunch.  Linda then went for a walk, met Chris (K8VJ) at Lowe’s to pick up some SLAARC mail, and roasted vegetables for our dinner when she got home.  I sent Chuck Spera a short e-mail inquiring about how to open the latches on our emergency escape window and then called it a night.

 

2015/06/01 (M) Bradd and Hall et al

The temperature dropped into the upper 40’s last night.  Although the temperature in the bus only dropped to about 64 degrees F I was cold and did not sleep soundly.  The electric heater pad is still on the mattress but was not plugged in so I could not use it.  Linda developed a bad sore throat during the night (there are no good ones) and also did not sleep well.  We got up around 7 AM and I made coffee while she got dressed and drove to the nearby Martin’s supermarket for Ibuprofen and Chloraseptic throat lozenges.  Sore throats are no fun.  We both hope this passes without requiring medical intervention.

We are in the newest section of Elkhart Campground which consists of narrow pull-through 50 Amp full hookup sites that are long enough to leave a towed car connected to a 45 foot motorhome.  The section is not full but the motorhome on our passenger side had their GLAMARAMA 2015 parking and volunteer placards in the window this morning.  We finally opened our registration packet and found that we also have a volunteer placard since Linda is volunteering at the registration table.  We also discovered that we could have arrived at the Fairgrounds this morning and stayed for no charge.  Oh well, Elkhart Campground is more convenient to Bradd and Hall and other Elkhart area vendors and if we checked into the rally we would immediately be working and socializing instead of shopping.  One must be clear about their priorities.

Bradd and Hall is open from 9 AM to 5 PM Monday through Friday.  We got there around 9:45 AM and had just gone inside when I got a call from Curtis Coleman.  We was headed east on I-80 from Iowa with his sights set on Cleveland and Columbus Ohio and did not realize we were in Elkhart.  He brought me up-to-date on some things having to do with RVillage and we discussed him coming to our house to hang out once he had taken care of some business later this week and we got back home from the rally.

At Bradd and Hall we were assisted by Stephanie.  Bradd and Hall had a good selection of Flexsteel Captain’s chairs and Lambright Comfort Chairs but did not have any Flexsteel barrel chairs.  That was more than disappointing as we thought the Flexsteel bolt down barrel chair might be just what we need to provide seating, with seat belts, on the passenger side of the coach that can swivel to face anywhere from forward to aft.  They had two Flexsteel Captain’s chairs that we found comfortable enough and were not too large.  Either one might do nicely to replace the front passenger seat, and possibly to replace the driver’s seat, although I am holding out for an ISRI air-suspension driver’s seat.  We took cell phone photos of each of us sitting in various seats, photographed product tags, and got several fabric samples but were no closer to a decision about seating when we left than we were when we arrived.

On the drive back to the campground we stopped at Factory RV Surplus to look for some electrical components but ended up looking at furniture.  They had a barrel chair that we liked but no identifying information on it.  We did, however, get some free popcorn.  We were headed up SR-19 and decided to go on up into Michigan and pay Michelle Henry a visit at Phoenix Paint.  There did not appear to be anyone around so we left and went back to our coach and had a bite of lunch.  We had planned to also visit Lambright Comfort Chairs in Shipshewana, but we had been there before and figured they would not have anything different from what Bradd and Hall had on display.  With both of us being tired and Linda still not feeling well we decided to stick around the bus and continue to do online research.

Sometime during the afternoon I got a call from Jim Marin wanting to know where we were parked.  From our windshield I could see their motorcoach parked up by the office waiting to come into the campground.  The space to our passenger side was vacant so they registered for that one and pulled on around and in.  Jim and Lydia have a 1997 MCI 102DLS-3 Vantare conversion that they bought last September.  It’s a nice coach and they got a good deal on the purchase.  They got plugged in and set up while we connected our car for towing and then we stood around visiting in the cool temperatures and warm sun.

We were showing them what we have done to the inside of our coach and explaining what we plan to do when there was a knock on the door.  It was Curtis Coleman.  He had decided that Elkhart was far enough for one day and knew we were here as a result of our conversation this morning so he pulled in for the night and was parked one spot up from Jim and Lydia.  We made introductions, finished looking at our coach and then toured Jim and Lydia’s bus.  I brought my tape measure and tried to quantify the size of their furniture which appeared to fit very nicely in the available space.  All of us then went to Curtis’s coach, which is also a 1997 Vantare conversion of a Prevost XL, and got a sense for his seating.  Both coaches have ISRI driver’s seats and both Jim and Curtis really like them.

We had eaten dinner earlier so Marin’s returned to their coach for their evening meal and we left Curtis to tend to Augie Doggie and take care of RVillage business.  Curtis came over later to visit and we sat in our coach in three lawn chairs and had a great chat.  He returned to his coach at 10:45 PM and we went to bed a short time later.  It was forecast to drop into the mid 40’s overnight so I closed the roof vents and turned on the electric heater pad on my side of the bed.

 

2015/05/30 (S) Chuck and Barbara

There were thunderstorms west of Lansing just before midnight last night but they did not reach our house during the overnight hours and we slept OK.  We were up at 7 AM and off to our weekly SLAARC breakfast.  Linda had a phone message yesterday from Nancy at FirstMerit Bank indicating that there was still a problem with the SLAARC bank account so we stopped there after breakfast but Nancy wasn’t in.  They have frozen the account while we sort out the paperwork, causing our annual insurance check to not clear.  Linda has been in touch with the insurance company, so they are aware of what is going on.  When we got back to the house she wrote a personal check for the insurance premium and put it in the mail.

I gathered up the laundry, sorted it according to color (light/dark) and temperature (cold/warm), and started the first load.  I downloaded and installed updates last night for my ASUS laptop computer so they finished installing when I started it this morning.  I developed the habit a long time ago of checking for additional updates any time I install some and sure enough there were 11 more optional ones available.  I did not install Skype for Windows Desktop 7.3 since I have Windows 8.1 and I did not install the update for a Ricoh printer as we do not have one.

There was an 80% chance of rain starting at 11 AM but the rain did not wait until then to start.  Around 10:45 AM the skies opened up and the rain came down as if poured from buckets.  By noon it was partly sunny, but steamy.  I checked the national radar on my Wundermap iPad app and it looked like we would have more rain as the day went along.

Linda loaded a few things on the bus before the rain started and then busied herself with food preparation.  Larger RV rallies have multiple activities going on every day and evening and Linda does not have the time to prepare meals from scratch.  Being as we will only be gone for a week she prepared enough food to see us through and will only require reheating in the microwave.  It’s a good approach; we still eat well and she has the time to fully participate in the rally.

In spite of the threat of rain I decided to wash the exterior of the bus.  It was already wet anyway and the conditions were otherwise good with a heavy overcast, no direct sun, and moderate temperatures.  I got the outside water turned on, got out some hoses, and connected the pressure washer.  A bucket of McGuire’s Deep Crystal automotive soap (purple bottle) and the long, adjustable handle brush completed my bus cleaning arsenal.  The water softener only had 137 gallons remaining when I started and I ran it down to zero by the time I had cleaned the bus and the Honda Element, so I do not know exactly how much water I used cleaning the vehicles but I’m guessing it was 150 gallons.  That sounds like a lot of water but it is surprising how much water we go through in a typical day, especially if we are doing laundry or running the dishwasher.

I was finishing up washing the bus around 3:30 PM when Linda let me know that around 3:20 PM Chuck Spera had texted me and left a voice message letting us know that he and Barbara were in our general part of town and asking if they could stop by.  Linda replied to the text message and said “sure” and Chuck replied that they would be here around 4:30 PM.  I started the regeneration cycle on the water softener, got all of my equipment put away, and changed clothes.  I uploaded my blog post for May 28th and was sitting in the living room using my iPad when they arrived.

The reason for their visit was to see what we were up to with the remodeling of the interior of our bus.  I had extended an open invitation to Chuck a week ago and today worked for them.  We showed them the bus and explained what we planned to do.  Linda and Barbara went inside to sit and chat while Chuck and I continued the bus conversation in the bus.

Chuck and I finally came in the house and I showed him the ham shack/office which he somehow missed seeing on previous visits including our open house.  By 6:30 PM we were all hungry and Linda suggested La Marsa in Brighton.  It had started raining again and that, combined with the slightly later dinnertime, resulted in available parking spaces and immediate seating.  After studying the menu we suggested the Koshary and salad.  They accepted the recommendation so we each had lentil soup and split an order of Koshary.  The only difference was that we had ours’ spicy and they had theirs’ regular.  They also liked the garlic spread and warm pocket bread.  We finished the meal with coffee and Barbara sweet talked the manager, Gordon, out of complimentary baklava, this being their first visit to a La Marsa restaurant.

We got home around 9:30 PM.  The water softener finished regenerating around 8 PM so I put the next load of clothes in the washing machine.  Driving on our street we noticed that a branch on the south side about 0.2 miles in from the main road was hanging out farther and lower than usual to the point where we would not be able to navigate past it in the morning without scraping (scratching?) the side of the bus.  I located a small saw and Linda drove me back down there to try to cut it off.  At the point where I could reach the branch it was over 2″ in diameter and my little saw was not up to the task of cutting through it.  I did make enough of a cut, however, that I was able to bend it and get it to crack.  That allowed me to pull it down and tuck it into some other low branches and keep it off the road.  Not the nicest pruning job, but it was raining steadily and it was dark and I was standing in a ditch.

Linda transferred the laundry to the dryer and then started the dishwasher.  We finally got to bed at 11 PM where Linda read while I worked on this post and played a few games on my iPad.  We still have quite a bit to do to get ready to leave but should be able to pull out of here tomorrow around noon.

 

2015/05/29 (F) Many Celebrations

I was up late last night so Linda got up this morning before me, made coffee, and moved all of her plants to the front porch.  I got up a little while later and we had grapefruit and toast for breakfast.

Today was a day of many celebrations, starting with a mutual “happy anniversary.”  We were married on this date in 1971; 44 years ago.  The wedding took place in the lobby of the St. Louis (Missouri) Ethical Society at 5 PM on a Saturday with about 50 people in attendance.  The reception was held in the basement.  It was a simple affair with about 200 people.  A lot has happened in those 44 years.  As we approach our mid-60’s it is unlikely we will see 44 more anniversaries but a 75th anniversary is at least possible and is a goal.

We loaded up the plants and left around 9:20 AM for Ann Arbor.  We arrived at Madeline’s daycare center a little after 10:00 AM.  She is in the “Ducks” group and they were outside in the play yard when we arrived.  It was fun to see Madeline in this context interacting with other children around her age.  The Ducks eventually joined the other groups in the assembly room for the Welcome Shabbat which was already in progress.  The rabbi, whose name we did not get, was patient with his young audience and did a nice job.

Lunch followed the singing and ceremonies and Madeline got to eat with us instead of going back to the Ducks room.  The food at the daycare center is always vegetarian (not vegan) but we had plenty to eat.  After lunch we took Madeline back to the Ducks room and read stories while the other children ate their lunch.  The teachers set up the cots for nap time and we left at 12:25 PM, about five minutes before the nap time routine got started.  We enjoyed the “grandparents and special friends Shabbat.”

We went to Brendan and Shawn’s house to drop off the plants and pick up the electric pressure washer.  Brendan is going to take care of Linda’s plants while we are at the Great Lakes MotorCoach Association GLAMARAMA RV rally next week.  We have a higher pressure (3500 PSI) gasoline engine powered pressure washer but I have not used it in years and did not want to mess with it.  I need to wash the bus on Saturday and the electric pressure washer just makes that a lot easier.

We left for Westland Mall at 2:30 PM to allow plenty of time to buy cards for Ken, Brendan, and Shawna before arriving at Ashley’s Beer & Grill for Ken Schramm’s gathering.  Today was Ken’s last day at the Wayne County Regional Educational Service Agency where we were colleagues for the 12 years that I worked there.  Ken was the TV and Media Production Manager and was one of the truly good guys.

Besides Ken and our friend Kate de Fuccio I had a chance to reconnect with former colleagues, including:  Bill Heldmyer, Andy Henry, Jeff Gnagy, and Brenda Hose from the media department.  Greg Johnson, Cheryl Yokum, and Libby Pizzo were there from my former Instructional Services department and Libby’s husband Vince from the computer group was there too.  Maggie Mateer, Shirley Dushane, and Sandy Ellis were also there and my first secretary, Sheri Bartz, arrived just as we were leaving around 4:45 PM.  I had a ginger-pineapple cider (hard) and Linda had a Dogfish 90 beer.  I think her’s was more alcoholic than mine.

We headed back to Ann Arbor and traffic was a mess as we expected it would be.  Brendan and Shawna’s employment/tenure celebration was at Dominic’s across from the University of Michigan Law Quad.  I dropped Linda at the door and found a parking spot around the corner but did have any change for the meter.  I texted Brendan and Linda and a few minutes later Meghan came out with some change.  I only needed to feed the meter for 15 minutes, but failing to do so is risking a parking ticket in this town.  The only thing I like less than driving in Ann Arbor is parking in Ann Arbor.

We sat and chatted with Meghan and Chris and watched Brendan and Shawna greet and mingle with their friends and colleagues.  Many of their friends have children close to Madeline’s age so there were lots of kids for Madeline to interact with, especially Fiona.  By 7 PM Madeline was getting tired so we swapped keys with Brendan and took her back to their house in their car.  By the time we got her home and she had some black raspberries for a snack she was showing signs of being tired after a long, busy day.  Linda took her upstairs to use the bathroom but ended up getting her ready for bed.  There was some tearful “I want my mommy and daddy” but Grandma Linda is able to handle such situations very well and got her calmed down and into her crib.

Brendan had picked up some hummus, pretzel nibblers, and grapes for us so Linda and I had a snacky 44th anniversary dinner once she came downstairs.  We used our iPads until Brendan and Shawna got home around 10:25 PM, visited briefly, and then drove back to our house.  There was a message on our answering machine from FirstMerit Bank which handles the account for our SLAARC ham radio club.  Tomorrow starts early with our ham radio club breakfast followed by a trip to the bank so we went straight to bed.

 

2015/05/28 (R) Ice Cold Internet

I was up until after 1 AM last night fussing with my computer but the OS was updated and was running better (I think) when I finally went to bed.  I need my beauty rest so I did not get up until 9 AM this morning.  Linda had already made coffee so I checked the temperature of the refrigerator (41.4 degrees F) and then got out the soy creamer.  41 is better than 45 but given where the thermostat was set the temperature in the fresh food compartment should have been 35 degrees or lower.  We had a very late breakfast of homemade granola and small glasses of orange juice to wash down our vitamins.

Because I did not get to upload any blog posts last night I switched up my routine and spent the morning working at my desk.  The weather was very nice so Linda went for a long walk.  My computer was back to normal and I managed to upload nine posts to my blog (May 10 through 18) by 1 PM.

I had an e-mail back from Ken Schramm yesterday letting me know that his “last day at Wayne RESA” gathering would get underway around 3:30 PM at Ashley’s Beer & a Grill at Westland Mall.  Brendan and Shawna’s celebration is from 5 to 8 PM in Ann Arbor so we will be able to attend both events although we might not make it to Ann Arbor until 6 PM.

Today was our friends’ 44th wedding anniversary.  Butch and Fonda were married the same year we were one day before us.  We did not know each other then but are now friends through our mutual passion for converted highway buses.

Brendan called and talked to Linda.  It turns out that tomorrow is grandparents/special friends Shabbat at Madeline’s daycare center and Brendan thought we might want to attend.  It starts at 10:30 AM and includes lunch.  The food at the daycare center is vegetarian but not vegan so we will see how that works out.  Brendan is going to take care of Linda’s plants so we will take these with us and go to his house when we are done at the daycare center.  I will pick up our electric pressure washer while we are there so I can wash the bus on Saturday.  We were going to buy cards today for Ken, Brendan, and Shawna but decided we would do that tomorrow on our way to Ken’s gathering.

Linda made large green salads with chickpeas for lunch.  We both put on a few pounds over the winter and really want/need to take them off.  After lunch I worked in the bus.  I removed the wood trim along the top of the beveled strip mirrors on the wall in hallway.  The strips were glued directly to the wall so I put the trim back on.  If we do not want to see these mirrors we will have to figure out some way to cover them.

There was a triangular horizontal panel between the upper edges of the J-lounge and the dinette with four switches mounted in it.  Two of those switches no longer control anything but the other two still do.  I secured the panel above the passenger side HVAC chase and blocked it in so it could not move.  I dressed all of the loose wires with cable ties and cable clamps and secured them to the floor.  I cut two grates from a piece of expanded metal and secured them over the two holes in the driver side HVAC chase where the sleeper-sofa was installed.  That sealed up the last of the holes that the cats might get into.  If one of them got into the HVAC system we would have disassemble half the bus to get them out.

I removed all of my tools and miscellaneous parts from the bus and set them on steps leading to the house.  I had put one of our folding chairs inside the bus to sit on and moved it to the location of the passenger chair as a safety barrier after I moved the trash can out yesterday.  I folded it up and put it back in the bay where it is stored.  While Linda vacuumed the inside of the coach with our Shop-Vac I put tools and parts in the garage or back into the appropriate tool boxes.  When she was done we got the Shop-Vac out of the bus and put it in the garage.

There is a maple grab handle on the right side of the entrance stairs (as you enter the bus) attached to a piece of maple trim from the back side.  The finish is worn and the handle is loose.  I wanted to tighten it, which required access to the back of the trim board.  Linda recalled that we had Creative Mobile Interiors (CMI) tighten this handle when we first got the coach so we figured there had to be a way to get to the back of the trim board.

We removed the cockpit HVAC access panel just below the trim board but it did not appear to provide access to the back of the trim board.  I removed the only two screws I could see (at the right end of the trim) but it still would not come loose.  I figured the trim board had to be screwed on somewhere else and the only possible place was under a piece of inset brass finish trim.  This brass trim is used throughout the bus, including around the edges of the Corian counters, and has an adhesive backing.  I have found screws under it in other places so I pried the end up and peeled it out, revealing three screws.

I thought I was on the verge of success until I removed the three screws but still could not get the trim board loose.  I tried prying it at various points with a screwdriver but it would not budge and we finally came to the unhappy conclusion that it was glued on.  Perhaps it is secured from underneath in some manner that we did not see but I will have to return to this when I have more time.  Linda suggested that we cut the handle off and install a new one that can be screwed on from the front.  She’s a clever girl.  As long as the access panel was off we vacuumed out the cockpit HVAC system and then replaced the panel.

About this time a UPS truck went by headed deeper into our neighborhood.  Since we live on a dead end street I knew the truck would be coming back so I waited for it and flagged down the driver.  I explained to the young man that we had two packages delivered to the wrong house in the same week about a month ago and that I had called the 800 number and talked to customer service but I would appreciate it if he would mention it to his colleagues as we will be ordering a lot of stuff starting in the second week of June.  He was very nice and said he would.

Our last bus task for today was the hard one.  We moved the passenger chair from the garage back to the bus using a hand truck so we did not have to carry it.  It is very heavy but with Linda guiding the top and me supporting the base we got it inside and set in position.  We tilted it fore and aft so I could slide the mounting studs into position and line them up with the holes in the base.  I then bolted it down to the support rails by tightening the four nuts.

This was all trickier than it sounds.  The bolts have square flanges that have to engage in the open slot of the channel to keep them from turning while being tightened or loosened.  But that required me to pull up on the studs as the nuts were not going on that easily.  As when I took the nuts off, I had to wedge one of them up with a screwdriver while I got the nut tight enough that the bolt would not spin.  I reconnected the power to the chair and we checked that all of the adjustments still worked, especially the footrest.

With the installation of the passenger seat we were done working on the bus until after GLAMARAMA and have two seats with seatbelts so we can tow the car rather than drive it separately.  This will be much nicer for us and the cats, although I expect the modified interior will freak them out initially.  We will be gone most of Friday but have Saturday to prepare food, reload the coach for the week, and wash the exterior.  Oh the joys of owning a converted coach.

For dinner Linda served the last of the whole wheat capellini with Portobello mushrooms and asparagus and steamed some broccoli.  A piece of whole wheat bread and a small glass of Leelanau Cellars Winter White wine completed the meal.  We had watermelon for dessert later.

I returned to my office after dinner and updated our Rand-McNally RVND 7710 GPS.  I then continued uploading blog posts.  By the time I quit working around 10 PM I had uploaded nine more posts and was caught up!  I think 18 posts in one day may be my all time record.  I did not get to work on articles for BCM, or copy files between our NAS units, but I was satisfied with what we had accomplished today.

 

2015/05/27 (W) The Root of all Things

Yesterday I used up the last of the coffee beans that Jeff at Teeko’s shipped to us in Quartzsite in late February so this morning I transferred the beans we had roasted last week into our airtight containers and started using them.  Grinding our own custom roasted coffee beans is how my mornings usually start and is just another small thing I like about being retired.

We rarely made coffee at home in the morning when we were employed outside the house.  It took too much time and made a mess that had to be cleaned up later, including the travel mug that we had to remember to rinse out at work and then bring home.  Besides, Linda got free unlimited coffee and tea at the office and I found it easier to stop at Panera and get a large coffee to go; half hazelnut and half decaf.  It was part of my morning routine that I found comforting and the cup was disposable when I was done.

I had a follow-up appointment and evaluation at the endodontist today, so I did not work in the bus this morning other than to take a few pictures of the old dinette corner, where I removed the mirrors yesterday, and the area under the bed, which I also worked on yesterday.

After morning coffee and breakfast I went to my office to work at my computer.  I off-loaded the pictures I just took, selected a few, processed them, and copied them to the folder for this blog.  I then downloaded and installed Adobe FlashPlayer in order to view the Gilbreath Upholstery Service website.  The download also installed a McAfee virus checker that I did not ask for or want and I don’t recall being given an option to opt-out.  I really dislike it when programs do things like that.  In fact, I think it should be illegal and companies who do it should be subject to heavy fines.  I tried to download the PDF catalog but Adobe Reader said it had an unrecoverable error.  Arrrgh!  I e-mailed them to request one that worked.  We will see if that results in anything.

I was responding to a few e-mails when Butch called.  He was trying to figure out the best way to connect up the eight L-16 6 VDC batteries he bought in Quartzsite to make a 24 VDC battery bank with a 12 VDC center tap.  Working only from verbal descriptions we finally ended up with the same diagram of a series-parallel interconnection scheme with equal electrical path lengths through all of the batteries.  The difference between series-parallel and parallel-series is not important when the batteries are operating correctly but each connection scheme is vulnerable to a different battery failure mode.  I happen to prefer the series-parallel scheme as I think it results in better battery charging, but that’s an often debated subject.  The equal path lengths through the batteries, however, is something that is worth accomplishing if at all possible.

By the time we were done talking I needed to leave for my endodontist appointment.  Dr. McWatters said the root canal they did on my upper right rear (tooth #4) last September looked good.  They tested the upper rear teeth on my left side but did not find any indication of a problem.  That would normally be good news, except that I had an intermittent problem in that area all winter so I know something is wrong and will eventually require attention, most likely when it is least convenient for me (middle of the night on a weekend).  But for now there is nothing more to do.

hen I got home I had a few pretzels and hummus and some red grapes and then got back to work at my desk.  I copied my blog post drafts for the 17th through the 26th from e-mails to Word and started editing them.  I took a break to have some tea and write while Linda cooked dinner.  She grilled two veggie burgers along with the rest of the asparagus we bought on Sunday and served the potato salad she made earlier in the day.  Most of the asparagus was mushy except for the tips which I attributed to the plants not the cook.  These were very large purple stalks, not the usual somewhat thinner green ones so maybe that had something to do with it.

After dinner I returned to my desk and finished editing all of my blog posts for May 10 through 26.  Somewhere in the middle of that work Phil Jarrell returned my phone call from yesterday.  We agreed that I will call him back after the GLAMARAMA Rally and he will bring his laser level and we will shoot some elevations.  With a little luck and a bit of perseverance we may get a gravel driveway connecting the 3rd (westernmost) culvert to our concrete driveway with a level spot for one or two guest RVs to boondock. We will also get a dozen tree stumps removed, get a French drain installed to remove water from the western end of the property, and get a hole dug for a ham radio tower foundation.  That last bit of digging will also require a rebar cage, hinged tower base, and coordination with a supplier that can pump concrete immediately after the hole is dug.

When I was done editing my blog posts I logged into our WordPress site, deleted 181 spam comments, and installed an update for our Fast Secure Contact Form plugin.  I started creating the post for May 10 but half way through the Chrome browser became non-responsive indicating that it might be out of memory.  That seemed unlikely, but I closed all of the program’s I had open, shut down my computer, and restarted it.  When I logged back in nothing was responding so I sat and waited until I was eventually able to do things.  The first thing I did was uninstall the McAfee Security Scan app that got installed along with the Adobe FlashPlayer earlier today.  I then proceeded to download three updates for Windows and MS Office, or tried to.

The three updates were only 27 MB total, but after 35 minutes they were only 53% done.  My guess was that the data rate on our AT&T “High Speed Internet” (DSL) connection had slowed to a barely usable trickle, perhaps because of all the rain we had the last few days, but whatever the cause it was almost midnight so I left it to finish at its own pace and went to bed.  I worked on this post and played a few games by which time it 12:45 AM so I got up, put on my robe, and went back to my office.  The download had finished and two of the three updates had installed.  The third one reported an error but Windows Update needed the computer to be restarted to finish the installation so that’s what I did.

Windows updates normally install during shutdown and finish installing on startup and that is precisely what happened this time as well.  I let the system startup completely (until the hard drive light was not on) and then downloaded, installed, and ran the latest version of CCleaner.  It downloaded much faster so maybe it was the Microsoft update server that was slow, or perhaps the McAfee app was causing the problem.

We had rain yesterday and more rain today, including some thunder.  The lights flickered a few times both days but the generator never came on.  If out Internet performance is still sluggish in the morning I will reset the AT&T gateway and see if that helps.  I also noticed that our home refrigerator was suddenly showing 45 degrees F instead of 40.  Linda had loaded it up with food yesterday, and added the potato salad today, but the temperature should not have changed by that much and should have returned to the 40 degree set point within a few hours.  Even adjusting the thermostat down did not rectify the problem over the course of the day so perhaps something else has changed, such as a blocked vent.  I will have to check for that tomorrow.  Hopefully the power blips did not blip some control circuit.  I think I will pull the fridge away from the wall and cycle the power.  We can vacuum off the back while it is out.  If it still won’t hold the temperature we want Linda might get a new refrigerator for the house sooner than expected, although a call to AAA Appliance Service Network in Howell might a more prudent first response.

2015/05/26 (T) Reflections

I decided to put off doing the laundry until later in the week.  Linda made a grocery shopping list while we had our morning coffee.  I called Pat Davidson at Apex Roofing to discuss the installation of a roof access hatch.  We did some online research for pest control companies in the Brighton-Hartland-Howell area and decided to call Best Pest Control LLC.  I talked to the owner, Ryan, about his perimeter defense package, and decided to give his company a try.  They will spray outside the house for ants, spiders, hornets, wasps, and yellow jackets.  I called Phil Jarrell from Precision Grading and left him a voice message regarding some additional driveway work, a French drain for the west end if the property, and a hole for a ham radio tower foundation.

I showed Linda the pullout pantry slide hardware I found last night on the Rockler website, a German made top-bottom pair specifically designed for this application and able to support up to 450 pounds.  It’s pricey, but it looks like the right stuff for the job.  We also found some assembled pullout pantries online, including some that were 5″ wide, but they were not deep enough and getting just the right height looked tricky.  We really want to maximize the use of our available cubic inches.

Keith showed up around 10 AM with his new Scag riding lawn mower.  He is still going to have the Hustler repaired as a backup, but the Scag is a nicer/better machine.  It is fuel injected, which should be more reliable, and it is faster, which makes more efficient use of Keith’s time.  It also has a seat that can be adjusted from soft to firm, making for a more comfortable operator experience over the course of a long day.

As much as I need to work at my computer and drafting table I need to work even more in the bus right now.  I started by reassembling the inside of the cabinet above the refrigerator, except for the liner carpet, and reinstalled the fluorescent light fixture on the ceiling.  I am keeping the carpet pieces for now, but mostly to use as templates for new material.  I would have preferred white Formica interior surfaces, as they are brighter and easier to keep clean, but the bus has a lot of curves and carpet is a very conformable and forgiving material.

The interior of the bus deconstructed in preparation for a new floor, seating, and custom desk.

The interior of the bus deconstructed in preparation for a new floor, seating, and custom desk.

My next task was cleaning out and securing the area under the bed platform.  I removed the half box covers, the flexible ducts, and the floor-mounted cleats.  I threw the ducts away and stored the other pieces in the garage.  I then reattached the strip light on the top edge of the forward side of the base, reinstalled the two circular HVAC registers (so the cats could not try to get under the bed through the holes), put the cover plates back on the two duplex AC outlets and reinstalled the outlet expanders which also have dual USB charging ports.  I need to put some sort of temporary netting over the port holes in the section of the HVAC chase under the bed, but I need to find a suitable material for that.  The long term plan is to seal those holes and install registers in the sections of chase outside the bed base.  I thought about disconnecting the lift struts for the bed platform so I could raise it higher and reinstall a drawer onto its glides, but decided to leave that for another day.

While I was working in the bus Ryan from Best Pest Control called me back and said he had a crew that could fit us in within the hour so I said “sure.”  I closed up the house as they would be spraying around all of the windows, doors, and doorwalls.  Two guys showed up a little while later and I walked them through the job, wrote a check, signed the work order, and they got busy.  They found two hornet nests by the east end of our deck and destroyed them.  I hate to kill even a hornet but they have been buzzing around our windows and doors, poking at voids in the mortar on the face brick, and occasionally getting into the house and we need to put a stop to their use of our residence as a place to build their homes.

The pest control guys were already gone and Keith was driving away as Linda returned from the supermarket.  I helped get the groceries into the kitchen.  After they were put away we had a light lunch around 1 PM of fresh baby carrots, mini bell peppers, sourdough pretzel nibblers, hummus, and red grapes.

The dinette seat used to fit in this corner The strip mirrors have been removed from the outside wall next to the window.

The dinette seat used to fit in this corner The strip mirrors have been removed from the outside wall next to the window.

I have been taking a lot of short breaks while working on the bus.  It was warm and humid again today and warmer still in the coach even with windows open and the roof vent fans exhausting air.  But the breaks are not just to rest, they are also to ponder the details of how the interior will get rebuilt and what additional deconstruction still needs to take place.

In the front of the coach there was a 120 VAC electrical cable coming out of an access hole in the passenger side HVAC chase, passing through a 4″ flexible duct adapter, and disappearing through a hole in the floor.  I originally thought the cable came from the duplex outlet on the wall just above the access hole but I discovered that it did not.  It was routed through the chase from somewhere farther back in the bus.  I determined that that the hole in the floor appeared to go into the OTR HVAC bay and sure enough, when I opened the bay there was the cable coming through the ceiling.  It turned towards the center of the bus and then went through the wall into the bay to the front.  It was then easy to determine that it was the power feed for the electric heater mounted on the rear wall of the front bay.

The storage area under the end platform with the 4" flexible ducts and cover boxes removed.

The storage area under the end platform with the 4″ flexible ducts and cover boxes removed.

At that point I knew which circuit breaker to turn off and was able to cut the cable in the living room without risking an electrical shock.  I slipped the 4″ duct adapter off and set it aside.  We don’t generally use the electric heater in the front bay, and certainly do not need it this time of year, so I wire-nutted the ends of the hot and neutral wires, coiled them up, and stowed them in the HVAC chase for the time being.  I coiled the end of the wire coming out of the floor around one of the Aqua-Hot coolant hoses so it would not drop into the bay below.

The area of the bus that was the outside rear corner of the dinette kept drawing my attention.  That corner was decorated with vertical strip mirrors with beveled edges.  There are also strip mirrors used as wainscoting on the lower portion of the outside wall of the hallway and at the end of the hallway opposite the bathroom door.  The strip mirrors are the one thing in this bus we have never liked but they did not bother us enough to not buy the coach.  Now that we are involved in a major interior remodeling, however, we are looking for ways to remove them or cover them up.  We really do not like them.

In the case of the former dinette mirrors, I had previously determined that the ones against the wall of the coach were mounted (glued) onto a sheet of plywood that appeared to be mounted to a pair of cleats along the two vertical edges.  I tried prying under the bottom of the first strip but it cracked and chipped.  It quickly became apparent that removing these strip mirrors from whatever they are glued to was probably not a viable option.

The beveled strip mirrors in the hallway of our bus.  We really do not like these things.

The beveled strip mirrors in the hallway of our bus. We really do not like these things.

[p4 R]  After removing a 1-1/4″ wide piece of thin trim wood I was able to loosen the left (forward) edge at the bottom.  The walnut trim around the fixed window just forward of the mirrors, however, prevented me from pulling it out any farther.  I had a reasonably good idea how the window trim was attached but first I had to remove another piece of 1-1/4″ thin trim that covered the gap between the window trim I needed to remove and the trim for the next window forward.  With Linda’s help I removed eight screws and the 3-sided window trim came right off.  We set it carefully aside and returned to the mirrors.

With the window trim removed we were able to pull the left (forward) edge of the plywood mirror backing out enough to see behind it.  Our lucky “break” (no pun intended but, whoops, there it is) was that the screws holding the plywood to the left cleat pulled out of the cleat.  I say lucky because the screw heads were under the glass mirror strips and none of the mirror strips broke.  We kept working it out until the upper edge bumped into the return air grill trim on the underside of the upper cabinet.  We removed the grill and set it aside.  We were then finally able to pull the left edge out far enough that I could remove a couple of screws that were holding the right cleat to the panel that forms one of the back walks of the pantry.  Something was still holding it and when I changed position I saw that there was another screw near the top.  I removed that screw and the whole panel came out with the right cleat still attached.  Three more screws and the left cleat was also out.  We reattached the return air grill to the underside of the upper cabinet and then reattached the window trim.

The wallpaper behind this panel was in very good shape except for the screw holes where the cleats were attached.  We plan to put shelves in this corner to utilize the space and they may get used for some ham radio equipment.  Regardless of what ends up there having the mirrors out gives us more room for the shelves and will just plain look better.

A view from the kitchen of the dinette corner and hallway.  A custom desk will go where the dinette seating used to be and double as work surface for the kitchen.

A view from the kitchen of the dinette corner and hallway. A custom desk will go where the dinette seating used to be and double as work surface for the kitchen.

The mirrors on the other wall of this corner are glued directly to the walnut panel that forms one of the backs of the pantry.  I tried loosening the bottom edge of the one in the corner and it cracked.  That area will be concealed by the desk, but we will cover all of the mirror strips with some sort of thin panel.  We have the same problem with the mirror strips across from the bathroom door and may just have to live with those as I have not come up with an attractive way to cover them.  I need to investigate the strip mirrors in the hallway.  There is a good chance that they are glued to plywood panels that are screwed to the wall at locations covered buy wood trim.  If we are lucky removing the trim will allow us to unscrew and remove the mirror panels.  If not, we will just put the trim back on.

I have had the idea for a while that we could make another low pantry or shallow storage area along the hallway wall above the HVAC chase where the strip mirrors are currently located.  Linda does not like the idea as she is concerned it will make the hallway to narrow.  The storage would not be any deeper than the HVAC chase is now, and would not be any higher than the wood trim along the top of the strip mirrors, which serve as a kind of wainscoting.

By this point it was 5:30 PM.  Linda headed inside to fix dinner while I got trash and materials out of the coach and carried them to the garage.  Linda let me know that a severe thunderstorm watch had been issued effective until 10 PM.  It rained lightly off and on until we sat down to eat and then the downpour came but we did not have anything severe, just heavy rain for a while.  She made a dish using garbanzo beans, garlic, kale, salt, pepper, and fresh lemon juice.  It was delicious and the fresh lemon juice really made it sparkle.  She also served the last of the risotto she made for dinner when Steve and Karen were here on Saturday.  We had strawberries with Lotus brand Biscoff cookies for dessert.  I worked on this post on my iPad, took a shower, and went to bed.  I never did make it to my office today.

 

2015/05/25 (M) Memorial Day

We spent the morning lounging around drinking coffee and enjoying the holiday.  Hey, even retired people need a day off.  Actually, we continued to research refrigerator, seating, and upholstery options for the bus, taking a break to have a tofu scramble and toast for breakfast.

We stumbled upon the Yale Appliance blog which proved to be very informative.  Yale is a very large appliance store in the Boston area and maintains a blog about appliances.  After reading what they had to say in some fairly recent postings we realized that we should probably not be looking for a “counter depth” refrigerator.  It also appeared that our best bet in terms of case dimensions and interior volume might be a standard top freezer design and our best bet in terms of both price and reliability might be a Frigidaire.

We went to the Frigidaire website and found that the FFHT1621QB might fit our needs perfectly.  It is a 16.3 cu. ft. top freezer design available in black, white, or stainless steel with doors that can be hinged left or right.  (We need a fridge with doors the hinge on the left.)  It is 28″ W x 30-1/8″ D x 64-3/8″ H and only needs 3/8″ clearance on the top and sides and 1″ in the rear.  The depth includes the doors and handles; the depth of the case alone is only is 26-5/8″.  Our refrigerator alcove is 33-3/4″ W x 29-1/2″ D x 66-3/4″ H so it will fit easily, recessing a bit more than our current 22.6 cu. ft. Jenn-Air and leaving 5″ to its left for a pull out pantry.  The pantry will have be custom built and measure approximately 5″ W x 28″ D x 66″ H including top and bottom mounted slides/guides.  Also of importance, we will not have to modify the cabinet above the refrigerator alcove.

In terms of seating we checked out Gilbreath Upholstery’s website but then concentrated on the Bradd & Hall website.  Bradd & Hall is a well-known RV (& marine) furniture supplier in Elkhart, Indiana.  They handle the Flexsteel RV and marine product lines and also sell the Lambright Comfort Chair product line, although the latter is available directly from Lambright in Shipshewana, Indiana.  We have sat in the Lambright Lazy Relaxor Lite swivel recliner (wall hugger) at RV rallies and found it nicely sized and very comfortable for us.  It is 24″ W x 33″ D x 38″ H and needs 2.4″ clearance from the wall.  It is normally a free-standing chair so we are unclear whether it can be secured to the floor or be used with seat belts.  We plan to visit Bradd & Hall on Monday, June 1 before we check into the GLAMARAMA rally and this is one of the things we will ask about.

Bradd & Hall also sells a Flexsteel Barrel Chair with a bolt down pedestal base that locks in different positions and includes a bar for attaching seat belts.  It is 26″ W x 30″ D x 34″ high and might be a better fit for our bus and what we are trying to accomplish with our remodeling project.  Last, but not least, they sell Flexsteel Captain’s Chairs (which Flexsteel calls “bucket seats” on its website).  We need a chair of this type to replace the oversized front passenger chair and possibly to replace the driver’s chair.  My hope, however, is to get an ISRI 6800 seat for the driver’s position.  These are the seats that are normally installed on tour buses.

An advantage to getting everything from Bradd & Hall, except for the ISRI driver’s seat, is that we can get the same fabric on the passenger Captain’s chair and living room chairs and buy additional materials to have the seat and back cushions made for the sofa that I will build (with storage underneath).  We will probably find a folding chair for the desk and can have the seat recovered in the same material so that everything is coordinated.

Linda called the J. C. Penney’s salon to see if Renee was working and had openings.  She was, and she did, so Linda booked a time, grabbed her car keys, and headed to Twelve Oaks Mall.  That seemed like an opportune time for me to head to the bus to double check measurements and ponder design solutions.  I checked the dimensions of our refrigerator alcove and the Frigidaire FFHT1621QB will definitely fit very nicely.  The front part of the passenger side of the bus has 13′ 3″ of flat floor space available for a desk and two chairs with a small dining table between them.  On the driver side of the bus the aft end of the sofa nook is 7′ 2″ from the entrance step.  If I can fit both chairs and the table in the first 7′ 2″ on the passenger side we will have room for a 6′ long desk that is 26-1/2″ deep.  That’s long enough to have a file drawer on one end and a printer shelf on the other end with plenty of room in between for a chair.

We have been planning on reusing the Corian top from the old dinette table so I decided to disassemble the top from its base.  I had never really looked at the construction before now and discovered that the Corian is glued to a wood panel that is secured to the two massive posts that are screwed to the base.  I was able to disconnect the base from the posts easily enough but there did not appear to be any way to separate the Corian from the support structure.  I took a few whacks at it with a pry bar and small sledge hammer and it was clearly not going to come loose.

The good news is that we can now select a new table top in whatever size, shape, and material suits us and use the same material for the desk top, which will double as additional kitchen counter space.  Our assumption has been that we will use Corian, but Corian is heavy so we will consider other options before making a final decision.  We discussed extending the desk top all the way down the wall to the front of the living room, although it would only be about 6″ deep at most, and building shallow cabinetry to go under it and fill in the space above the HVAC chase and below the window trim.  That space will essentially be wasted otherwise, and have to be finished in some way, so building small storage spaces is worth considering with or without the extended desk top.

What all of this comes down to is that we have to select the two chairs we want to use in conjunction with figuring out the table size and support system, and then finalize the design of the desk.  We plan to recondition all of the woodwork (with Touch of Oranges and Touch of Beeswax) and replace the refrigerator before we install the new floor, which has to go in before the furniture.  That’s the order in which decisions have to be made and the work has to be done.  Chairs and custom woodwork are potentially long lead items so we need to get them finalized and ordered, but they are the last things to get installed, so it should work out OK in the end.

It rained hard for a brief time mid-afternoon, after which Linda went for a long walk.  She was walking almost daily this winter in Quartzsite, Arizona but has not walked much since we got home.  That gave me time to work on this blog post.

Earlier in the day we snacked on nuts instead of having lunch.  Linda made whole wheat capellini for dinner using the Portobello mushrooms and some of the asparagus we bought yesterday at the Howell Farmers Market.  It was delicious.

I had intended to work at my computer most of the day but that obviously did not happen.  When I finally went to my office after dinner I had a long chat on the phone with Butch about hardware for the slide out pantry and other bus-related things and then checked a few websites that he suggested as good sources of specialized hardware.  I then e-mailed GLCC members about parking with the chapter and took care of some other e-mail.  In addition to computer-based work I need to keep working on the bus but I am also at the point where I need to order some things and then settle in and work on drawings for the desk, pantry, and sofa.

 

2015/05/24 (N) Nuts to That

We had our usual coffee and breakfast granola but made a more leisurely morning of it than normal.  We finally got dressed around 11 AM and headed to the Howell Farmers Market at 11:20 where we bought another bar of soap from Marjorie.  I got to pick this time and chose the ginger-grapefruit.  We bought the Eucalyptus soap two weeks ago and Marjorie suggested letting them air dry for two weeks before using them.  We will see how long the Eucalyptus bar lasts once we start using it and that will tell us how often we need to purchase from her to stay ahead of our usage, allowing for drying time.

We stopped at Lowe’s to return the “white” toilet seat and buy a “biscuit” colored one.  We looked at pipe wrenches but did not buy one.  I did by a 14 TPI, 6″ long blade for my Sawz-All that said it would cut metal up to 1/2″ thick.  I still hoped to get the nut off of the trailer ball on the lawn tractor without having to cut the threaded stud, but the blade was my backup plan.

We had a brief confab regarding the motorcoach refrigerator alcove and cabinet.  I found my small plumber’s toolbox and it had several pipe wrenches inside.  I took the largest one and checked to see if/how it would fit the trailer ball on the lawn tractor.  It opened more than wide enough and looked like it would snug down tight around the throat of the ball (between the ball and the hex flange base).  Linda kept the pipe wrench from slipping out of position on the ball while I used the torque wrench with the 3/4″ drive, 1-1/8″ socket to remove the nut.  It was still a bit of work but we got the ball off without cutting, cracking, or heating.  I then backed the lawn tractor up to the utility trailer and Linda connected the trailer yoke to the tractor tow plate.

Next we tackled the hall bathroom toilet seat replacement.  Once again we encountered nuts that would not come off.  This time the nuts were a hard plastic but the bolts were rusted and the nuts would not turn.  I eventually cut through the two plastic nuts with a utility knife and pried them apart allowing us to remove the old retaining bolts.  We installed the new seat/lid which came with its own special bolt and elongated plastic nut.  The nuts had special tips designed for 1/2″ sockets and engineered to break off when tightened to just the right point.  We had both nuts torqued down and broken off but the seat was slightly crooked so I had to loosen then, reposition the seat, and re-tighten them by feel.  What should have been a simple, short job ended up being a long and difficult one, in part because there was not a lot of room on the sides of the toilet bowl to get under here and work.  As we were cleaning up Linda noticed that the toilet tank was leaning slightly to the right relative to the base/bowl and thought we should adjust it.

I was already aware of the leaning tank, and the fact that it was not as tight as it should be.  The tank is held to the bowl by two bolts that go through the bottom of the tank and are sealed by gaskets under the heads.  I tried tightening the wing nut on the left bolt.  Even though it was rusty I was able to turn it, but the tank immediately started leaking from the bolt hole in the bottom.  We shut off the water and flushed the toilet to get most of the water out of the tank.  Linda held the left bolt head with a long flat blade screwdriver while I turned the wing nut on the underside of the bowl, first by hand and then with pliers.  I was careful not to over torque it and the tank was still a bit wobbly, but it was straighter and it did not leak when we refilled it.  We will keep an eye on it.  A leaky tank will result in water continuously running onto the floor and causing major damage of not detected quickly and stopped.

Linda cleaned up the bathroom while I put the tools away.  We then changed the primary whole house water filter.  The filter we use is the same 10″ length as a standard potable filter element but is about 5″ in diameter and has two micron ratings.  It’s a spun polypropylene media that is 50 microns at the large outer surface and 5 microns at the small inner surface.  In principle it filters better and longer than a single micron rating element by filtering out larger particles first and thus not clogging up the 5 micron material with large particles.  The same thing would be accomplished, of course, with two filters in series, or three, or four, each with progressively smaller micron ratings.

The Post-It note by the filter said we had last changed it on 11 November 2013.  If that was true it was way overdue to be replaced.  The element was completely black from outside to in so it had been in there longer than the fall of 2014 for sure.  We are starting to get some slime in the toilet tanks again and the water seems to have a slight black tinge, but that may have been due to the filter element needing to be changed.  I may need to have Adams Water Treatment come out again to discuss installing an iron filtration system.  Our drinking/cooking water still goes through a reverse osmosis system, so it is very pure.

Having accomplished several rather physical tasks I decide to sit in the living room and work on my blog posts for the last few days.  Linda made hot tea for us to enjoy while iPading, after which she reheated the leftover risotto and asparagus from last night’s dinner and we finished the open bottle of 2013 Egri Merlot.  After dinner I finally settled in to work on computer-based tasks.  I had a long list of things to do but did not get to most them.  I did manage to off-load recent photos of the bus interior from my camera to my computer, select a few to use in blog posts, and processed them.  I edited a few more blog posts but did not get them uploaded to our website.  I then dealt with e-mails and went to bed.

 

2015/05/23 (S) Radio Cabinet Company

Today was “V. E.” testing day (volunteer examiner) so a half-dozen members of our amateur radio club were at breakfast even earlier than usual.  (Our club does not test volunteer examiners, we have members who volunteer to give amateur radio licensing exams to people who want to get or upgrade an amateur radio license.)   We were later than usual and ended up at the far end of a very long table arrangement, as there was a large turnout, but that gave us a chance to chat with a different group of people.

Mike Sharpe (W8XH) had a flyer he printed on his mother’s car, a 2005 Ford Taurus in excellent condition with only 21,000 miles.  He was asking $5,800 which is slightly below the suggested Blue Book value.  I texted our son to see if they might be interested in the car.  Linda and I both had Ford Taurus cars starting in 2000.  I had a beige station wagon with a beige interior and Linda had a red sedan with a gray interior.  Our children eventually ended up with these vehicles, Brendan with my car and Meghan with Linda’s.

Back at the house Linda made a shopping list and headed to the grocery store while I changed into my work clothes and got to work in the bus.  My focus today was deconstructing the cabinet above the refrigerator.  I could tell from the dimensions that it was probably a box-within-a-box, but did not know how it was built.  I removed all of the carpeting from the inside surfaces, labeling the back of each piece in case I decided to reinstall them.  With the carpet out it became obvious that the floor, sidewalls, and back of the cabinet could be removed as I could see the screws and angle brackets that held them in place.

The cabinet above the refrigerator in our bus with the inside panels removed revealing lots of wiring.

The cabinet above the refrigerator in our bus with the inside panels removed revealing lots of wiring.

The floor was in two side-to-side pieces which were narrow, each sidewall was a single piece, and the back was in two pieces.  All of the pieces were sized to fit through the front openings in the face frame, a very clever design.  There were cleats supporting the floor and spacing the back and side walls out from the larger permanent structure of the refrigerator alcove.  The panels I removed served the dual purpose of getting the bottom and sides to line up with door openings and providing space to run wires while concealing them.  Things got trickier after that.

The walnut face frame was assembled with glue and pocket screws.  It had cleats along both rails and the two end stiles, all of which appeared to be glued and screwed to the face frame.  In addition, the piece of walnut veneered plywood that separated the refrigerator space from the cabinet above was glued and screwed to the underside of the lower rail cleat.  In other words, it was a solid and very professionally assembled cabinet.  The bottom board was attached to the two sides with angle brackets and it appeared that I might be able to remove the face frame and bottom board once the side and top cleats and brackets were unscrewed.  The top rail of the face frame, however, was tucked up behind some ceiling trim, preventing me from pulling the whole assembly straight out.  I loosened the trim and found that pulling it straight out was probably not my best option.  To get it out I would have to drop it straight down which will require the refrigerator to be out of the alcove.

The Aqua-Hot has been on with the thermostats set to 55 degrees F in case it got too cold.  It was cool today so I turned the engine preheat pump on to warm up the main engine.  When it was time for lunch I started the main engine and let it high idle while we ate.  After we were done with lunch I moved the coach backwards (to release the brakes if they were bound up) and then forward enough to put the tires at a different spot.  I set our electronic level on the centerline of the floor and then lowered the front and passenger side rear to level the coach.  When I walked around it actually felt level, which it rarely did when trying to level off of one of the floor tiles or the kitchen counter.

I quit working around 2:30 PM as Linda was getting ready to prep ingredients for the risotto she planned to make for dinner and got cleaned up.  I used to cook a lot but since we switched to a vegan diet Linda has done almost all of our cooking and, except for making coffee, tea, and popcorn, the kitchen has been her exclusive domain since she retired and we moved to the new house.  But I offered to help and she agreed to let me so I diced an onion and five cloves of garlic while she sliced mushrooms and other things.  By the time I was done I had about 40 minutes before Steve and Karen were due to arrive, so I updated my medical history for Root Canal Specialty Associates.  I have a follow up visit with them in Wednesday.

Steve and Karen arrived at 4 PM and we settled in to conversation and munchies (they brought a mixed fruit salad, pistachios, and mixed nuts).  We finished up the open bottle of Malvasia Bianca from Heart of the Desert Winery (Eagle Ranch) in Alamogordo, New Mexico.  After chatting for a while about our respective winters—ours in the Southwest and theirs near Venice, Florida—we gave them a quick tour of the inside of the bus.  It looks quite a bit different now compared to January 2014 when they spent a couple of nights in it at Williston Crossings RV Resort enroute to Venice, Florida.  It will look even more different (hopefully) once we are done with the remodeling.

Linda eventually had to attend to the final preparations for dinner.  Karen helped by stirring the mushroom risotto while Steve and I stayed out of their way chatting in the living room.  Linda roasted refresh asparagus and sliced a baguette to go with the risotto.  I opened a bottle of the 2013 Egri Merlot to go with dinner.  Steve does not drink alcoholic beverages or coffee and Karen prefers drier red wines, but she seemed to enjoy the Merlot all the same.

The weather had been beautiful all day and we sat on the rear deck after dinner enjoying our last sips of wine.  Once the sun dropped behind the trees it cooled off to the point where it was uncomfortable and we went back inside.  I turned on the natural gas fireplace logs but left a window open which seemed to strike the right balance of temperature and mood.  By 10:30 PM we had caught up on travels, families, and hobby interests.  They had a 45 minute drive to get home and usually leave around that time.  We had a long but very satisfying day and were quickly to bed once they were safely on their way home.

 

2015/05/22 (F) Stuck Nut

Our day started, as it usually does, with coffee and breakfast.  When we finally got to work on our tasks for the day we started by putting various things in the house back where they belonged, many of them having been piled on beds or put in uncarpeted areas while Jack cleaned the carpets on Wednesday.  Linda settled in at her desk to deal with paperwork while I got out our Honda self-propelled lawn mower and finished cutting the grass around the house.  She then turned her attention to straightening up the house and cleaning the kitchen in anticipation of tomorrow’s dinner guests.

I puttered in the bus for a bit trying to figure out how the cabinet above the refrigerator was constructed and might, therefore, be deconstructed but did not solve that puzzle and turned my attention to our Cub Cadet 1000 Series (LT1040) lawn tractor.  The mower deck is badly out of adjustment, sitting very low on the right side even with the height adjustment lever in the highest position.  I wanted to remove it rather than try to adjust it so I could use the tractor to more easily tow the new utility cart around the yard.

I already had the PDF version of the manual on my iPad and studied the directions for removing the mower deck.  It appeared to be an easy procedure that could be done by one person but I had Linda help me.  Once it was out from under the tractor we cleaned it off as best we could.  It had what looked like many years of grass clippings packed into every nook and cranny.  One of the idler pulleys was broken, a wheel was loose and its bracket slightly bent, and the drive belt was in very bad shape.  If we ever want to use it again those things will have to be replaced and repaired.  The suspension mechanism on the tractor will also have to be adjusted.

The tractor is leaking something, either oil or hydraulic fluid, so now that the mower deck is out of the way I will try to identify the location of the leak.  The tractor came with the house when we bought it so it was “free” (in a sense).  It was not in the best of shape, so there is a limit to how much time, effort, and money we will put in to fixing it.  Besides, for now Keith mows the grass and we have the self-propelled Honda walk-behind mower for trimming up the yard, if needed, between major cuttings.

My next task was to get the trailer ball off of the back of the lawn tractor.  The ball had a 2-1/8″ hex base flange and the nut was 1-1/8″.  I did not have a 1-1/8″ socket or a 2-1/8″ open end wrench, so I went to Lowe’s in search of said items.  I found a deep 1-1/8″ impact socket with a 1/2″ drive but they did not have open end wrenches the size I needed so I bought a very large slip wrench.

The nut was initially coming off easily but then bound up.  Even with Linda’s help we could not turn it.  We own a torque wrench that is over 3′ long and will work up to ~800 lb-ft of torque, but it has a 3/4″ drive.  So we went back to Lowe’s to get a 1-1/8″, 3/4″ drive socket.  Fortunately they had one.  While we were there we also bought a 6 gallon pancake style Porter Cable air compressor and a new American Standard toilet seat for the upstairs hall bathroom.  The air compressor is smaller than the 15 gal Dewalt and may fit in the passenger side engine bay.  It has regulated output pressure to 150 PSI so it should be sufficient for inflating the front bus tires.  The toilet seat was the right shape but the wrong color, so it will get returned.

The torque wrench gave us enough leverage to move the nut a bit more but then it bound up again.  I suspect the threads are mangled.  We sprayed some WD-40 on it but it did not help.  I called Butch to see what suggestions he might have.  Heating it might help but I do not have anything that would get it hot enough fast enough.  Plus, the ball/nut are just below and behind the plastic gas tank; not a good place for intense heat.  Butch has an induction heater that would be ideal for this situation, but it is five hours away in north central Indiana.  I asked about a nut splitter but Butch said he has not had much luck with those.  He suggested a large pipe wrench.  They are self-tightening (when used correctly) and could grip the ball directly if needed.  I do not plan to reuse the ball so I do not care if it gets mangled, I just want it off the tractor.  If all else fails Butch said I can cut off the bolt with my Sawzall reciprocating saw.

I had planned to work on computer-based tasks today but was not in the humor by the time I was done working on physical tasks.  Linda made fajitas with sautéed onions and bell peppers, vegan gyro “meat”, and vegan sour cream.  Yum; that’s a keeper.

2015/05/21 (R) Cats, Cars, and Tenure

Linda got up around 6 AM and got ready to go to the bakery.  I was aware she was up but I slept in.  Once up I showered and dressed for the day.  I did not plan to work in the bus today so I did not put on my work clothes.  Instead I needed to catch up on blog entries and take the cats to a 2 PM appointment at Plaza Veterinary Hospital in Farmington, Michigan.

I was putting a few things back in the master bedroom closet and noticed that the air-conditioning return air grill was stuffed full of insulation.  We had found this in the other return air grills and removed it but we overlooked this one.  I removed the grill and then removed the insulation and threw it away.  There was a 1/2″ thick filter material stuffed up in the register behind the insulation.  I trimmed the filter to just fit inside the grill and reattached it to the ceiling.  Putting the rest of the house back together will take both of us so we will do that this evening.  Besides, we like to give the carpets as much time as possible to dry out.

I went out around 9:30 AM to fuel my car and get a cup of coffee at the co-located Dunkin’ Donuts.  Back home I put my floor mat back in front of my main computer station and settled in to check e-mail and work on my blog.  There was a new driver available for the NVIDIA GeForce GPU in my ASUS laptop, so I initiated the download.  AT&T was providing me with a 160 KB download speed and the 277 MB driver said it would take an hour to download.  No point tying up the Internet connection until the download finished so I used my iPad while I waited.

The driver downloaded a little sooner than predicted and then installed quickly.  When I finally opened my e-mail and had another 50 MB of stuff to download; a lot of it BCM related.  They are trying to wrap up the April 2015 issue and sent me several drafts since I last checked my e-mail.  I have not been 100% successful in getting folks attached to the magazine to transmit large files via Dropbox instead of attaching them to e-mails.

Tim Olsen from our GLCC chapter called yesterday to let me know he had registered for GLAMARAMA and wanted to park with the chapter.  I updated my spreadsheet and need to e-mail a few folks to clarify their intentions before giving an updated coach count to the rally parking coordinator.  As often happens, I did not have much time left to work on blog posts before I had to round up the cats and take them to the vet.

Both cats complained for most of the trip to Plaza Veterinary Hospital, but they are cats and that is what they do.  I weighed them on the scale in the lobby and gave the receptionist the pertinent facts concerning their health.  Once in the exam room I opened their carriers.  Juniper immediately came out and explored the room.  We were early and had to wait a while but Juniper stayed very busy.  Perhaps she was looking go for a way out.  Jasper did not leave his carrier.  Perhaps he figured he was safer staying in there.

Dr. Carron examined Juniper first since she was already out of her carrier.  The cats both got a clean bill of health other than some tartar on their teeth.  Dr. Carron did not suggest, however, that they needed to be cleaned at this time.  They each got vaccinated albeit for different things.  Jasper also had blood drawn.  He is just a month shy of being 11 years old and Dr. Carron likes to do annual blood work on cats 8 years of age and older.  Juniper is due for a 3-year rabies booster in December of this year but Jasper is not due again until sometime in 2017.  Besides rabies certificates we may need an International Health Certificate for each cat to get them into Mexico and/or back into the United States if we decide to make the trip to Puerto Penasco in February 2016.

I had just left Plaza Veterinary Hospital when Linda texted me that she was wrapping up at the bakery.  It was already after 3 PM at that point and traffic was thick and slow in the usual places.  I had a nice QSO with Mike (W8XH) on the South Lyon 2 meter ham radio repeater for the last six miles of my trip.  He and several other club members bought Yaesu digital radios at the Dayton Hamvention to use with the new Yaesu Fusion 2m repeater that five of them bought from Yaesu for a special promotional price of only $500.

I got home around 4 PM and replied to Linda’s TXT message.  I got the cat carriers inside and set them free.  There was no hesitation about leaving the carriers this time.  Linda got home around 5 PM, 90 minutes after she left the bakery, and I filled her in on the cats’ veterinary appointments.  While we were chatting we got an e-mail from our son letting us know that Shawn’s tenure at the University of Michigan had been approved by the Board of Regents at their meeting today.  We were understandably pleased (and relieved) to finally receive this news and texted back our congratulations.  Shawna sent back a cell phone photo of themselves celebrating at a local Ann Arbor establishment.  They looked very happy.

Most car dealerships in this market are open until 9 PM on Mondays and Thursdays, and neither of us was ready for dinner yet, so we paid a visit to Champion Chevrolet on Grand River Avenue between Brighton and Howell.  We were greeted by Ken, but he only dealt in used cars and handed us off to Dan Danaher.  He had a Chevy Colorado on the lot so we checked it out.  It was not the 4-door crew cab Z71 off-road model, but it did have 4-wheel drive.  We climbed in/out of the front and back seats and played with the tailgate.  The front seats were fine but I could not sit in the back without the driver seat being all the way forward.  The 4-door Crew Cab adds about 7″ of rear leg room but it would still be tight.  That is one of the tradeoffs with mid-size trucks.  The front seats fit us nicely but this is not a truck for tall and/or large people IMHO.  The Z71 off-road version may sit slightly higher but we should still be able to get in/out without needing an accessory step or running board.

The MSRP for the truck we saw was just over $30,000 and overall felt very similar to the Nissan Frontier, nice but not luxurious.  In other respects, however, the trucks were very different.  The Colorado 4×4 models have a transfer case and can be towed four wheels down with an automatic transmission.  We liked the Frontier but it can only be towed 4-down with the manual transmission and for that reason alone is not a viable alternative for us.

Dan gave us a brochure on the Colorado and made a few notes on what we are looking for.  We would obviously like to see the 4-door crew cab and drive the Z71 4×4 off-road model before deciding to buy one.  He said he would call if/when he had those available for us to see and test drive.  If we ordered by the end of the month we would get a 2015 model but it would take 8 – 10 weeks to arrive.  Starting June 1st orders will be for a 2016 model and still take 8 – 10 weeks for delivery.  Recent history suggests a 0.5% to 1.0% price increase for the new model year.  We do not plan to order a new car before the end of May and a 1% price increase would not motivate us to change our minds about that.

On our way back to our car we took a quick glance at the Camaro sitting outside the showroom door.  If we were buying a nostalgia car thus would be it.  Linda’s first car, purchased before we were married, was a used 1967 Chevy Camaro convertible.  It was white with a red interior and had a 327 cubic inch V8 under the hood.  No emissions controls in those days, just raw power and $0.35/gal gasoline.

We drove to Panera in Brighton and had black bean soup and Mediterranean veggie sandwiches for dinner.  By the time we got home we were ready to relax.  First we took the spacers out from under the living room furniture, so we had someplace to sit, and put a few items back where they normally go.  I opened one of the bottles of Malvasia Bianca white wine from the Heart of the Dessert (Eagle Ranch) winery in Alamogordo, New Mexico and we celebrated our daughter-in-law’s attainment of tenure.  It’s been a good year for our son and his family and it is nice to see things finally falling into place for them.  The wine was very similar to the late harvest Rieslings we get from Michigan’s Leelanau peninsula; very sweet and thus a good cocktail or dessert wine.  We watched the final episode from season 1 of A Touch of Frost before turning in for the evening.

 

2015/05/20 (W) Duraclean

Today was carpet cleaning day.  Linda had been picking up the house for the last week getting ready but we still had a lot of last minute stuff to move, including the cats.  We put them in the library along with their food, water, and litter tray.  We also moved their cat “tree” out there.  They were confused and unhappy about the arrangement but we figured it would be less stressful for them than constantly trying to find new places to hide as Jack moved about the house with his big, noisy carpet cleaning machine.

Jack Hoskins runs a one-man carpet and upholstery cleaning business named Duraclean.  Located in Farmington Hills near our previous house, Jack took care of our cleaning needs for the last years we were there.  When we bought the house in Oceola Township we had him clean all of carpets after the painters were done but before we moved anything into the house.  We did not have him clean the carpets in 2014 but had him out today to do all of them, including my office / ham shack, which was under construction when he was here in 2013.  Jack arrived right on time at 8:30 AM, walked through the job with both of us, and then spent most of the rest of the day cleaning.  Jack works hard and always does a nice job.

Once Jack was squared away we bagged up the pieces of carpet and pad from the bus that would not fit in the trash container and took the container and the bags to the curb.”  (We live on a dirt road and don’t really have curbs, but it doesn’t sound right to say we took the trash to the edge of the street.)  We then unloaded the box from my car with the garden trailer I bought at Lowe’s yesterday, opened it, removed all of the parts, and assembled it.  Linda broke down the cardboard packaging, gathered up some other cardboard and our usual recyclables, and we loaded them into my car to take to Recycle Livingston later.

Keith Kish (Kish Lawn Care) showed up mid-morning to finish cutting our grass.  His Hustler zero-turn riding mower was not repaired yet but he borrowed an articulated stand-behind mower from his son.  Something failed in the hydraulic pump on his Hustler and blew a 1 inch hole in it.  The cost to replace the pump and put the mower back in service will be significant but his business is primarily based on that machine.

I mostly puttered in the bus while Jack worked in the house and Keith worked in the yard.  Linda eventually went to the recycling center and then stopped at Lowe’s to buy some plants, pots, and potting soil.  She is going to try growing some tomatoes, which are one of her favorite summer things, and some herbs.  She moved the hummingbird feeder away from our deck and hung it on a stand in the shade of a tree we can see from our outdoor table.

I boxed up the ceramic tile pieces that were still spread out on the floor of the bus and moved the box to the garage.  That stuff is heavy!  I turned on the chassis batteries so I could move the driver’s seat forward to get access to the seatbelt attachment bolts.  I unbolted the two seatbelt straps and removed them so I could remove the last pieces of the old white carpet from behind and next to the seat.  I then reattached the seatbelts, moved the driver’s chair back, and turned off the chassis batteries.  Refinishing the area around the driver’s seat will be its own special challenge and may not get done with tile as I may need something more flexible.  It will not, however, be heavy carpet intended for use on floors.

My next task was to remove the flexible duct adapters from the HVAC chases.  One of them has an AC electrical cable passing through it, so I will have to undo the cable from a nearby outlet box to get the adapter free.  While I was working on these relatively minor tasks I was also thinking about furniture options.  It finally dawned on me that we did not have buy an expensive custom made sofa-bed or use chairs instead and try to figure out how to finish that area.  I could build a simple but very effective sofa out of wood and have a bottom and back cushion made to the exact dimensions we need using a fabric of our choice.  That opened up the possibility of the fabric matching whatever we get on the chairs.  The seat cushion could double as a bed for one person, with the back cushion removed, and the seat could hinge up to reveal a large storage area rather than dealing with the complexity of a drawer on suspension glides.  The HVAC supply and return could also be easily be accommodated and I would not have to figure out how to finish the chase or conceal all of the wires that run along the floor in front of the chase.  I discussed the idea with Linda and she liked it.

I moved the dinette table up front and we considered its size and placement relative to the seating we would like to use on the passenger side of the coach across from the sofa. We agreed that one of the things we would do while we are at the GLAMARAMA rally is visit Lambright Furniture in Shipshewana and Bradd & Hall in Elkhart.  We also discussed buying a carpet remnant and trimming it to fit in the front part of the bus while we attend the GLAMARAMA rally.

I called Butch to see how his cataract surgery went on Monday.  Apparently it went well, at least his world is suddenly brighter and more colorful.  We talked through various bus projects, including approaches I might take to get a flat, level underlayment for the floor tile.

Keith wrapped up his work, collected his payment, and moved on to Sean’s yard just north of ours.  I suggested that he come every week instead of every other week as long as the grass is growing as quickly as it has the last two weeks and he agreed.  Keith normally does a nice job with our lawn but was now a couple of days behind schedule and trying to catch up using equipment that was not his.  He did not want to drive the stand-behind mower over or near gravel, so some areas along the pull-through driveway did not get cut.  He was also not able to work around obstructions as tightly as he can with his zero-turn mower, and appeared to not overlap some rows.

Jack wrapped up his work not long after Keith and took off for another short job before calling it a day.  I let the cats back into the house and then decided to get out our self-propelled Honda walk-behind mower and trim up the yard in front of the house and some of the areas Keith had missed.  It took a while to get the mower started but I eventually did.

Linda made a nice salad and baked an Amy’s pizza for dinner.  It was 6:30 PM by the time we finished eating.  Linda gathered up the plastic wine glasses and toilet paper holders she bought yesterday at IKEA and we drove to the store in Canton to return them.  The glasses were too tall to fit in our wine glass display case in the bus and the toilet paper holders did not fit in the places we needed them to go in the house.  While we were at the store we looked at their selection of refrigerators, none of which will fit through the entrance door on the bus, and just wandered through looking for ideas.  We were not up that long after we got home, it having been a long but productive day.

 

2015/05/19 (T) More Ceramic Tile

We were up by 7:30 AM.  A cold front moved through here last night with gusty winds and much cooler temperatures.  The overnight low was 49 degrees F so I closed up the house and made coffee while Linda got ready for her girl’s day out with our daughter, Meghan.  We had toast for breakfast and enjoyed our coffee in the living room to the warmth and glow of the gas fireplace logs.  We both agree that this was a good purchase.

Linda left round 9 AM.  I put a load of towels in the washing machine and then called Kate at work.  I left a message asking her if she would check with Brian about an X-Plan PIN.  I then returned a phone call from Kelly at Brighton Ford and had a nice chat about the F-150.  She worked hard to provide me with additional pricing information as a follow-up to our meeting with Frank on Saturday.  She was able to get the price on an in-stock $46,000 F-150 XLT 4×4 off-road down to $40,000 (with X-Plan but before tax, title, and destination charges).  Six grand is a significant difference, and the F-150 is a nice truck, but forty grand is way more than we were thinking about spending on a vehicle.

Kate called me back while I was on the phone and I returned the call as soon as I finished talking to Kelly.  Kate had already checked with Brian and he was willing to get us a PIN.  One of the odd things about shopping for vehicles in Michigan, especially the Detroit area, is that Ford, GM, and Chrysler all have several “plans” that provide non-negotiable pricing for employees, vendors, and family/friends.  These plans are so widely available that dealers practically assume that you have access to one of them.  I think Ford is making good vehicles and the availability of X-Plan pricing certainly makes them that much more attractive.  Unfortunately they are not selling the mid-sized Ranger in North America, just Europe and Australia.  Mid-size trucks are more our size.

View of kitchen floor looking toward rear from living room.  Black Ceramic tile has been removed to just past the refrigerator.

View of kitchen floor looking toward rear from living room. Black Ceramic tile has been removed to just past the refrigerator.

I moved the towels to the dryer and then got to work in the bus.  The high temperature today was forecast to be 57 degrees F so I figured it would be a bit more comfortable working on the ceramic tile removal.  I opened all three roof vents and set the front and middle fans on exhaust.  With the front door open there was plenty of airflow.  I put on my Tyvek jumpsuit and gloves and carried the unbroken tiles I got out the last couple of days to the garage for safe keeping.  I then put the pieces of the ones I broke in a laundry basket to get them off the floor.  They will eventually go in small boxes for disposal.

With all of that material out of the way I vacuumed up the small pieces and tiny shards as best I could along with carpet pad staples and tiny pieces of carpet, pad, and wood.  I then removed the small base molding from the hallway which turned out to be more difficult than I expected.  I put on my safety glasses and face shield, grabbed my floor chisel and 3-pound sledge hammer, and continued removing tiles from the floor.

Getting the tiles out of the hallway was more difficult than the kitchen/dining area.  The narrow hallway limited the directions from which I could position and strike the floor chisel and the result was a much higher percentage of broken tiles.  I did a little better as I moved into the area in front of the bathroom and bedroom doors and then into the bathroom.  I stopped when I got to the tiles under the toilet.  I will have to remove the toilet to get those tiles out and that is not going to happen until after the GLAMARAMA rally.  I do not to remove and reinstall the toilet more than once so it will not get reinstalled until after the new floor is in place.

It was 1:30 PM when I quit chiseling for the day and I left the cleanup for next time.  I got cleaned up and went out to take care of errands.  I picked up our freshly roasted coffee beans from Teeko’s, had French fries at McDonald’s for lunch, and then went to Lowe’s.  I was looking for some sort of grinder to grind down the thinset mortar that is adhered to the plywood subfloor but did not buy one.  I bought a wheeled cart to pull behind our lawn tractor instead.

By the time I got home Linda had returned from her girl’s day out.  She showed me all of the things she bought at Ikea, including four long-stem plastic wine glasses.  We took them out to the bus but they would not fit in our wine glass holder.  She also saw an 18 cubic foot refrigerator (Frostig) that might fit in our fridge alcove.

I turned on the gas fireplace logs, made some tea, and put a second load of towels in the washer.  We sat in the living room researching the IKEA refrigerators on our iPads to the warmth of the fireplace.  I had searched for roof access hatches this morning and found several places that sell them online so I showed that to Linda.  I need to call Pat at Apex Roofing and discuss thus approach.

For dinner Linda made very nice salads with raspberries and walnuts.  She then heated up the leftover risotto and lightly sautéed baby carrots as a side dish.  We sat in the living room after dinner for a while and then watched the 1st and 2nd episodes of season 1 of A Touch of Frost.  Although not a BBC production, it was very engaging.

 

2015/05/18 (M) Ceramic Floor Tile

I plugged my laptop in, started it, put a load of laundry in the washer, and then made our morning coffee.  We are finally running out of the six pounds of beans we had shipped to us in Quartzsite, Arizona at the end of February and will need to get more from Teeko’s sometime soon.  While we were enjoying our morning coffee I pulled up some information online on how to remove ceramic floor tiles.  What I found was a bit discouraging but what was clear was the need for certain equipment and safety precautions.  Linda needed to return the Sherlock DVDs to the Howell Library today so we went on an errand run to Howell.

At the Library we did some more vehicle research in the April 2015 Consumer Reports.  The Chevy Colorado / GMC Canyon mid-size pickup truck was Motor Trend Magazine’s 2015 Truck of the Year, but being a new model CR had no data on predicted repairs or user satisfaction.  Ditto for the 2015 Ford F-150 and its 700 pound lighter aluminum body.  We liked the size of the Nissan Frontier but the manual transmission required for four-flat towing behind our bus will keep us from buying one.  We have not looked at the Colorado/Canyon yet but it is similar in size to the Nissan Frontier.  CR gave good marks to most of the Subaru models and the Forrester was one of their top picks.  Years ago we wanted a Subaru Outback but they were always just slightly too expensive.  Compared to the vehicles we have been looking at recently, the Subaru’s are less expensive.  Right now, however, we are focused on the utility of a 4-door pickup truck.  Yeehaa!

We checked out the DVDs for Season 1 of the British detective series A Touch of Frost. It is not a BBC production so we will see how we like it.  We stopped at D-R Electric Appliance Sales and Service just up the street to look at refrigerators.  We bought our new gas range/stove from them last September.  They had a 16 cubic foot top-freezer GE (GTE16GTHxx) whose dimensions looked like they might work.  With the doors removed it was under 26″ deep so it would fit through the door of the bus sideways.  It is available in white, black, and stainless steel.  Kurt Richards helped us and said he would search the units he can order if I give him the dimensions of our enclosure.  D-R Electric Appliance is not a dealer for Fisher and Paykel so we would have to get one of those through Lowe’s if we decide to go that route.

Lowe’s was our next stop.  Linda looked at plants but decided not to buy any on this trip.  We picked up a couple of 40 W appliance bulbs for the microwave as one of the two bulbs that lights the top of the range burned out the other day.  I picked up a new face shield, dust masks, a Tyvek jump suit, a floor chisel with shield, and a 3-pound short-handle sledge hammer.

Teeko’s Coffee and Tea is kitty corner from the Lowe’s/Walmart shopping center so we stopped there and ordered one pound each of our three half-caffe blends: Sweet Seattle Dreams (Seattle Blend + Sweet Dreams decaf blend); Ethiopian Yirgacheffe, and Cafe Europe.  Jeff wasn’t there but his mom (Mary) took our order and his dad (John) was starting to put together the roast when we left.  I will pick the beans up tomorrow afternoon.

By the time we got back to the house it was time for lunch so Linda fixed grilled “cheese” sandwiches.  She is still using up the non-dairy cheddar cheese we bought a while back.  It is not Daiya brand and it does not taste like cheddar.  Actually it doesn’t taste like much of anything.  Keith was there mowing the yard as we thought he might be.

Me in the Tyvek jumpsuit removing the black ceramic floor tiles.  (Photo by Linda.)

Me in the Tyvek jumpsuit removing the black ceramic floor tiles. (Photo by Linda.)

[p1 L] It was once again 1 PM by the time I got to work in the bus removing the black ceramic floor tiles.  I suited up and Linda took a couple of photos.  I was over dressed under the Tyvek jumpsuit so I changed into something cooler.  Even then it was a hot, sweaty afternoon.  Houses get wrapped in Tyvek to prevent air movement between the interior and exterior, so a jumpsuit does not really breathe.  Neither did I with the dust mask in place so I settled for my wrap-around safety glasses, full face shield, Tyvek jumpsuit, and leather gloves.

I had hoped to get most of the floor tiles out intact.  They are nice 12″x12″ black ceramic with a hint of silver flake in them and they were probably expensive when they were installed in the bus in 1990-91.  They were installed just the way they would be in a house, on a troweled bed of thin set mortar, with one difference; they were set directly on the factory original plywood subfloor of the bus rather than on an underpayment layer.  The information I found online this morning indicated that removing tiles installed this way might require removal and replacement of the subfloor.  That is not an option in the bus so I was curious, and a bit nervous, to see how they would come out.  The other caution was to NOT smash them with a sledge hammer to break them into smaller pieces for easier removal, even though there are lots of websites that tell you to do this.  Ceramic tiles with a high quartz content will shatter sending tiny razor sharp shards flying in every direction; thus the Tyvek jumpsuit, face shield, and gloves.

I took a few tiles out yesterday and most of them came out intact.  The first few today, however, came out in two or more pieces.  Either way I was committed to removing them, so I kept at it.  I developed a technique that seemed to work more often than not.  I would chisel along one free edge and when I got the first indication that the tile was loosening I would switch to an adjacent free edge (if there was on).  Proceeding in this manner I was able to work my way down a row getting most of the tiles loose in one piece.  The tiles were laid in rows with aligned joints running across the coach and staggered joints running the length of the coach.  Thus the rows were short and easier to work on, my work was interrupted by something I will describe next, but I returned to the task and removed the tiles from the entire kitchen/dining area back past the refrigerator.  This part of the deconstruction will take a while but based on the progress I made today it will not take as long as I thought it might, all things being equal (which they never are).

While I was working Keith came to the bus in need of some assistance.  His zero-turn Hustler mower had quit moving and started smoking and was stranded in the northeast corner of our yard.  This particular mower is all hydraulic; the gasoline engine simply turns a hydraulic pump and fluid pressure is used to drive/steer the mower and turn the cutting blades.  Keith had oil on his arms and needed some paper towels.  He suspected a hydraulic hose had failed and the smoke was from the hot oil.  The immediate problem, however, was to get the mower back into its trailer some 400 feet away.

Keith got the mower stuck once last year in wet/soft soil along the north property line.  I was able to use our Cub Cadet lawn tractor to pull him out then so we figured we would try that again.  Just this past weekend I had charged the starting battery and moved the lawn tractor outside to make room in the garage for the furniture we took out of the bus.  It complained for a moment and then started up.  Keith had tow straps so I drove it over to his mower and we hooked the straps to the trailer ball on the back of the lawn tractor.

Keith’s mower weighs 1,200 pounds.  I doubt that our Cub Cadet weighs half that much even with me sitting on it.  I was able to pull it part way across a level-to-slightly-downhill part of the yard but once we hit an upslope my back tires started to slip.  Keith went to get Linda because the lawn tractor would stop if I got off and I was too far from the house to conveniently jump start it.  I continued to drive while Linda helped Keith push although we should have figured out a way to trade places.  It was very hard work for them but the Cub Cadet proved to be “the little engine that could” and we got the mower down by the third culvert (where the driveway for the barn is supposed to go).  We chose that location because it was downhill and close to Keith’s truck and trailer.

Keith’s trailer has a large rear ramp and pointed front like the bow of a boat with smaller ramp that opens at an angle on the driver’s side.  I tried pulling his mower up the rear ramp into the trailer.  The plan was for me to drive out via the front ramp.  Unfortunately the Cub Cadet could not maintain enough traction.  We unhooked it and I drove out the front and put it back in its parking spot.  I got a pair of wheel chocks from our bus and placed them in front of the trailer wheels while Keith unhooked the trailer from his truck.  He then attached the tow straps to the trailer ball on his truck, brought them I through the front ramp opening just off the nose of the trailer, and tied them around the front frame of the mower.  It took a few tries, and one repositioning of the strap on the mower, but Linda and I were finally able to guide it into the trailer while Keith pulled it up the ramp with his truck.

Linda got water for all of us while I helped Keith reload the trailer.  Keith is retired and doesn’t mow lawns for the money.  He’s a good guy who charges us a very reasonable price for the service he provides and we were glad to help him get his mower back in his trailer so he could go home, take a shower, and have a cold beer.  We should have done the same, but he probably took the trailer someplace to have the mower fixed and we both went back to what we were working on.

By 4:30 PM I was too warm and too sweaty to remove any more tiles.  I was also at the point where I was starting down the hallway and needed to remove some quarter round base molding that was installed over the edge of the tiles.  Tomorrow I plan to work earlier in the day when it is cooler, but I say that every day.

Linda cooked most of our dinner on the outdoor grill using the grilling mat to cook potatoes, zucchini, and Japanese eggplant that had been sliced in half lengthwise.  She also made Farro and served it as a side dish.  I think that is the first time she has done that; she normally uses it as an ingredient.  While the vegetables were grilling we sat quietly on the back deck enjoying the last of the first bottle of 2013 Egri Merlot we bought at Whole Foods last week.  The robin eggs in the nest under our deck have hatched so we are trying not to disturb the parents too much.  They need to fly back and forth constantly to feed their young but are understandably weary of us.

I had a call after dinner from Darin Hathaway, the Aqua-Hot technician who worked on our unit in June 2014.  It appeared to have an intermittent ignition coil then and would not fire at all when I had the bus a Butch and Fonda’s in the fall.  Butch and I replaced the burner in October 2014 with the one I bought from him.  That burner was running rich until I replaced the blower bearings while we were in Quartzsite.  Old bearings = slow fan speed = inadequate air supply = rich air:fuel ratio = inefficient combustion and sooty/smoky exhaust.  I still need to repair the original one but for now that is not a priority.  Darin said he could bench test/repair it but Lloyd DeGerald has the same capabilities.

Butch had eye surgery this morning at a clinic in Indianapolis.  I will call tomorrow and see how he is doing.  Linda is having a girl’s day out with our daughter tomorrow, Jack will be here to clean the carpets on Wednesday, Linda has to go to the bakery on Thursday, and I have to take the cats to the veterinarian Thursday afternoon.  I also expect Keith will return sometime this week to finish mowing the grass.  Saturday morning will be our usual ham radio club breakfast and Linda invited Steve and Karen for dinner on Saturday.  Somewhere in there we will probably go look at the Chevy Colorado (GMC Canyon), Toyota Tacoma, and the Subaru Forrester and Outback.  In between all of that I will be doing a load of laundry or two, working on the bus floor, and trying to figure out refrigerators, furniture, and wall treatments, so it is shaping up to be a busy week.  Heck, it’s going to be a busy summer, and maybe a busy fall.

 

2015/05/17 (N) A Tale of Two Sittings.

Our day had two parts.  Part 1 was at home and Part 2 was in Ann Arbor.  The first part started with our normal morning routine:  coffee, breakfast, and iPads.  I put a load of laundry in the washing machine and then checked/replied to e-mails, which I had not done for a couple of days.  We then got busy on tasks and chores.

Linda’s focus for the first part of the day was cleaning and straightening up the house in advance of Jack coming on Wednesday to clean all of the carpets.  Jack Hoskins runs Duraclean as a one-man business and has done our carpets and upholstery for a while.  My focus was the bus and my first task was to carry all of the “stuff” that came out from under the bed into the house.  All of that stuff then went various places downstairs, but not on the carpets.  By the time we finished the morning chores it was almost 1 PM so we had a few pretzels with hummus for lunch.

I only worked in the bus for a few of hours but I got some things done.  First I broke all of the carpet tack strips into pieces small enough to fit in a trash can.  Linda then helped me get the Shop-Vac into the bus and I vacuumed up most of the loose debris.  I had not yet removed the carpet from the right wall of the entry stairs so I did that next.  To remove it I had to take a light fixture loose and remove a piece of upholstered trim from around the bottom door hinge.  The two door hinges have thick rubber covers and after I removed the carpet I pulled back the rubber cover of the lower hinge and measured the width of the opening from the left edge of the door frame to the hinge.  It looks like we have 27″ to work with if needed.  I put the trim back on and re-installed the light fixture.  I then spent the rest of my time pulling carpet pad staples and carpet strip nails out of the plywood subfloor.  Removing the staples was tedious but it was part of what had to be done.

I quit working around 3:30 PM and took a shower and then relaxed for a bit while Linda was busy in the kitchen making a mushroom and power greens risotto.  She often uses barley in her risottos but this time she used Arborio rice which is the type normally used to make risotto.  I really like her barley risotto, but the rice version was outstanding.  After our early dinner I set an alarm on my iPad and we both took short naps.  We up at 5:30 PM and I gathered up my laptop computer, digital camera, and iPad while Linda closed up the house and got her iPad.  At 5:45 PM we were off to Ann Arbor to entertain (and supervise) grand-daughter Madeline while her parents went to a friend’s house for dinner.  We stopped at Whole Foods for some Almond Dream non-dairy ice cream.

Madeline was very excited to see us and showed us her house and back yard.  We went for a short stroll with her in her tricycle and then again in her car.  She had a Little Tykes kitchen playset on the back porch, just outside the real house kitchen, and she made “coffee and tea” for us to enjoy on the veranda.  Brendan has been working on the back yard and slowly but surely getting it into shape.  Yards are a lot of work.

Madeline was a little teary when Brendan and Shawna left but she settled down quickly as Linda got her engaged with some of her puzzles.  I sat on the floor with her and helped build the giant animal puzzles.  (The puzzles are large and have large pieces, they are not puzzles of giant animals, although giraffes are rather large.)  We learned that lions are nice but we do not pet “dinos” (alligators).

Linda prepared a bedtime snack for Madeline of grapes, strawberries, pineapple, and crackers and we had a few grapes too.  By 8 PM Madeline was tired and Linda got her ready for bed, which is a whole routine unto itself.  While they did that I got out my computer and set it up.  I checked my e-mail and then copied the photos I had taken since May 1st from my camera to my laptop.  I had photos of the work on the bus from four separate days so I selected a few photos from each day and post-processed them.  I then copied my draft blog posts for May 10 through 17 from my e-mail to separate Word documents and edited all of them.

I was spell checking my blog post drafts when Brendan and Shawna got home around 10:20 PM.  I shut down my computer and we visited while I packed up.  By 10:45 PM we were ready to be on our way.  We drove down in Linda’s car so she drove us home.  It rained several times between 8:30 and 10 PM but riding home we had clear skies in some directions (we could see stars) and lightning in other directions.  The roads were mostly wet and we drove in and out of a few showers.  We were hoping the rain would hold off as we have had a wet week and Keith is supposed to cut our grass tomorrow.

 

2015/05/16 (S) Trucks and Buses

To paraphrase, “If it’s Saturday we must be in South Lyon” and that was, indeed, the case.  Most of the regulars were missing from our weekly breakfast gathering of the South Lyon Area Amateur Radio Club (SLAARC), but six of us showed up and had a great conversation.  By the time we headed towards home it was starting to rain lightly.

We stopped at Brighton Honda to get some information on the Honda Ridgeline pickup truck.  The salesman was very nice, but unfortunately Honda has stopped making the Ridgeline.  They are reintroducing it in the fall of 2016, but we will likely make a decision about a new car/truck sooner than that.  There are still a few in stock around the country but we already have an orphaned Honda Element.  We like the car, but would be happier if they were still being made.  In this case, however, it was a moot point as the Ridgeline is not towable four wheels down.

We drove next door to Brighton Ford to look at F-150 pickup trucks.  We were assisted by Frank Stapleton and he was easy to work with.  He insisted that we meet his new car sales manager, Eric Wilkinson, before we left.  We felt that was unnecessary at this stage in the process, but he also seemed like a nice enough guy.  The entry level XL 2-door may be reasonably priced (not really, but what car is?), but the slightly nicer XLT 4-door short bed with 4-wheel drive, towing package, and off-road package looks like it would price out at $45,000 give or take three grand.  Without X -Plan pricing that is simply not going to happen, and even with X-Plan pricing it is not a sure thing.  Frank really wanted us to test drive one but given the rainy weather we were not in the humor to do that today.

The F-150 is a nice truck, nicer in fact than many cars, and perhaps nicer than a pickup truck needs to be or should be.  On the plus side it certainly has ground clearance, but on the negative side (for us) it is also BIG.  The back seat room in the four door body style is cavernous, made larger by fold up seats, and that would be very useful for us when traveling in the bus.  Between the back seat and the bed we could store a LOT of stuff.  It has well-placed handles by all four doors, and it is a god thing as we both needed them, along with the running boards, to get in and out.  There are several engine options including the 2.7 L and 3.5 L Eco-Boost models, both of which feature twin turbochargers.  These are high-tech engines, with incredible power and torque and decent fuel economy. I liked the sound of that, but unfortunately that technology comes at a significant price premium.  Interestingly, Ford is using an aluminum body and the truck weighs in at about 4,700 pounds.  Our Honda Element weighs over 4,000 pounds and it is not nearly as big as the F-150.  How well the aluminum will hold up is unknown.

We were almost home when we decided to keep driving and visit LaFontaine Nissan.  While not as convenient as the Brighton dealerships, it is only 15 miles from our house, 13 of those headed east on M-59.  Linda checked their hours on her phone and they were open until 4 PM.  The purpose of our visit was to look at the Nissan Frontier pickup truck and the Nissan Xterra SUV, both of which Edmonds.com suggested were viable off-road alternatives to a Jeep Wrangler while Consumer Reports indicated they were more reliable and more practical than a Jeep Wrangler.  Bobby Lundwall, the Commercial Manager, assisted us and we met the General Sales Manager, Don Poley, before we left.  Bobby was very helpful and brought a Frontier and Xterra around front for us to see.  Again, we were not interested in test driving one at this stage, especially in the rain.

The Nissan Frontier pickup has an available 4-door, 4-wheel drive, short bed model.  It is considered a mid-size truck and is noticeably smaller than a Ford F-150 in every way.  The Pro-4X off-road version has 10.1 inches of ground clearance at the differential, which should be adequate for our needs.  It has a transfer case but is only towable four wheels down with the 6-speed manual transmission.  We looked at the Xterra but found it harder to get in and out of, especially the back seat.  It is taller than the Frontier and after due consideration we agreed that we were not really in the market for an SUV.

The Frontier does not have the bewildering array of options that the F-150 has and would be more suitable for the 95% of our driving that is on local paved and dirt roads.  It would be perfectly adequate for hauling materials from Lowe’s to the house and has an available tent option for camping.  We presume that aftermarket bed covers, canopies, and even small truck campers are available but we would check on that before buying one.  Ditto for Blue Ox base plates and the ability to install an SMI Air Force One auxiliary braking system.

We did not test drive one, but it was easy to get in and out of, and comfortable to sit in, at least in the front seats.  It weighs about 4,500 pounds, basically that same as the much larger F-150.  The only negatives at this point are the manual transmission and lack of choice on interior fabric; the Pro-4X only comes with a charcoal interior, either cloth or leather.  The bottom line was that it is probably a better fit for us than a Jeep Wrangler or a Ford F-150 and could be acquired for under $35,000 equipped the way we want it.  Nissan also has zero percent financing available at the monument, although that is often in place of other incentives.  The fact that it requires a manual transmission to be towed four wheels down, however, probably knocks it out of contention.

Storage compartment under the lift-up bed platform.  The two boxes concealed and protectd 4" flexible HVAC ducts.

Storage compartment under the lift-up bed platform. The two boxes concealed and protectd 4″ flexible HVAC ducts.

Once we got home we had a light lunch.  I then changed into my work clothes and got back to work deconstructing the inside of our motorcoach.  (I like the term deconstructing as I think it is more descriptive of what I am doing that demolishing or even disassembling.)  My goal for today was to finish removing all of the carpet and all of the carpet tack strips.  I accomplished all of that except for a piece of carpet on the wall behind the driver’s seat and a piece on the front wall of the entry stairwell.  My first task, however, was to cut a short slot in the 3/8″ plywood filler that was under the dinette in order to free an AC electrical cable that ran through it and then through the floor.

Getting the carpet off of the sides of the bed platform was interesting.  There was a piece of wood trim installed along the top edge of the side of the bed base facing the front of the bus and just under the plywood bed platform.  The trim strip is rabbited on the underside and conceals a 12VDC strip light that is tied in with toekick lights in the bathroom and the floor lights in the hallway.  The power for the lights comes from inside the bed base through a small hole in the plywood and carpet.  The trim strip also appeared to be installed over the carpet and needed to be removed to get the carpet loose along the top.

Under-bed storage compartment with bot HVAC ducts uncovered.

Under-bed storage compartment with bot HVAC ducts uncovered.

There was also an adjustable HVAC louver on each side of the bed.  The louvers were installed from the outside and had flexible heater ducts slipped over them on the inside and secured with screws.  The flexible ducts were in the storage area under the bed and were covered by wood boxes to protect them.  The boxes, in turn, were carpeted to match the rest of the storage compartment.  To disconnect the wiring for the strip light and remove the boxes I had to first empty out all of the stuff stored under the bed so I could get in there to work.  The bed platform is hinged about one foot from the head end and the foot end lifts up, supported by two gas struts, so there was plenty of room to work once I emptied it out.

I have disassembled enough of the bus at this point to have some idea of how the conversion was built.  The cover “boxes” for the flexible ducts were actually half-boxes with a long side and top and one small end.  They were installed into a corner using a cleat screwed to the floor that the bottom edge of the long side was then screwed into.  There was a similar arrangement to catch the free edge of the top and it was screwed to the inside wall of the platform base.  All of these screws were put in through the carpet that covered the boxes and were essentially invisible so I had to find the screw heads by touch and back them out.

The area just forward of the bed base with the bed platform raised and facing the driver side of the bus.

The area just forward of the bed base with the bed platform raised and facing the driver side of the bus.

Once I got the protective boxes loose I discovered that the floor and wall were also carpeted.  There was a small bump out in each rear corner that served as wiring chases for AC electrical outlets on each side of the bed, and these bump outs were carpeted.  It seemed clear to me that the HVAC ducts, which are part of the OTR HVAC system, may have originally been installed directly into the HVAC chase outside the bed base and later repositioned to the sides of the bed thus requiring the louvers, flexible ducts, and cover boxes.  They also greatly reduced the available storage space under the bed.

The OTR HVAC chase runs along the floor-wall junctions on both sides of the bus for most of the length of the coach and a 12″ section of it is accessible on either side of the bed.  Removing the two flexible ducts, sealing up the openings, and installing the louvers outside the bed platform will free up additional storage space under the bed which is a good thing as we can always use for storage space.  That’s a nice bonus but adds some additional work to the remodeling project.  Such is the nature of remodeling; you never really know what you have until you have completed the deconstruction phase.

The aft side of the bed base.  There is not a lot of room to work in here so I will remove the bed platform when I install the new tile floor.  I plan to use the same tile on the sides of the bed base.

The aft side of the bed base. There is not a lot of room to work in here so I will remove the bed platform when I install the new tile floor. I plan to use the same tile on the sides of the bed base.

It was overcast all day with humidity near 100% and rained off and on into the evening.  It was also warm so I kept opening the roof vents and running the fans to make it more comfortable in the coach, but every time I did it started raining shortly thereafter.  When I was done working on the bus for the day I moved the ten concrete blocks that had been supporting the propane tank for the whole house generator and pulled up the utility marker flags for the underground gas line to our meter.  Keith will be here to cut the grass this coming week and I want him to be able mow these areas.

Linda spent the afternoon thoroughly cleaning the kitchen.  She also prepared a sugar-water solution, filled the hummingbird feeder we bought at Lowe’s the other day, and hung it off the railing of our rear deck.  A hummingbird found it almost immediately which was very cool.  For dinner Linda made pan-grilled tofu slices with caramelized onions and sweet BBQ sauce served on tortillas.  She also sautéed fresh broccoli and sliced up some fresh strawberries and pineapple.

After dinner Linda went to the Edmonds.com website to see if she could get a better feel for dealer cost and Fair Market Value for the Ford F-150 and Nissan Frontier.  While she was at it she looked up the Chevy Colorado (GMC Canyon), and Toyota Tacoma.  The Chevy Colorado was Motor Trend Magazine’s 2015 Truck of the Year.  Both the Colorad0/Canyon and Tacoma are mid-sized pickup trucks.  Toyota’s full-size pickup is the Tundra.

Brendan called while we out to see if Linda could sit with Madeline tomorrow night while he and Shawna had dinner with their friend Jorge.  Depending how the day goes tomorrow I may go to Ann Arbor with her.  We had two episodes of Sherlock left to watch and the DVDs have to go back to the library on Monday, so we watched both of them this evening.  It was a double feature so I made popcorn in-between episodes.

 

2015/05/14 (R) Deconstructing the Bus

The entry stairwell and passenger seat area of our H3-40.  Note the two mounting channels for the passenger seat

The entry stairwell and passenger seat area of our H3-40. Note the two mounting channels for the passenger seat

I spent most of the day continuing to disassemble the inside front half of our motorcoach while Linda split her time between working in the yard and helping me.  But before we got started on that work I made a follow-up appointment with the endodontist who did my root canal last fall.  I also indicated that I had been having some issues with my teeth in that area and they scheduled me for an evaluation as well.  I got my weekly follow up call from Diane at SteelMaster.  She was not very happy when I told her I wanted to consider an arched metal roof for a pole barn type structure and started to argue with me about foundations and poles.

Driver side sleeper sofa unscrewed from the floor and laying on its back.  Both end panels are off and the drawer and slides have been removed.

Driver side sleeper sofa unscrewed from the floor and laying on its back. Both end panels are off and the drawer and slides have been removed.

Wrong move.  If you are not going to give me the information I need to make a decision then you are not going to sell me any of your products.  She did admit, however, that I could purchase the stamped engineered design drawings without putting a deposit on a materials order.  The drawings would cost about $500 which I think is still unreasonable.  If the County denies my building permit SteelMaster will not take the drawings back and give me a refund.  It makes me wonder how they have ever sell a single building.  It’s not like I can take their drawings to another company and have them fabricate the materials at lower cost.  I can understand charging something, perhaps $200, just to keep people who are not serious from wasting their time, but $500 seems excessive to me.

 

 

 

Driver side sleeper-sofa with everything removed so I can disassemble it to get it out of the bus.

Driver side sleeper-sofa with everything removed so I can disassemble it to get it out of the bus.

Diane passed me off to Greg who handles the arched steel roof systems.  He has not dealt with me before so he was not frustrated with me.  For a 25′ wide x 50′ long building with a 25″ snow load he figured the roof system would be $10k to $13k.  The roof profile would be similar to their “Q” style building, which is shaped more like a Quonset hut, and attached to the top of the wall with plates that are similar to the base plates they use for their metal buildings.  The stamped drawings only would be $575, so if we decide to pursue this we will just have to spend that money to get these and hope the County Building Department approves the plans.  Of course, Diane was willing to sell Chuck and me two complete S Model buildings 32’ x 56’ without end walls for $20,400 total, so $10K – $13K for a roof seems expensive by comparison.

Passenger side of the bus looking towards the rear from the cockpit.  All of the furniture is out.

Passenger side of the bus looking towards the rear from the cockpit. All of the furniture is out.

We needed the space in garage where the lawn tractor is parked to store the furniture from the bus until we can dispose of it.  The tractor hasn’t been started since last fall (or summer?) so I hooked up the battery charger and let it charge while we worked.

 

This motor (center) was used to drive two geared pullies via flexible drive shafts (green) to open/close the drawer under the sleeper-sofa.  (One of the pullies is visible upper left.)

This motor (center) was used to drive two geared pullies via flexible drive shafts (green) to open/close the drawer under the sleeper-sofa. (One of the pullies is visible upper left.)

By the time we quit working around 6 PM we had disassembled the sleeper-sofa and unbolted the passenger chair.  We got the chair, both parts of the sleeper sofa, and both parts of the J-lounge out of the bus and into the driveway.  I started the lawn tractor and moved it out of the garage and parked it outside behind a thick grove of large trees and dense undergrowth so it was mostly hidden from view.  Once we got everything into the garage I removed the flexible HVAC ducts and threw them away.  I then started pulling up the old carpet and padding from the living room floor and steps, and removing the carpet from the walls in the entry stairwell and cockpit areas.

 

The base of the passenger side J-lounge.  This was a complicated piece of custom furniture.

The base of the passenger side J-lounge. This was a complicated piece of custom furniture.

[p6 R] I got all of the old material out and into the trash or garage and then removed one of the two filler panels from passenger side front floor and took that to the garage.  I could not remove the other filler panel because it had a hole drilled in it with an electrical wire running through it.  I will have to cut a slot to get it out and eventually shut off the power to that circuit and reroute the wire as it also passes through one of the HVAC 4” flexible duct adapters and into the HVAC chase.  A never cease to be amazed by the things that bus converters do in places they think you will never look.

The upper portion of the passenger side J-lounge sitting in the driveway waiting go in the garage.

The upper portion of the passenger side J-lounge sitting in the driveway waiting go in the garage.

We spent some time in the bus considering our remodeling plans.  With all of the furniture out we were finally able to see what we had to work with and some new possibilities emerged.  The wall paper is badly stained behind the sleeper-sofa area and the wall behind the J-lounge/dinette is unfinished as it was never visible or intended to be.  A lot of the woodwork needs to be cleaned and reconditioned.  We will do that with the Touch of Oranges Wood Cleaner and steel wool, after which we will apply a nice coat of Touch of Beeswax.

Passenger chair and drawers waiting to go into the garage.

Passenger chair and drawers waiting to go into the garage.

We have assumed from the beginning that we would replace the sleeper sofa with a new one custom designed and built to fit the available space, including a notch for the HVAC chase that would allow it to go all the way to the wall and fit under the window trim.  The only way we would be likely to get such a sofa is from Villa and their furniture is very expensive and takes an unreasonably long time to get.  Most of the furniture we removed from the bus was Villa, but it was all worn out.  We are now considering putting two barrel chairs where the sleeper-sofa was located, perhaps with a small cabinet between them.  We need to cut cardboard or heavy paper to match the footprint of possible chairs, cabinets, and the custom desk and set them in the bus to see how they will fit.

 

 

The "living room" of the bus looking forward from the kitchen.  All of the seating has been removed.  Note the black ceramic tile at te bottom of the frame.

The “living room” of the bus looking forward from the kitchen. All of the seating has been removed. Note the black ceramic tile at te bottom of the frame.

Sooner rather than later we will have to make some final decisions so I can draw up final plans for the desk and floor cabinets and get them to Jaral Beaty in Logansport, Indiana to build.  We are also going to have to settle on chairs and fabrics and get them on order.  Besides the floor we are going to replace the driver and passenger seats, and the refrigerator, so this is a major remodeling project.  I also have to rebuild the water bay, but that’s a different project for a different day and blog post.

Driver side alcove where the sleeper-sofa was installed.  Note the HVAC chase and flexible ducts used to get air out through the front of the sofa.

Driver side alcove where the sleeper-sofa was installed. Note the HVAC chase and flexible ducts used to get air out through the front of the sofa.

It was a very physical day with a few bumps and scrapes but no serious damage to us or the bus.  I went to the gas station to top up my fuel tank while Linda fixed dinner.  She had some left over white rice and ended up adding it to barley, lentils, split peas, carrots, mushrooms, red onions, garlic, greens, soy sauce, salt and pepper.  Everything except the greens was sautéed.  The greens were cooked separately and added at the end.  It was a delicious and complex combination of flavored and textures.  We watched Season 3 Episode 1 of Sherlock and turned in early as we needed to be up very early tomorrow and on the road to the Dayton Hamvention in Dayton, Ohio.

Passenger side HVAC chase with AC cable passing through 4" flexible duct adapter and then through the floor.  Really?  Really.

Passenger side HVAC chase with AC cable passing through 4″ flexible duct adapter and then through the floor. Really? Really.

2015/05/13 (W) Dental Deconstruction

We were both up at 7:30 AM.  I made tea instead of coffee and we had a light breakfast.  We both had 11 AM appointments with our dental hygienists and left a 9:35 AM to drive to Dearborn.  We had only gone a couple of miles when we realized we did not put the trash can at the curb so we went back and did that.

Traffic was light and we arrived at Gusfa Dental at 10:50 AM.  My hygienist, Michelle, took me in right away.  Linda’s hygienist, Margaret, took her in on time.  We both had good checkups with no new issues found or procedures required.  The tooth that has been bothering me occasionally all winter may be the one on my upper left, second from the back, that had the root canal last fall, followed by a crown.  Dr. Steve did not see any problem on the x-Rays or exam but said that my various complaints could all be associated with a small but persistent infection at the base of the root canal.  I am due for a 6-month follow-up visit with the endodontist anyway, and was putting off scheduling it until I had my regular checkup today.

It was 12:30 PM by the time we left the dental office and we were both hungry.  We wanted something other than fast food but considered going to Neehee’s Indian diner on Ford Road.  We decided not to go there as it was not very good the last time we went and they had changed the menu, eliminating some of our favorite dishes.  It is also several miles west of I-275 and that stretch of Ford Road is always congested and annoying to drive.  We stopped at the Macaroni Grill at 7 Mile Road and Haggerty Road instead.  We have always found the Macaroni Grill restaurants to be acceptable Italian food in a slightly quaint setting.  Today was no different.  Linda had rigatoni with arrabbiata sauce (spicy tomato), garlic, mushrooms, and spinach.  I had capellini with garlic olive oil and the same add-ins.  We had our fill of fresh baked bread to go with the pasta and were very full by the time we finished lunch.  We used to eat like this a lot more often which is part of the reason we both had a weight problem.

We thought about stopping at Brighton Ford to pick up some literature on the F-150 but decide to drive to Lowe’s at I-96 and Latson Road instead to look at refrigerators.  The smallest one they had on display was 14.3 cubic feet which gave us a chance to see the approximate size of the 13.5 cubic foot Fisher & Paykel.  The F&P is narrower and slightly taller than the one’s at the store, but has a bottom freezer drawer and fits our available space much better.  Lowe’s can order the F&P and it will take two weeks to get.  If I decide to do the fridge swap at Butch and Fonda’s place in Indiana we will have to pick up the F&P in Kokomo as that is the nearest Lowe’s.

Driver side sleeper sofa in our H3-40 with motorized drawer removed.

Driver side sleeper sofa in our H3-40 with motorized drawer removed.

When we got home I changed into my work clothes and worked in the bus.  After emptying the drawer under the jack-knife sofa and removing the APC UPS from under the foot rest area I removed the drawer, footrest cover, and front end panel.  I then removed the two HVAC duct transition boxes and then the two drawer slides.  With all of that out of the way I was finally able to remove the four 1/2″ lag screws from the four corners that secured the sofa to the floor.

Driver side sleeper-sofa with forward end panel and HVAC adapter box removed.

Driver side sleeper-sofa with forward end panel and HVAC adapter box removed.

Getting all of the furniture out will be much easier if we remove the front passenger seat so I worked on that next.  I had never looked carefully at how it was installed until now.  The chair has a 12″ wide x 15″ deep base plate that is bolted to the floor.  The bolts stick up from below and the nuts go over them.  I could not see the studs but I could feel the ends and eventually realized that Royale coach had installed the carpet OVER the base plate.  To remove the seat I would have to remove the carpet or at least cut it and fold it back.  The carpet had to come out eventually anyway and be replaced with vinyl tile so I removed it.  It was more work than it sounds, and took quite a while, as there was not a lot of room to work under, behind, or to the left of the seat, but I got that piece of carpet out.

Villa passenger seat in our H3-40 showing inside edge of mounting plate and studs with nus.  (Front of coach to the left).

Villa passenger seat in our H3-40 showing inside edge of mounting plate and studs with nus. (Front of coach to the left).

Removing the seat will now be a simple matter of loosening four nuts and lifting it off the studs, except for the fact that it is heavy.  The studs are presumably the threaded ends of T-bolts with the “heads” in two channels, front and rear, that are installed across the floor.  There is an opening at one end of each channel that allows the T-bolts to be inserted/removed.  My presumption is that all of this is Prevost factory designed and built, not something Royale Coach did, but the driver’s seat does not appear to be installed the same way, so maybe not.

Power base for Villa passenger chair in our H3-40.  This thing is complicated!

Power base for Villa passenger chair in our H3-40. This thing is complicated!

I finished working in the bus around 7 PM, put my tools away, and closed up the coach.  As a consequence of our big lunch we were not hungry and skipped dinner.  I called Butch to discuss the project and get some advice.  I then called Chuck and brought him up-to-date.  We finished the evening by watching Season 2, Episode 3 of Sherlock on DVD.

 

2015/05/12 (T) Dealing with the County

I finally paid a visit this morning to the Oceola Township offices and talked to the assessor and zoning administrator.  I had a satellite image of our property on which I had drawn the proposed barn and driveway.  All they need in order to issue a land use permit is for me to show the size of the building and the setbacks on the image.  I also visited the Livingston County Building Department.  I talked to one of the counter clerks who had me talk to Rick, who is one of the inspectors.  He had just built a large pole barn and used 6×6 posts set in 26″ diameter holes back filled with concrete.  The bottom of the posts need to be at least 48″ below grade to get below the frost line so I will figure on posts four feet longer than my exterior wall height.

Based on my preliminary online research and visits the land use, building and electrical permits are the only other ones I will need in order to put up a bus barn.  The clerk gave me a check sheet of the documentation I will need to provide.  I would have to file some additional paperwork with the County Health Department, but would not need permits from them or from the Drain or Road Commissions.

I drove to the Township offices on Latson Road by way of Hacker and M-59.  Hacker was so bad the last few days due, in part, to heavy rains that it was more pothole than road and many of them were larger and deeper than normal.  The road grader was repairing the road and it was digging deep.  The grader was still working when I returned home but the road was already much better.  The road needs to be rebuilt with a substantial amount of road gravel and with proper drainage ditches along both sides.  Or paved.  Paved would be good.  Linda read something last fall that indicated Oceola and Hartland Townships had agreed to pave Hacker Road from M-59 south to Golf Club.  We checked when we got home this spring but could not find any reference to such a project.

Back at the house I settled in to create a scale drawing of the floor plan of our bus and then draw in the 16″x16″ floor tiles.  I added up the various areas yesterday and added 25% for waste, but that turned out to be a low estimate.  By drawing the tiles I was able to count how many I would actually need.  I called Lynch Carpet in Howell and talked to Clint to get a rough price estimate for the materials.  The 16×16 Armstrong Alterna Luxury Vinyl Tiles are packed 14 to a box and can only be ordered by the box.  We need 190 tiles for the project so we will have to buy 14 boxes (196 tiles).  That turned out to be 50 square feet more than my original estimate, but would leave us with only six full tiles as spares, assuming I do not ruin any during the installation.  Fortunately, the vinyl adhesive and vinyl grout were less expensive than I expected, so even with a freight charge the bottom line was similar to my first estimate.  Using these tiles it will be approximately a $2,000 project.

My layout has the tiles in a standard pattern with the grout lines lined up in two directions, one running parallel to the long axis of the bus and the other perpendicular to that.  I presumed that this would take less tile and require less cutting but after seeing the layout I am not so sure.  I will probably make a second drawing with the tiles turned 45 degrees and see if it makes more efficient use of the tiles.  We plan to use a grout that is very similar in color to the base color of the tiles so the grout lines will tend to blend in rather than standout as a design feature, and perhaps make the orientation of the tiles less important visually.

Later in the afternoon I called Pat at Apex Roofing to let him know our shingle selection.  I left the information in a voice message and Pat called back later to confirm.  We are going to use the Certainteed Max Def Resawn Shake shingle.  We are still thinking about the skylight tubes.  We talked about putting one or two in the living room and possibly one between the kitchen/dining rooms and one in the hallway.  I realized that the air-conditioner would probably be in the way of the one for the kitchen/dining area, so we will not do that one.

Linda made granola today and made baked/stuffed acorn squash for dinner along with an asparagus, carrot, green bean sauté and fresh sweet Bing cherries.  I took care of some e-mail and then we had slices of the Mother’s Day vegan cake.  I called my sister to check on how our grand-niece was doing.  She called me back later and we had a long chat.  Linda and I then watched season 2, Episode 2 of Sherlock.

After Linda fell asleep I was still up (writing) when a noise started and did not stop.  I suspected it was the water sanitizer recharging, as the water softener had recently recharged, but I got up to make sure that’s what it was and not something else like a sump pump that was stuck in the on position.  It was the sanitizer, so I closed the laundry room door to reduce the noise and went back to bed.  I really need to soundproof the laundry room and reprogram the softener and sanitizer to come on at better times.

 

2015/05/11 (M) Bus Barns Reconsidered

I took a nap late yesterday afternoon, a rare but sometimes necessary thing.  I went to bed later as a result but still did not sleep well.  We have too many things going on simultaneously with significant dollars attached to them and that has a tendency to disturb our sleep.  I also planned to visit three County agencies today and the anticipation of that no doubt contributed to a less restful night.

I was up at 5 AM and awoke to heavy fog; literally, the air temperature had dropped and it was very foggy outside.  I decided to concentrate on uploading my blog posts for the first 10 days of May but ended up also working on the materials estimate for the new bus floor, checking and responding to e-mails, and making adjustments to the SLAARC website and e-mail forwarding addresses.  Once Linda got up and we had some coffee she spent the first part of the day working on the banking and roster for SLAARC, so it turned out to be a somewhat “slaarcy” day for us.  The fog changed over to rain as the day progressed and intermittent heavy rains moved through the area after lunch accompanied by a tornado watch that continued until dinnertime.  I did, however, get the blog entries for May 1 through 9 edited, tagged, and posted.  I really need to get back to posting each day as it occurs.

Our male cat, Jasper, was having tummy troubles today.  He tends to follow me around the house anyway, but today he stayed very close most of the day.  He climbed up in my lap while I was working at my desk no less than six times and went to sleep for as long as an hour at a stretch.  If not there he was curled up on my desk, on the carpet near my chair, on my lap or next to me on the couch, or alongside me in bed.  He has a loud, resonant purr and I heard (and felt) it a lot today.  It is one of my favorite things.

Linda finally persuaded me over the weekend that, as much as I was trying to contain the cost, the current approach to the bus barn project was just going to be too expensive.  I have not given up on the idea of building a bus barn but I am now rethinking my approach yet again.  Ironically, I am back to the idea of a true pole barn, which eliminates the concrete foundation.  Instead of wood trusses, however, I am looking at an arched steel roof.  That would eliminate the bottom chords of a wood truss which determine the ceiling height.  Downsizing the building would further reduce the cost and not pouring a concrete pad, or perhaps only a partial one, would reduce the cost even more. A 24′ x 48′ building with a 16′ center ceiling may only require 12′ side walls, which would keep the posts and other lumber costs reasonable. The site prep and finish grading cost is there no matter what we do.  The main things we give up with this approach are the 19′ ceiling in the center, which would have allowed me to walk on the roof and work standing up, and an overhead door which would be expensive anyway.  Working on the roof would require moving it outside and the door would have to be a two-piece exterior slider or “barn style” pull open.

Chuck and I have been talking seriously the last couple weeks about trying to agree on a metal arch building design so we can order two buildings and get a quantity and shipping discount.  I called Chuck before dinner to let him know what we had decided we were not going to do that, at least not this year, and explain the reasoning behind the decision.  He is faced with the exact same issues and we had a long bus barn chat, to be continued in the days ahead.

While I was on the phone with Chuck my sister called my cell phone so Linda took the call.  My grand-niece, Lilly, had experienced several more seizures since she returned home from the hospital on Wednesday.  She was at a different hospital where they were going to hook her up to an EEG for 24 hours as none of the one-time EEGs have shown anything abnormal.  Lilly is only 27 months old and this has to be a bit scary for her; it certainly is for the adults around her.

Linda prepared a simple meal of fresh asparagus, white rice with soy sauce, and mock chicken with orange sauce.  We had another piece of the vegan cake for dessert later.  We have also decided that now is the time to replace the refrigerator in the bus so we spent time after dinner continuing to look at units online.

The current fridge, which is a side-by-side Jenn-Air, is a 22.6 cubic foot model.  Newer refrigerators with similar case dimensions tend to be smaller in usable volume but even 17 cubic foot models do not appear to fit in our refrigerator cubby.  The newer ones tend to be more energy efficient, so they may have thicker insulation thus reducing the interior volume.  The problem is that they also tend to be taller as a way to maintain the width and depth dimensions.  The unit that has our attention at the moment is a Fisher & Paykel 13.5 cubic foot model.  That is a lot less refrigerator storage than we have now, and would have to adjust how we shop, but we would be able to take it in and out through the main entrance door of the bus and recover about 11 inches of width for a pantry that would be 67″ tall and 29″ deep.  That is a lot of storage and may be a good trade-off.

We finished the evening watching Season 2, Episode 1 of Sherlock.  I do not generally enjoy watching TV programs a second time, but the BBC Sherlock series holds up very well on repeated viewing.