Category Archives: Medical-Dental

2015/10/22 (R) Another Routine Exam

Linda got up at 2:30 AM and started drinking the second half gallon of GoLightly at 3 AM.  She was done with it by 5 AM, as required, and got me up at 5:45 AM.  We were going to leave for the HFHS Columbus Center in Novi at 6:15 but actually left closer to 6:30.

The traffic inbound to the Detroit Metro Area from the northwest at that hour of the morning is heavy and the slowdowns are ridiculous in the sense that there is no apparent reason for them.  And yet, according to Linda, the traffic comes to a complete stop at approximately the same places every day.  Part of the problem seems to be that people do not know how to merge.  This might be a driving specific manifestation of the more general problems in or society of people thinking they should always come first and being unable/unwilling to compromise.  Another problem is that people speed and tailgate, which means they are frequently on their brakes, the implication being that the rest of us should somehow get out of their way.  Brake lights, in turn, seem to cause a chain reaction and far enough back in the chain traffic can come to a complete halt.  Whatever the causes, we do not drive the highways at rush hour if we do not have to.

We got to the Columbus Center with a few minutes to spare, got a nice parking spot, and went inside.  We found the colonoscopy clinic on the second floor and Linda checked in.  She was the first patient on the schedule for her doctor and did not have to wait very long before being taken in.  The Columbus Center has guest Wi-Fi for their customers and a small self-serve cafe so I went there and had some coffee while I researched flash units and lenses for the Sony SLT-a99v camera that I recently acquired.

Linda’s colonoscopy took less than an hour.  She had come out of the anesthesia, gotten the preliminary results (good), and been discharged by 9:15 AM.  She got dressed and we were on our way by 9:30.  She was hungry, of course, so we went to the Panera on Novi Road just south of Grand River Avenue and had coffee and bagels.  On the way home we stopped at the new Menard’s on Wixom Road just north of I-96.  They had the Eaton RV electrical outlet boxes for the same price as Lowe’s but had a better selection of conduit adapters.  I bought three pieces that together would allow me to connect the bottom of the RV outlet box to the conduit I already had.

We got home at 11 AM and it did not take long for Linda to go to bed.  While she slept I installed the RV outlet box on the post by the new driveway extension and level parking pad.  The first step was to cement a 1-1/2″ to 1-1/4″ reducer into a 2″ to 1-1/2″ reducer which I did in the garage.  The weather was on the cool side of perfect but a nice enough day for working outside with appropriate clothing.  The next step was to determine where to cut off the vertical piece of 2″ PVC conduit so the bottom of the outlet box would be 24″ above the ground.  The pair of reducers would take up about two inches so I marked the pipe at 22″.

The conduit was tight to a 4″x 4″ post and secured by two plastic conduit brackets.  I removed the upper bracket but could not use my Rigid tubing cutter to go completely around it so I used a hacksaw.  I could not just cut all the way through the pipe, however, because of the rope that was inside to be used later to pull wires through the conduit.  I cut a large “V” notch on the side opposite the post, like I would when felling a tree, and pulled the free end of the rope out through the opening.  The notch was horizontal on the bottom and came in at about 45 degrees from higher up.  With the rope out of the way, and secured so it could not fall into the pipe, I continued the horizontal cut and finished cutting through the conduit.

I loosened the clamp holding the bottom of the pipe so I could move the top of it far enough from the post to get some PVC cement most of the way around the riser.  I then pushed and twisted the 2-piece adapter assembly over the 2″ conduit.  Using a short level I plumbed the riser pipe while eyeing its relationship to the post.  Holding the upper clamp over the pipe I secured the clamp with two screws but did not tighten the clamp all the way down.

RV electrical outlet box on top of riser post with level on top.

RV electrical outlet box on top of riser post with level on top.

I set the outlet box on top of the adapters and dropped the third piece through the hole from the inside but did not cement it in.  I used the level to plumb the box, checking it visually in relationship to the post and pipe, and then marked the three mounting holes with a marking pen.  I removed the adapter collar and box and then center-punched and drilled holes for three pan head wood screws.  I put the box and collar back on/in the pipe and secured it to the post with three pan head wood screws.  I then installed the removable panel with the outlet mounted in it.  I coiled up the extra rope, closed the cover, and was done except for getting all of the tools and materials back into the garage.

I checked on the thermometers in the bus refrigerator and recorded the readings.  I then decided to add a duplex AC outlet in the cabinet behind the driver’s seat.  I found a deep plastic single gang remodeling box, a brown duplex outlet, a brown oversized cover plate, and a 30″ length of 14-2+G cable.  I used the box to outline the opening and then completed the lines with a small square.  I drilled out the four corners of the opening with a 1/2″ drill.  I then cut out the opening using a saber saw, finishing some of the inside corners with a hacksaw.  I made quite a bit of sawdust and wood chips so I vacuumed up the mess before continuing with the installation.

The new AC outlet box (blue) installed in the front of the A/V cabinet behind the driver’s chair.

The new AC outlet box (blue) installed in the front of the A/V cabinet behind the driver’s chair.

I turned off the breaker in the inverter subpanel for the driver side AC outlets circuit and verified that the existing outlet was not energized.  I removed the cover plate, unscrewed the duplex outlet, and pulled it out.  I opened a second access hole on top of the outlet box and then prepared the cable by removing about 4″ of the sheath and stripping about 3/4″ of insulation off of the wires.  I fed the cable through the hole and connected the wires to the appropriate screw terminals.  I turned the outlet over so the round ground pins were at the top rather than the bottom, screwed the outlet back into the box, and put the cover plate back on.  I had hoped to finish the whole job before dinner but dinner was ready so I went inside to eat.

For dinner Linda made a salad and Garbanzo beans with onions and Swiss chard lightly sautéed in olive oil.  It probably had a little garlic and might have had a few hot pepper flakes as Linda often uses these ingredients, but I don’t know for sure as I am wrote this post two days later.

After dinner I finished installing the new outlet.  When I put the oversized cover plate on it appeared to be close enough to the top edge of the cabinet that it would interfere with the Corian top.  No big deal, I would just swap it with the regular size plate on the original outlet.  When I went to take the first cover plate off I noticed that one of the outlets was cracked in half horizontally.  I will have to replace it but did not feel like getting into that this evening with the light and my energy fading.

It had been a long day, and I was admittedly tired and contemplating an earlier than usual bedtime, so I locked up the bus and went into the house for the evening.  We turned in at 9 PM and were asleep by 10.

 

2015/10/07 (W) The Root Cause

We had Linda’s homemade granola for breakfast with fresh blueberries.  Berry season is just about over for the year and they will become more expensive as they have to be transported from farther away.  I made a pot of Sweet Seattle Dreams, the half-caff blend that Jeff makes just for us, and we drank it in the living room.  Linda checked in on the world and pulled up the latest video from NutritionFacts.org while I researched hardwood veneers on Rockler.com.

After breakfast and coffee I called Metro Environmental Services to arrange to have the culvert under the road cleaned out.  They were able to schedule us for this afternoon so I accepted that appointment.  I then called Brighton Honda to check on my car and left a message for Rob, the service advisor who wrote up the repair for the driver side door lock.  I had no sooner left that message than I got a call from Karen at Bratcher Electric.

Mike had worked up the quote to install the 100 Amp disconnect, tie it into the output of the transfer switch, and run a 100 Amp 4-wire service entrance cable to the current sub-panel, making it into a main panel.  They would also disconnect and cap the current sub-panel feed from the basement as part of the work.  At just north of $1,300 it was a good $300 higher than I expected.  My expectation, however, was not based on anything specific other than my own sense of the cost of materials and the amount of labor that might be involved, plus a desire for it to not cost more than $1,000.  🙁

With the phone calls taken care of we worked in the bus for the rest of the morning.  Linda worked on stripping the remnants of wallpaper that remained after we removed the mirrors from the lower outside hallway wall yesterday.  I worked on re-routing the heater hoses for the fan-coil heat exchangers.  She got her job done before I got mine done.  That’s usually the way it is.

To start, I removed one of the old 4″ round plastic grates and used my inspection mirror and a flashlight to examine the inside of the HVAC duct.  What I discovered was that the two heater hoses were secured periodically with plastic cable clamps to the outer wall of the HVAC duct.  I also discovered that the metal part of the duct is just the inner wall and top.  The bottom is the plywood subfloor of the bus and the outer wall is the plywood wall.  As originally built the metal portion of the duct could be removed but when Royale Coach did the conversion they built cabinets around the ducts and put wood wiring chases on top of them in such a way that they can no longer be removed without partially disassembling the coach.

The location of the hoses and wires in the duct was such that I could safely use my 4″ bi-metal hole saw to cut access holes for the hoses.  I determined where the cable clamps were located by measuring inside the duct.  I then marked where the access slots in the bottom back of the bases would be located and determined where I needed the two hoses to emerge from the duct.

The manual sheet metal nibbler used to cut a line between the bottoms of the two holes in the HVAC duct.

The manual sheet metal nibbler used to cut a line between the bottoms of the two holes in the HVAC duct.

There was already a 4″ hole at one of my needed locations so I drilled a second one next to it with an inch in-between.  I used Chuck’s hand powered sheet metal nibbler to connect the holes together to make an opening that looked like the track around a football field.  We vacuumed up the metal chips and I then installed door edge molding all the way around the edge of the opening.  I was able to reach the screws holding the first pair of cable clamps with a #2SR screwdriver and remove them.  This large slot will be behind the left end of the center connecting cover of the desk and the hose for the heat exchanger that goes in the left base will come out of it.

 

Plastic U-channel door edge molding installed around the new heater hose opening.

Plastic U-channel door edge molding installed around the new heater hose opening.

The location of the next pair of cable clamps corresponded, roughly, to where I needed the hose for the right heat exchanger to emerge.  I drilled two 4″ holes, side-by-side, at that location and nibbled out the little bit of metal in-between them to make a second slot.  Again, I installed the door edge molding around the entire edge.  The molding was a tight fit, and I had to use a screwdriver to get it to go on the inner curves, but I got it on.  The U-channel is locked in mechanically and has adhesive in it so it should stay put once it has had a few days in place.  Once the hoses are re-routed I will put screen material, and perhaps some solid plates, over the openings to prevent critters from gaining access to the living area by way of the HVAC PCTS (Prevost Critter Tunnel System).

 

The access holes in the OTR HVAC duct in the area behind where the desk will be installed.

The access holes in the OTR HVAC duct in the area behind where the desk will be installed.

Linda had two medical appointments this afternoon, both routine diagnostic procedures, so she got cleaned up, changed her clothes, and left around 12:30 PM as I was finishing up the second slot.  I went inside and was thinking about making something for lunch when the doorbell rang.  It was our mail carrier, Michelle, with a package that was too big for the mailbox.  A few minutes later the doorbell rang again.  I figured it was Michelle again, but it was one of the guys from Metro Environmental Services.  They were supposed to call first but just showed up.

I put my shoes on and walked them down to the clogged culvert that goes under the road.  I was really hoping they could clean it out from the south side but when we went into the woods we could not see the end of the culvert.  They got a metal detector and located the end of the pipe.  It was almost completely buried and had a massive root running right in front of it from a very large nearby tree.  They got a shovel and dug out around the root, exposing much of it and the end of the pipe.

The tree was probably 30″ in diameter at the base and the root was at least 10″ in diameter.  I got my (new) 18″ chain saw but had trouble getting it started.  It turned out it was out of gasoline.  Once I got it started I tried to cut through the root on either side of the culvert.  I thought I was all the way through on one end (closest to the tree) and most of the way through on the other end, but the root would not budge.  I dulled the teeth on the chain to the point where the saw would no longer cut and did not want to take the time to put a new chain on just to ruin it quickly.  The guys finally agreed to hydrojet the culvert from the north side of the road.

The actual cleaning out of the culvert did not take that long.  The pump produces 2,000 PSI and they used about 300 gallons of water from the onboard tank on their truck.  The head on the end of the hose has one forward facing nozzle and many rear/side facing nozzles.  The forward facing nozzle loosens and cleans out the area directly in front of the head while the other nozzles force the head forward and blast whatever is in the pipe back out towards the entrance.

They started with a small head and ran it in until there was water coming out the other end of the culvert.  They then pulled the hose back and switched to a much larger head and ran that all the way through and back.  When they were done muddy water filled the culvert and the depressions on either end.  On the inlet end the water was only about 3″ deep in the bottom of the culvert but on the outlet end it was near the top.  They billed me for the minimum first hour amount even though I think they were here longer than that.

I called Phil to let him know what we had run into.  He was surprised, to say the least, as he thought he had checked the other end of the culvert.  Obviously not, but that’s water under the road, so to speak.  Besides the problems with the root and the discharge end of the culvert being below the surface, it looked to me like the discharge area was something of a low spot and it was not obvious to me where water would flow from there.  I have learned, however, that I am not very good at judging such things visually.

Cory, our neighbor across the street, had come over to see what was going on.  He offered that the discharge area does, in fact, drain to the south through his property and eventually to Golf Club Road.  Cory has been here for 30 years so I have no reason to doubt the truth of that.  The elevation where Golf Club ends at Hacker and where our street ends at Hacker appears to be about the same.  Our street is fairly level while Golf Club has a little bit of up and down, but it is subtle.  I suggested to Phil that we might have to clear a path into the woods for his small digger and do some trenching to give the water a way out.

While Cory and I were chatting I noticed that the trees along this part of the road were hanging out over the road on both sides and were rather lower than they should be.  This is the very thing I complain about with regards to the way most of our neighbor’s fail to maintain their properties along the road.  I decided I should do something about it so I got our pole saw and spent a couple of hours trimming the low overhanging branches.

Linda went to the Whole Foods Market in West Bloomfield following her medical appointments and got home just as I was finishing up the pruning.  She went for a walk while I called John Palmer of Palmer Energy Systems in Florida.  I bought our Magnum inverter/charger for the bus from John along with various accessories and batteries.  I needed a 4-wire terminal block for our Magnum Battery Monitor Kit (BMK) because I had messed up the one that came with it when I originally installed it.  John confirmed that Magnum Energy had recently been acquired by Sensata, and was in the process of relocating the plant to Minnesota, but that several of the old-timers were still on board.  John needed to talk to Tom anyway and asked me to call him back in a week to see if he was able to get the connector.

I checked with the service department at Brighton Honda again and Rob said he expected to get the new door lock mechanism back from the locksmith tomorrow morning and to have the car ready for me to pick up by the end of the day.  It will be nice to finally have it back.

The cloudy weather finally broke today and we saw some blue sky with brighter light levels than we have had recently.  The day was lovely but a little on the cool side by late afternoon so we both had a cup of hot tea.  Linda took advantage of the light to work on her counted cross-stitch project, a holiday stocking for grand-daughter Madeline, and I went back to the bus to sand off the last traces of the old wallpaper from the outside wall in the hallway.

I used our Porter-Cable 1/4 sheet palm sander with 80, 120, and finally 220 grit sandpaper.  The sander has an integral dust collection bag but it does not capture all of the dust.  I used the vacuum cleaner to pick up as much of the residual dust as I could and then used a tack cloth to wipe down the wall.

For dinner Linda made pan-grilled tofu with caramelized onions in sweet barbecue sauce.  She served it open-faced on rye bread, because that is what we had, and steamed some fresh green beans as a side dish.  Yum.

After dinner I drove to Lowe’s.  I needed something I could use to plug the two heater hoses to keep them from leaking as I pull them back through the HVAC duct and out through the new slots I made for them today.  I ended up buying two 3/4″ barbed plastic plugs.  While I was there I looked to see if they had any bleeder valves but they did not.  They do not sell parts designed specifically for hydronic heating systems and I will have to go to Northwest Plumbing and Supply for such items.

While I was in the plumbing isle I looked to see if I could figure out some combination of parts to make a fill valve for the system but did not see anything that inspired me.  I would love to have one or more high point expansion tanks on this system but I do not have any easily accessible places for them from which I could also run overflow drain lines.  There is a good sized volume of unused space behind the drawers on the passenger side of the bedroom but it would be a very difficult place to install anything.  Perhaps Northwest Plumbing and Supply will have something.

On the way home I stopped at the BP station and topped up the fuel tank in Linda’s car.  I drove home with greater consideration for fuel economy than usual and managed to get the average MPG up to 56.7 before it dropped back to 55.4 as I pulled in the driveway.  It will drop into the upper 40s as soon as Linda starts the engine tomorrow morning but it was fun to get it into the driveway with numbers above 55 MPG.

 

2015/10/01 (R) New Month, Same Project

For various reasons we have not worked on the bus the last two days.  For one, Linda is still recovering from a cold and/or seasonal allergies that may have been triggered by some weeding she did over the weekend.  August and September are the time of year for ragweed in Michigan.  For another, I was tied up most of Tuesday with the bus windshield replacement and yesterday we both had our annual physical exams, mine in the morning and Linda’s in the afternoon.  Throw in an unexpected problem with the driver door lock on my car and a lawn tractor that wouldn’t start and that took care of most of the day.  Since I wasn’t working on the bus I used some of my time to edit drafts of blog posts and started selecting and processing a few photos to go with them.

I got a call from Philip Jarrell around 8 PM last night letting me know that a last minute project came up that required his attention today.  If all goes well he plans to start on our French drain and driveway extension project tomorrow.  Our project is a relatively small job for Phil and I accept that he has to fit it in around larger projects for long-term customers who give him a lot of repeat business.  Still, I think he likes working with us and does his best to fit us in.

I had hoped to get back to work on the bus today, specifically working on priming the walls and hanging the new wallpaper, but Linda had another annual medical appointment this afternoon.  Neither of us likes to get into our work clothes and get involved in physical tasks for just a small portion of the day so after breakfast, and a leisurely morning in the living room enjoying coffee to the glow and warmth of our fireplace, she settled in to work at her desk for a while before going on a walk.

Our whole house generator threw a code 34 on Tuesday afternoon indicating that it required maintenance but would still operate if needed.  I called Bratcher Electric to see what was needed and spoke with Karen.  I think she and Mike own the business, but it’s possible she is Mike’s daughter.  Whichever, I’m certain that she is family.  Our generator was last serviced one year ago on the same date (29th) and the 34 was the total number of hours it has run since being installed in May 2013.  I set up the service appointment for Friday October 9th.

While I had Karen on the phone I asked about the project Mike had come out to look at a year ago.  I need his electricians to run a 4-wire, 100 Amp service entrance cable (SEC) from the transfer switch in the southwest corner of the garage, through the garage attic, and into the secondary distribution panel in the HVAC closet in the northeast corner of the garage, making it a main panel instead of subpanel.  Karen said she would leave a note for Mike to follow up with me.

It was going on noon when I finally got back to work on the bus.  It is a gorgeous fall day, chilly and breezy but with abundant sunshine, and I just could not let it slip away without getting something done on our interior remodeling project.  I was at least 60% done with rebuilding the landing where the stepwell slide cover used to be and that seemed like the logical thing to get finished.  It was 52 degrees F in the bus so I turned on the front electric toe-kick heater and set up the small Broan portable electric heater in the kitchen blowing forward towards the cockpit.  I also noticed that the refrigerator thermometer indicated 43.5 degrees F.  We do not have any food in the fridge but we do have freezer packs and containers of water for mass.  43.5 is warmer than I want so I checked the freezer reading and it was 28 degrees F.  Yikes!  That was way too warm.

Frame and center support for the new landing platform. Air lines crimped and secured.

Frame and center support for the new landing platform. Air lines crimped and secured.

The 31″ X 27.5″ piece of 3/4″ thick plywood for the landing platform flexed slightly when I stepped in the middle.  I’m not sure anyone would notice it when stepping on it but we do not want the tile that will be on there to crack from the deflection.  My solution was to cut an appropriate length of the 2.5″ wide 3/4″ thick poplar and install it on edge running long ways to support the middle of the plywood.  I had to use an angle bracket at the back edge (by the driver’s seat) and place shins under it at several places to get it to fit just right.

About this time Linda came out to let me know lunch was ready.  We each had a half sandwich of hummus and raw onion on rye bread and some black grapes.  She left for her doctor’s appointment and I made a big cup of Constant Comment decaffeinated tea.  I called Chuck to see if he knew where his powered metal shears (nibbler) were and if I could borrow it.  The answers were ‘yes’ and ‘yes.’  I decided to take his suggestion of cutting two new access openings in the passenger side HVAC duct to allow the two existing heater hoses to come out and go directly to the fan-coil heat exchangers with minimal bending.  It will simplify the installation, eliminate soldered copper parts and connections that would restrict flow and be a potential leakage point.  Since my car is in the shop for the next several days I will have meet up with him when Linda’s car is available.

Back in the bus I checked the refrigerator and the fresh food compartment was at 39 degrees F and the freezer was At 6 degrees F.  Those are the sort of temperatures I expect to see.  I had the freezer set to cycle between about 0 and 10 but occasionally saw it go as high as 17.  I figured it had something to do with an automatic defrost cycle, but anything over 20 is troubling.  Linda had suggested earlier that perhaps we need to replace the batteries in the remote sensors and the base unit.  She may well be right and it won’t hurt to do that anyway.

When I got back to work on the landing I folded over the ends of the two air lines and put cable ties on them to close them off.  The air supply for the solenoid valve that controls these two lines has a shut off valve which I intend to keep closed, but if it gets opened accidentally it could drain the auxiliary air tank through one or the other line if they were not crimped closed.  I may eventually disconnect the supply line at the valve and cap it, but for now this will at least prevent an open line leak.

New landing platform structure with sound/thermal insulation.

New landing platform structure with sound/thermal insulation.

After screwing down and cutting off the shims I plugged the hole where the air lines come through the floor with steel wool and secured the lines to the floor with cable clamps.  I then cut fiberglass insulation to fit the two spaces in the floor.  I used the same John’s Manville Sound & Thermal insulation that we used in my office and ham shack as I had some left.  I put the plywood floor piece in place, evened it up along the front edge, and screwed it down but ran out of screws before I had it completely secured.  Projects are like that.

I was walking towards the garage when I saw a car coming very slowly from west of our house headed east.  The drive pulled past our third drive and stopped but I could not see what the driver was doing.  The car eventually continued on, followed closely by a second vehicle and I thought the flashed me a somewhat dirty look, but they did not stop and were too far away to be sue.  Still, I thought that was odd.  I did not give any further thought to it until I went out to get the mail and noticed a lot of debris in the road and a large, dead tree in the ditch.  It had been windy all morning and at one point I thought I heard the crack of a falling tree but it sounded farther away than where this one lay.  The driver had obviously stopped to move it and was probably a little bit annoyed that they had to do that because I had not taken care of it.  Hey, I didn’t know!

I moved it a little more and then got a metal toothed rake and pulled all of the small debris out of the road.  There were limbs on the other side of the road that were 1″ to 2″ in diameter so the tree had obviously fallen all the way across the road.  The property on the other side of the road is part of our yard but I would have cleaned up the branches regardless since the tree clearly fell from our yard.

Linda stopped for groceries on the way back from her doctor appointment and did not get home until almost 4 PM.  We got a pruning saw and cutter and she helped me cut up some of the upper part of the tree and get the pieces farther from the road.  We noticed another dead tree in the same area that looked like it would eventually fall over across the road.  I can cut it down safely but will need the chain saw to do so.  I was not in the humor to get it out and try to get it started at that exact moment but noted to myself that I needed to do this sooner rather than later.

We were not going to start any messy bus work at that hour so I changed into nicer clothes to go out to dinner.  Before we left I texted Josh at Coach Supply Direct to clarify an earlier e-mail and let him know that two of the MCD shades were not staying attached to one of their clips.  We left at 5 PM for the La Marsa in Brighton and stopped at the bank on the way.  For dinner we split an order of Moussaka and got two salads as our sides along with the warm pocket bread and garlic spread.  The food was good and we had a tasty, filling meal for under $14 plus tip.  It is our best/favorite restaurant option within reasonable driving distance of our house.

After dinner we stopped at The Home Depot in Brighton but they did not have the screws I wanted.  When we came back out I noticed that the tires on Linda’s car were under-inflated and on closer inspection that the side walls were badly checked.  We drove to Discount Tire in Howell but they were closed.  We stopped at Lowe’s and bought the screws I needed, some furnace filter material, and Lithium batteries (AA and AAA) for our TempMinder base/remote thermometers as we keep the two remotes in the bus freezer and fresh food compartment and the base station on the bus kitchen counter.

Back at the house I worked in my office for a while selecting/processing photos to go with blog posts but I did not feel like putting in a long, sustained effort on the task.  I got a call from Phil at Precision Grading.  His other job did not get finished today and he will have to return to that job site tomorrow.  He hopes to start our French drain and driveway work on Monday but that may not happen.  I am anxious for him to get started but I have no control over that.  I appreciate, however, that he keeps me informed as it allows me to plan my own time.

We watched The Woodwright’s Shop, Rick Steves’ Europe, and Travel in the Americas on DPTV (WTVS) and then went to sleep.

 

2015/09/30 (W) Annual Checkups

We were both scheduled for our physical exams today.  Mine was at 9:20 AM, and I needed to leave by 8:20 to be sure I was there on time, so I got up at 7:30, showered, and dressed.  I took my vitamin and allergy meds but did not make coffee or have breakfast, Linda’s appointment was at 1 PM so she slept in.  We both had our blood drawn a week ago and the lab results had already been reviewed by our doctor and made available to us via the Henry Ford Health System MyChart patient information system.

We are both basically in good health with only minor issues, such as arthritis in the base of my thumbs or worn out knee joints in Linda’s case.  Both of our blood analysis results were OK across the board but that does not mean we were completely happy with them.  My blood pressure was a little higher than I would like but the doctor thought it was fine.  Linda’s total cholesterol is higher than she would like so we are still learning what dietary choices and physical activity have to do with controlling that.  We respect our doctor’s judgement but we are also re-calibrating our own understanding of what is desirable for us versus what is “normal” for adults our age living in the USA.

The problem with “normality” is that it is a statistical concept.  In a population that is overwhelmingly unhealthy we do not necessarily want to be normal.  As an example, American medicine considers the normal range for total cholesterol to be 120 to 200 and yet research, as reported by Dr. Michael Greger at NutritionFacts.org, shows that real health is associated with a number less than 150.  Most Americans have total cholesterol way above that except for one group; active vegans.  As another example it is generally accepted that as people age blood pressures in the 130’s over 80’s are “normal” and yet in rural China and Africa, where people eat mostly whole-food plant-based diets, “normal” is 110 over 70 for their entire lives.  Heart disease and other “western” aliments are also virtually unknown.  We are still works in progress.

I do like my morning coffee even though it is usually half regular and half decaffeinated so I left my physical exam and headed for the Tim Horton’s at Beck and Grand River Avenue.  While I was in line I got a call from Chuck wanting to know if the new windshield cut down any of the wind noise.  He was headed to his shop just down the street so I suggested he stop and chat over a cup of coffee.  I told him what intersection I was at but mistakenly told him I was at Dunkin Donuts so he stopped there first.  We have air/water leaks around the other windshields, side windows, and the entrance door so I could not tell any difference from replacing just one windshield.  I trust, however, that the new one will not leak air or water and it is currently not cracked or dinged, so I am happy with it.

Linda texted me that she was leaving early for her appointment and was going to stroll around the mall.  When I got home and tried to lock the driver side door on my Honda Element the key stuck in the lock and would not turn or come out.  This lock has been failing for a while but the failure mode has been an inability to insert the key.  Fortunately I had a second key in the house and was able to unlock the passenger door and rear lift gate.  Not only was I unable to remove the key, the latch was disconnected from both the outside and inside handles and I could not get the door open.  I called Brighton Honda to make sure they could give a ride back to the house and then removed the ham radio control head and microphone, the GPS, the cellular booster, and the 2m/70cm antenna before driving to the dealership.

Rob checked me in and tried jiggling the key harder than I had.  The key still did not come out but he managed to get the latch to re-engage with the handles so we could get the door open.  He wrote up the work order and I only had to wait a short time for the shuttle to return and drive me home.  Rob called later in the afternoon with the estimate.  They had to order a new latch which should be in on Friday, and then send the latch and one of my keys to a locksmith to have the lock matched to the key.  By the time they got the mechanism back from the locksmith and installed in the door he figured it would be the middle of next week.  That was not ideal for me but it was what it was.  The car was not very usable in its current condition so I did not really have a choice.  I was all too well aware that this was another case where I put off fixing something longer than I should have.  I was lucky, in a sense, that it failed when and where it did as I was not stranded somewhere calling Linda to bring the spare key.

When I got back to the house I attached the battery charger to the battery in the lawn tractor.  Philip Jarrell is supposed to start working on our French drain and pull-through driveway extension tomorrow and the lawn tractor is parked where he will be working.  I added gasoline to the tank but even after bringing the battery to full charge and using the jump start feature on the charger I was unable to get it started.  After repeated attempts I gave up.  When Linda got home we disengaged the transmission and pushed to another part of the yard where it would be out of Phil’s way.

I have mentioned before that this lawn tractor was left here by the previous owners.  The mower deck was pretty messed up and we removed it this past spring.  We have a lawn service, Kish Lawn Care, mow the grass so we really do not have a reason to buy a new lawn tractor/mower.  Still, I thought it would be useful for hauling materials and debris around the property and I put new drive tires on it in 2013 and bought an 18 cubic foot dump trailer this year to pull around behind it.  Whatever the problem is I’m sure it can be fixed, and probably by me, if/when I have time; which I do not at the moment.

I spent much of the rest of the day in my office except for dinner.  I reviewed the final draft of an article I wrote which is running in the October 2015 issue of Bus Conversion Magazine.  I then logged in to the B&H Photo website and finally ordered the Sony alpha99 (a99v) DSLT body and a few accessories.  The body comes with the vertical grip battery pack for no extra charge, a $378 value, so that was a nice surprise.  The body comes with one battery but the grip, which holds two additional batteries, does not come with any, so I ordered five additional batteries giving me six total for two complete sets.  I also ordered two 64 GB memory cards and a small case for carrying an extra battery on my belt.  B&H is closed until October 7 for SUCCOS.  My order is scheduled to ship on the 8th and arrive on the 9th, no added shipping charge.

I spent the rest of my time editing drafts of blog posts and selecting/processing a few photos to go with some of them.  I hope to have the posts for the first two weeks of August uploaded in the next couple of days.  When I finally came upstairs we watched a show on PBS about the life long work of biologist E. O. Wilson.  It was fascinating.

 

2015/09/24 (R) Blood Work

Linda got confirmation yesterday that our lab orders had been put in by our doctor.  The blood work requires a 12 hour fast (minimum) so we finished dinner last night before 8 PM and did not have breakfast this morning.  We headed out around 8:30 AM for the Henry Ford Health System Columbus Center in Novi, the nearest HFHS lab to our house.  We would not normally get on I-96 at that time of day due to rush hour traffic but we wanted to get this taken care of early and then get something to eat and drink.  We got to the lab at 9:15 and it only took a few minutes to get our blood drawn.  We then headed to the Panera on Novi Road at Grand River Avenue for bagels and coffee and some down time to sit, relax, read, research, and write.

Linda spent some time last evening researching wallpaper installation but found conflicting information.  I got online and looked at some of the same websites.  Wallpaper is a little out of style at the moment and some of the website information was over 10 years old but still seemed relevant.  The interior walls of our motorcoach are finish grade plywood that is firmly attached to the structure of the bus with spray foam insulation underneath.  The issue is how to prep the plywood before we hang the wallpaper.  Some sources indicate that we need to size it, some say to prime it, and others say to use a liner material and then prime, all before hanging the paper.  Other sites, however, say to just hang the paper directly on the plywood and be done with it.

We left Panera and were headed west on Grand River Avenue.  We noticed that Chuck’s truck was at his shop so Linda made a U-turn and we stopped to see if he was there.  He was, so we visited for a while and got to see their new refrigerator and discuss the installation, which Chuck somehow managed to do all by himself.  Even with the use of his forklift, that was quite an accomplishment.

We got back to the house at 12:45 PM, changed into our work clothes, took care of a few chores, and had a light lunch of fresh apples, pears, and hummus with onion on rye bread.  I then called Josh Leach at Coach Supply Direct and left a message asking him to follow up with Ferman Miller at Countertops Plus.  If Ferman does not have any more of the Sandstone Corian I want to make sure Josh gets the 30″x48″ piece from the other supplier before it disappears.

The entrance landing with the floor removed revealing the pneumatic linear actuator that operates the slide out stepwell cover.

The entrance landing with the floor removed revealing the pneumatic linear actuator that operates the slide out stepwell cover.

When we finally got to work on the bus around 2 PM Linda focused on stripping the old wallpaper and I started preparing the entrance for tiling.  She taped off all of the wood trim where she is working, spread painter’s plastic to protect the floor, and wrapped the two living room captain’s chairs.  I removed the existing vinyl tile from the entry platform, removed the plywood cover, and uninstalled the step well cover.  I then removed the tile and treads from the stairs.  I also moved the passenger seat forward and determined that I can probably get to the swivel shaft retaining nut from the back.  Removing the seat by removing this one nut will make it much easier to tile that part of the cockpit.  Ditto for the driver’s seat.

Although we got a late start on the bus today, and worked on it for less than four hours, we were satisfied with what we accomplished.  The old tile came up more easily than I thought it would which bodes well for getting the entry/cockpit tiled with the new Armstrong Alterna Luxury Vinyl tile.

I called Phil Jarrell to verify that he had called Miss Dig and told them to mark the gas main and not just the utilities running to the house.  He said he did and expected that they will be here on Friday.  I will keep an eye open for them and intercede if possible.  Phil expects to start our job on Tuesday.  If he does he will probably be finished by the end of the week or over the weekend.

The entry stairs into the bus with the bottom riser cover plate removed to reveal one of the two air-conditioner compressors installed in the spare tire compartment.  This is how the ports are accessed for service and recharging. The other compressor is accessed through the bay under the driver’s seat.

The entry stairs into the bus with the bottom riser cover plate removed to reveal one of the two air-conditioner compressors installed in the spare tire compartment. This is how the ports are accessed for service and recharging. The other compressor is accessed through the bay under the driver’s seat.

Linda let me know that our lab results were available so we each logged in to our HFHS MyChart accounts to look at them.  Linda’s lipid profile showed a higher total cholesterol than she expected and she was not happy about it.  Dr. Vangel had seen the results and commented that they were OK, but Linda was perturbed about it none-the-less.  My total cholesterol was also higher than I would like but not as high as Linda’s.  Her LDL and HDL numbers and ratio looked good and her HDL, in particular, was much better than mine.  This was no doubt a consequence of her almost daily exercise walking.  We apparently do not fully understand the lipid profile numbers or what we still need to change about how we eat to bring them in line with the guidelines put forward by people like Drs. Neal Barnhard and Caldwell Esselstyne.

Linda made a nice salad to start our dinner, served with a small glass of Moscato.  The entrée was a mock chicken scaloppini that she picked up at Whole Foods.  For a side dish she steamed kale with mushrooms, onions, and garlic.  After dinner we sat on the back deck and enjoyed a second small glass of Moscato.

I went to my office and edited the blog posts for July 23 through 31 and hope to upload those posts tomorrow.  I had an e-mail from Molly Pinner with Linda’s invitation to work as an office staff volunteer at the 2016 Escapade in Essex Junction, Vermont.  I replied to that and cc:d Linda.  I then e-mailed Lou and Val Petkus to let them know.  I was wrapping up for the evening when I got an e-mail from Ed Roelle with the September CCO Newsletter.  He develops the newsletter in MS Word and I convert it into PDF for him.  I took care of that and sent it to him and then went upstairs to watch a PBS program on scenic train rides of North America.

The program was interesting but PBS was fundraising again, and the fundraising segments were longer than the programming segments.  It seems like this has been going on all summer and we are, quite frankly, tired of it.  After clicking around the other channels I turned the TV off and went to sleep.

 

2015/07/16 (R) RV Work

We were up at 6 AM and by 6:25 Mara had started the engine of her motorhome to pull in the slides.  She disconnected the electrical cord and we helped her back out of the driveway at 6:40.  She was pointed west so she had to drive to the end of our street and use the circle to turn around.  Her destination was Cummins Bridgeway in New Hudson.  When she made the appointment they said the closer to 7 AM she could arrive the better.  They estimated she would be there 3 to 4 hours.

Mara's Fleetwood Bounder parked in our pull-thru driveway.

Mara’s Fleetwood Bounder parked in our pull-thru driveway.  Linda in green jacket, Mara in red.

Linda did not sleep well last night, a common side effect of eating too much too late in the evening, and went back to bed once Mara was safely on her way.  I decided to stay up and clean the coffee maker before making coffee.

I wiped out the upper housing and cleaned the nooks and crannies with Q-tips.  The upper housing is undoubtedly designed the way it is to make it structurally adequate with a minimum of plastic but it was equally obviously not designed with any consideration for being able to clean it.  Like many things, it leaves me wondering if the designers ever use the products they design or what sort of functional specifications they work from and who develops those.  I think the Bauhaus had it right when they declared “form follows function.”  My guess is that commercial equipment, while less “stylish” than consumer goods, has cleanability and serviceability as primary design considerations.

I remembered that we had a one gallon jug of distilled white vinegar in the bus so I got that and ran eight cups of it through the coffee maker.  I added four cups of water to the used vinegar and ran it through again.  I then ran 12 cups of RO water through the coffee maker.  By the time I was done it was approaching 8 AM so I ground up some of the Sumatra Mandheling beans (not decaffeinated) and made seven cups of coffee.  I normally make 8 – 9 cups but this was full-strength stuff.  I’ve been making 11 cups while Mara is here but it turns out that she does not drink much coffee so I will be back to my usual 8 – 9 half-caff servings going forward.

I enjoyed my first cup of coffee while finishing yesterday’s blog post and starting this one.  I enjoyed my second cup while researching hardware for mounting a small table to a wall so that it is essentially cantilevered, which is the table arrangement we need for the bus.  I found a 2-piece aluminum extrusion that might be the solution for attaching the table to the wall.  It is 30″ long and can be cut to length but I do not think it will not be strong enough by itself to support the table.  I found an angle bracket on Rockler that might be the additional piece I need.  It is 12″ x 18″ with a notched corner, made of 1/8″ steel, and powder-coated black.  A pair of them will support 1,000 pounds so one in the center would be more than sufficient.  An alternative would be a wood strut angling back to the wall but we are not willing to have a vertical table leg.  I have not decided whether the table should be removable but I am leaning towards a more permanent installation.

Linda eventually got up but neither of us were hungry so we did not have breakfast.  I went to my office and ordered the ZioTek monitor mounting system from CyberGuys.  I then e-mailed Ewa at AFC Industries and thanked her for the second quote but let her know that the price was way out of my budget.  I finally settled in to work on the custom desk design for the bus and eventually finished it (I think).  Linda left around 12:30 PM for her dermatology appointment.

Now that we have base station antennas cabled to the ham shack I tend to have the new Yaesu FTM-400DR/DE dual band (VHF/UHF) radio on whenever I am working in my office.  It provides a pleasant diversion from my other tasks and is actually useful.  Somewhere mixed in with everything else were a couple of QSOs with ham buddies and an attempt to coordinate with Steve (N8AR) and Mike (W8XH) about testing my two Morgan lightning arrestors at Steve’s QTH.

This toad was sitting on a rock by our front porch.

This toad was sitting on a rock by our front porch.

Our bus had settled in the rear and was clearly out of level.  The reason it had settled was that I forgot to switch the suspension system to Level Low and shut off the air to the engine accessories.  It was of no consequence but it bugged me so I started it, let it air up, re-leveled it, shut it down, and switched off the batteries and engine air accessories.

Mara returned from Cummins Bridgeway around 1 PM and I guided her back into her parking spot.  They did the routine service on her motorhome engine and generator but found several things on the genset that needed to be repaired.  She agreed to have the work done so they removed the genset from her rig and will reinstall it next Wednesday.  They also inspected the motorhome and gave her a list of other things that needed to be fixed, some right away and some eventually.  She did not have them do any of that work as she wanted me to look at the list first.  The added service work means Mara will be visiting with us for at least another week, which pleased us greatly.

I went over the list with her and we discussed the relative importance and urgency of each repair.  One of the items involved the caulking on the roof so we both climbed up there to have a look.  I also wanted to scope out how we might install her weBoost Drive 4G-X cellular booster system.  While we were on the roof I was able to rock the rig side-to-side quite a bit just by shifting my weight.  One of the other items on the diagnostic list was shock absorbers and I indicated that I thought that sounded appropriate, especially given that the back ones reportedly had cracked/broken mounts.  They also noted that the transmission fluid was low and that the filter and fluid should be replaced.  I encouraged her to have these taken care before she left as Cummins Bridgeway is a very good service facility.

The other items were things that could wait but the caulking of the roof was something Mara could do herself.  She likes to take care of as much of her rig as possible and she will be here through at least Wednesday, so she has time.

Linda got back from her out-patient surgical appointment with bandages in seven different places.  We visited for a while and then I left the ladies and returned to my office.  I started on the design of the pull-out pantry for the bus and quickly realized that the very expensive Fulterer heavy-duty pull-out pantry slide I ordered from Rockler was too wide for the space we have available.  I came upstairs and groused about it for a while until Linda and Mara urged me to try canceling the order.  I called Rockler and spoke to someone in customer service.  I won’t know until tomorrow at the earliest, and probably not until Monday, if I was successful in intercepting the order before it shipped.  If not I will have to pay to ship it back and may have to pay a restocking fee.  Although I do not have anywhere else I can use it at the moment, between the restocking charge and the cost of shipping I may just keep it and find a use for it.

Linda made a large salad for dinner and we chatted during and after the meal.  It had been an early, long, hard day for all of us.  Mara returned to her rig before it was dark and Linda headed off to bed shortly thereafter with me not far behind.

 

2015/07/09 (R) Graduation Celebration

My main focus this morning was my dentist appointment at 10:30 AM.  I wanted to leave the house at 9 AM so I had plenty of time to get there and actually left at 9:15.  Once I was on I-96 eastbound and clear of the construction at US-23 I called the South Lyon 2m repeater and Steve (N8AR) came back to my call.  I-96 was very slow as I approached Wixom Road so I exited at Beck Road and dropped down onto Grand River Avenue (GRA).  I got off GRA at M-5 in Farmington Hills and took that to where it ended and rejoined GRA.  I continued to Telegraph Road and headed south.  My QSO with Steve lasted until there by which point there was too much noise and not enough signal for a pleasant conversation.  In spite of the change from my intended route I was still at the dentist’s office by 10:10 AM and they were able to take me in early.

On the way home I called the South Lyon 2m repeater and Mike (W8XH) responded to the call.  As a result of differing weekend plans I decided to head to his QTH and pick up his climbing harness.  While I was there I took a few minutes to look at his reconfigured ham shack and his Canon EOS D7 Mark II DSLR.  To say that I am unhappy about Sony’s failure to release the alpha 99 II FF DSLT would be a gross understatement and I am not alone in the sentiment.

Back at the house we had a light lunch of sourdough pretzel nibblers and roasted red pepper hummus.  I then went to my office to continue working on the custom desk design for our bus.  But first I was taking care of e-mails when Williston Crossings RV Resort called back and said they had a spot for us for December.  We had not heard back from Suncoast Designers regarding an appointment to have a fogged window repaired so I called them.  They said they had replied to my e-mail letting us know that we were scheduled for December 7 but the e-mail had not come through, so I need to check the spam filter.

Linda called back and accepted the spot at Williston starting December 1st.  We will have to leave for one to three days to have the window taken care of and we will depart on the 26th for the Arcadia Bus Rally but the monthly rate will still be cheaper than paying for three weeks at the weekly rate.  Besides, they did not have a two or three week opening.

I did get a couple of hours of work done on the desk design and then had to quit.  A month ago our elder grand-daughter, Katie, missed her high school graduation due to a sudden illness.  Meghan and Chris (Katie’s dad) made reservations at Zingerman’s Roadhouse for 5:45 PM today and we gathered to celebrate this milestone in Katie’s life.  Brendan, Shawna, and Madeline also joined us and we all enjoyed quizzing (and teasing) Katie about her upcoming college experience at Northern Michigan University where she plans to major in Wildlife and Fisheries within the larger biology program.

Linda and I had the black bean burger with fresh, hand-cut fries.  Although it was tasty, and vegan, it did not have any binders and completely fell apart when I tried to assemble it as a sandwich.  We ordered them on sourdough bread as the buns had an egg wash.  Zingerman’s has excellent bread, but it is the rustic style with crusts that are so tough you cannot cut them with a knife (or a chainsaw).  Thus the “burger” was difficult to eat even as an open faced sandwich and was basically a messy pile of “stuff” on my plate.  Linda seemed to enjoy hers but I regretted ordering it even though I ate the whole thing.  I did, however, have a glass of Schramm’s Raspberry Mead made by my friend, and former colleague, Ken Schramm.  It was excellent.  The hand-cut fries were also good and the waitress was delightful, which is always a plus.

Back home I worked for a couple more hours in my office and then worked on this post.  I put my new N.T.I. dental appliance on my lower front teeth just before going to bed.  It obviously felt a little strange but did not keep me from falling asleep.

 

2015/07/02 (R) 100,000 Radios

We were tired and did not get up until almost 8 AM.  Linda prepared a tofu scramble for breakfast, as we were almost out of her homemade granola, and served it with some cinnamon raisin toast and fresh grapefruit.  It’s the closest thing we eat to scrambled eggs and she serves it as an occasional change of pace from our standard granola breakfast.

I had my annual appointment with my dermatologist this morning at 11 AM.  I needed to pick up a cable from Scott (AC8IL) at Adams Electronics, which was on my way to the Henry Ford Health System (HFHS) clinic, so I left the house a little after 9:30 AM.  The drive was fine initially and I had a nice QSO (chat) with Steve (N8AR) on the South Lyon 2m repeater.  As I was approaching Wixom Road, however, all lanes of eastbound I-96 were stopped.  I was able to exit at Wixom Road and headed north a short distance to West Road which I took east over to Beck Road where Scotty’s business is located a little north of West Road.  I had a brief chat with Scott about the antennas on my tower before I left.

Two miles north of Scott’s shop I turned east on Maple Road (15 Mile Road).  The HFHS has many clinics around the greater Metro Detroit area and my dermatologist is located at the intersection of Maple and Farmington Roads in West Bloomfield.  That should have been an easy trip but there was construction on Maple Road that had the road down to one lane with flaggers.  There were signs advising motorists to seek other routes but I did not heed the warning.  I patiently worked my way through and arrived for my appointment about seven minutes ahead of time.  Good thing I left as early as I did.

My exam was fairly routine and Dr. Nydorf wrote out a prescription for Doxycycline.  I will try taking it (again) three times a week and see if it helps.  I headed straight for home after my appointment but took a different route.  Once I was back at the house Linda went for a walk.  While she was walking I removed the license plate from her car, took the protective (anti-theft) cover off, and cleaned everything.  When it was dry I put the new registration sticker in the corner, reassembled the cover, and installed the plate back onto the car.  I then started working with the various pieces of the new Yaesu FTM-400DR/DE mobile radio.  When she got back from her walk she heated up a couple of tofu hotdogs for lunch.  These are such simple fare but so tasty (with mustard, onions, and relish) and so appropriate for a summertime lunch.  They are also a really easy lunch to get on the table.

After lunch Linda took her car to the Howell library to get some books and children’s DVDs and then stop at the Meijer’s supermarket to pick up a few grocery items for Madeline’s visit this weekend.  While she was running errands I assembled our new Diamond X-300NA antenna.  Once it was assembled it was over 10 feet long so I stored it by mounting it to the side of the tower.  I put it up as high as I could reach from the ground to get the three counterpoise (elevated ground plane) rods above eye level.  Moving it to the top of the tower as a replacement for the Diamond X-50NA will have to wait until next week or later.  The exact timing will depend on the weather, Mike’s (W8XH) availability, and whether I have acquired appropriate standoffs by then for the X-300 antenna and/or the cellular booster omnidirectional antenna.

With the antenna taken care of (for now) I disconnected the coaxial cable for the X-50 from the radio side of the lightning arrestor and positioned it so I could pull it back into the sump pump room.  From there I fed it into the ham shack, disconnected it from the radio, and coiled it up.  I uncoiled the new 20′ LMR-400 cable with the N-male connector end positioned so I could feed it through the corner of the ceiling in the ham shack (by the ground wire) and into the sump pump room.  From there I fed it through one of the 2″ conduits into the cable entry box.  Back outside I shaped the cable (LMR-400 cable is double shielded and stiff) and connected it to the radio side of the Morgan VHF/UHF lightning arrestor and closed the lid on the box.

Back in the ham shack I attached the PL-259 connector to the SO-239 socket on the back of the Icom IC-7000 GoBox.  I could have gotten away with a 16′ cable but the 20′ length gives me more flexibility with respect to equipment placement.  I turned on the IC-7000 but did not hear anyone on either the South Lyon 2m or the Novi 70cm repeaters so I turned it off.

I disconnected Mike’s Icom IC-2820H and set it aside to make space for the new Yaesu FTM-400DR/DE dual band mobile transceiver.  I moved the new coax to the new radio, powered it up, spent a few minutes configuring some basic things, and then listened to the South Lyon and Novi repeaters.  I tried calling them but was not triggering them so I knew the PL Tone was not set correctly.  I called Mike for assistance and left him a voice message.

Linda was back by this time so she came down to see the new radio.  We then went out to the bus to make our final decisions about upholstery fabric and window shade materials.  In the end we chose the Lambright Notion Linen fabric for all four chairs and the MCD B50 material for the dark out shades.  We brought all the samples back in the house and I e-mailed our choices to Josh at Coach Supply Direct.

I had an e-mail from Scott Neader (KA9FOX) at QTH.com requesting an admin login for the SLAARC WordPress website so I set that up and e-mailed him back.  I had the new radio on and was listening to a conversation on the Novi repeater.  It had just concluded when Mike returned my call.  He walked me through how to set up the PL Tone and Squelch Tone for both of the repeaters on the FTM-400.  We were then able to verify that the radio was working on both bands.

For dinner Linda made a salad and pan-grilled tofu with caramelized onions and barbecue sauce which she served open-faced on hamburger buns.  We had watermelon for dessert, which we have been doing a lot this summer.  I did not care for watermelon as a child but it has become a favorite summertime treat.  I had dropped a small lock washer while mounting the new antenna to the tower earlier so I went to Lowe’s to get a replacement and some spares.  On the drive there I got a call from XPO Delivery Service letting me know that the new refrigerator for the bus would be delivered to Chuck’s shop in Novi tomorrow between 6 and 8 PM.

At Lowe’s I picked up some 6mm x 1.0 Nylok nuts in addition to the lock washers.  I also got some grass seed patching mix, a few more bags of decorative broken brick pieces, and a hummingbird feeder with a red reservoir so Linda can use sugar water without red food coloring.  When I got home the odometer on my car read 100000 so I took a picture of it with my phone.  I then spread the patching mix over the bare dirt I had used to fill a hole and troughs left by the installation of the natural gas line to our house last September.  The rest of the evening Linda read and I worked on completing drafts of blog posts.

 

 

2015/06/23 (T) Grounded

As I wrote in yesterday’s post we did not turn off the lights last night until almost 1 AM because we were keeping a close eye on the weather moving across the lower portion of Michigan’s Lower Peninsula.  Although strong to severe storms were still forecast from 1 AM to 5 AM they either did materialize at our exact location or we slept through them.  We had the house closed up and the air-conditioning on, so that cut down the sound level of outside noises.

A cold front had pushed through by sun up and we woke to a cool morning with blue skies and noticeably lower humidity.  We did not have any trees, or even big limbs, come down and there was no damage to our brand new roof.  The forecast yesterday was threatening enough, however, that in the morning we took the potted plants, and as much of our outside lawn furniture as we could find room for, inside including our sun umbrella and trash cans.  I planned to be gone most of the day, and Linda was leaving mid-afternoon to go to dinner and a movie with Diane Rauch, so our first chore was to put all the lawn furniture, plants, and other outdoor stuff back outdoors.

This week is mostly being devoted to ham radio with the ARRL Field Day as the crowning event this weekend.  My specific focus for most of the week, however, has been the “communications tower” adjacent to the east wall of our house.  As described in previous posts we installed a cable entry box (CEB), mounted the cellular booster in the basement, mounted the inside cellular antenna, and ran coax cables.  The antennas will (hopefully) be mounted on the existing 40 foot tower tomorrow, cabled into the CEB, and cables run from there to devices inside the house.  With any luck by the end of the day tomorrow we will have decent cellular service inside the whole house, the ability to watch OTA TV programs on two different TV sets, and finally be able to connect one of our radios in the ham shack to an antenna.  Today, however, was planned to mostly address other things.

I had an appointment with our dentist at 10:20 this morning and left at 9 AM.  I planned to stop at Chuck’s bus garage and check that the key he lent me worked, but I needed gas for my car.  I did not have time for both and did not really have a choice; I would have to check the key some other time.  I ordered two cables yesterday from Scott (AC8IL) at Adams Electronics.  Later in the evening I was unsure if I had specified the connectors correctly so I called and left a message.  I called again this morning to make sure the message got through.  It did, and my original connector specifications were correct.

I arrived at the dentist’s office about 10 minutes before my appointment time.  I called Rick Short at Isringhausen USA to make sure he was going to be in before I drove two hours to Galesburg, Michigan after my dentist appointment.  I got his voice mail a left a message.  “ISRI” makes very high tech air suspension driver’s seats that are used as original equipment in motorcoaches, semi-tractors, heavy equipment, and locomotives.  I would really like one for our bus, but it is not proving easy to get.

Dr. Steve and his assistant, Leslie, made molds of my upper and lower teeth and a bite impression.  The molds will be used to make a mouth guard that I can wear while I sleep.  Dr. Steve has a strong suspicion that I am clenching my teeth and the mouth guard will reduce or eliminate the irritation it causes.  I will have to ask if I can wear it during the day too as I am occasionally aware of clenching my teeth while I awake.

I had not heard back from Rick by the end of my appointment so I called the main number at ISRI and talked to the receptionist.  It turned out that Rick was not in today and she transferred me to Jeff Woodworth.  Jeff was willing to meet with me but thought it would be a better use of my time to wait until Rick was available.  My next opportunity to drive to Galesburg will be Thursday and I will likely go as the ISRI seat is holding up our ordering of Flexsteel seats through Coach Supply Direct.

I stopped for coffee and then re-routed for Chuck’s bus garage in Novi.  The key to the garage worked perfectly.  I called Linda to let her know about the change in plans and headed for home.  There is too much to do at the moment to waste much time so I installed the #4 AWG bare copper ground wire I bought yesterday at Lowe’s.  I mounted an offset copper wire lug using the center support stud for the copper back plane in the CEB.  I replaced one of the plastic hole plugs with a rubber plug with a small hole in the center.  The hole I chose in the bottom of the CEB allowed the ground wire to come straight up into the lug.

Another view of the cable entry box on the east end of the house by the 40-foot tower.

Another view of the cable entry box on the east end of the house by the 40-foot tower showing the bare copper ground wire that runs to the ground rod and then to one of the tower legs.

Outside the CEB I routed the ground wire around to the existing ground rod and secured it using the new clamp I bought yesterday.  There was an old ground wire connected from a clamp on the tower to the ground rod.  I removed that wire along with some coax and control wires that I had clipped when we removed the old satellite dish.  I then attached the new ground wire to the clamp on the tower.  While we were at it Linda trimmed back a small bush that was growing between the tower legs and I pulled leaves, grass and other stuff out from around the Day Lilies that we transplanted last year around the tower base.

With the CEB grounded we looked at how we might get a video cable up to the TV/monitor in our bedroom.  The wall where the TV is mounted has a hot water baseboard radiator that comes almost to the trim on the door wall.  That end of the radiator has a copper pipe that goes through the floor into the basement and it was easy to locate the pipe in the basement.  I determined that there was enough space behind the pipe to safely drill a hole but I had to drill it from the top side at an angle.  A 5/8″ wood boring drill bit created a hole just big enough for the molded F-connector on the end of the cable to pass through.

We fed the video coax cable above the suspended ceiling in the ham shack area to the location of the hole.  I then fed the cable up from the basement as Linda pulled it up into the bedroom.  We adjusted the amount of cable in the bedroom to allow the wall mounted TV set to move through its entire range of motion.  The other end of the cable was then routed into the sump pump room.

By the time we finished pulling this cable it was 3:30 PM and time for Linda to leave to pick up Diane.  They were headed to Royal Oak for dinner and a movie as the movie they wanted to see was only showing at the Royal Oak Main Theater.

While I was out during the morning Lynch Carpet had called to let us know our Armstrong vinyl tile was available for pickup so after Linda left I closed up the house and went to get it.  The 12 boxes of tiles, container of vinyl adhesive, and container of vinyl grout were all neatly arranged on a small pallet and tightly wrapped in shipping plastic.  Rather than break this down and load each thing individually they used a fork lift to set the pallet in the back of my Honda Element.  The rear suspension settled at least two inches when they transferred the full weight of the pallet to the floor of my car.

When I got back to the house I backed the car up to the garage.  I cut the shipping plastic loose and unloaded the tubs and boxes of tiles.  I put the pallet on the garage floor and then neatly stacked the boxes of tiles on it to keep them off the floor.  Each box contained 14 tiles measuring 16″ by 16″ for a total area of 24.89 square feet.  The Armstrong Alterna tiles are a “luxury vinyl” product, and are about 1/8″ thick.  Even so, the boxes were heavier than I expected so I decided to weigh one.  It tipped the scale at just under 42 pounds.  That meant the entire pallet weighed close to 500 pounds, and, ignoring the weight of the cardboard box, that is about 3 pounds per tile.

When I drew out the design I determined that I would need 158 tiles, some of which would be partial.  Figuring conservatively at 150 full tiles equivalent, and ignoring the weight of the underlayment, adhesive, and grout, the floor tiles will weigh about 450 pounds.  I have no idea what the carpet and ceramic tile that I have removed weighed but the tiles were heavy.  I also have no idea what the furniture weighed that we have removed but also have no idea what the new furniture will weigh.  The intent was that the new floor and furniture would weigh less than old stuff but we will see.

I traded phone calls with my dad and we finally got to talk for a half hour starting at 4:30 PM.  He turned 90 this past Sunday.  Mike Fearer from Bid-Rite Concrete called at 6 PM and arrived about 10 minutes later to discuss the foundation for our 70 foot ham radio tower.  I had printed off a page from the Universal Tower website showing their tower base.  I also downloaded and printed their base and tower installation instructions.  I had a set of these to give to Mike so he would have some idea of what the project is about.  We looked at the proposed location for the tower and access for his dump cart.  We also talked about the base, a rebar cage, a form around the top of the hole to allow the concrete to be slightly above ground, and a jig to make sure the base is level and the tower is plumb.

He said he was interested in the job and would work with me and Phil Jarrell (the excavator) to get it done.  Rather than bid the job he would just do it for time and materials.  He also said the current price of concrete was about $100 per cubic yard.  We will need about six (6) cubic yards to fill the required 5′ x 5′ x 6′ (deep) hole.  He thought he might be available the middle of next week but I don’t think I could have everything pulled together that quickly.

After Mike left I went to Lowe’s and picked up five 40 pound bags of topsoil, a 1-in/2-out signal splitter (rated for 5 MHz to 2.4 GHz), and a plastic snap cover channel for hiding the video cable we ran up into the bedroom from the basement for the TV set.  I then went to the Meijer’s supermarket just across Grand River Avenue for soy creamer but they did not have what I was looking for.  As long as I was there I had a salad for dinner at the in-store Subway.

While I was sitting there I called Mike Sharpe (W8XH) to confirm that he was available tomorrow to help with the antenna installations on our 40 foot tower.  I mentioned that the only thing I lacked was a standoff with a pulley at the end of it for hoisting stuff up to me.  He suggested that something like that was essential and I agreed, so I headed back to Lowe’s to see what I could figure out.  What I ended up with was a three foot long 7/16-14 threaded rod, a pulley that had a closed eyelet on top (and was big enough for the 3/8ths rope I bought), some 7/16ths washers, and some 7/16-14 nuts.

When I got back to the house I unloaded the topsoil near the part of the east yard that needs to be filled in, took the other stuff inside, and then assembled the threaded rod pulley system.  I secured the pulley on one end of the rod using two of the nuts, one on either side of the eyelet.  I threaded a nut onto the other end, put on two washers, two nuts, two more washers, and another nut.  I ran the first two nuts, with two washers between them, part way down the rod.  I left the second pair of nuts, with washers between them, near the end of the rod.

I took the assembly out to the tower and adjusted the position and spacing of the two pairs of nuts and washers so they would bracket two of the horizontal tower members.  In use I will secure the rod to the tower at each pair of nuts/washers using plastic cable ties.  This arrangement will put the pulley at least 18″ from the tower which should be far enough out that we can hoist the DB8e OTA TV antenna to the top of the tower without it banging into the tower or hanging up on something.  This antenna is the largest thing we need to hoist up. The old TV antenna is considerably larger and heavier, but it is coming down via gravity.

There was a message on our answering machine from Linda’s sister, Sr. Marilyn, who lives in St. Louis.  She was listening to the news earlier today about the storms that went through our part of Michigan and wanted to make sure we were all OK.  By the time we finished talking it was dark and I was done working for the day.  Linda called shortly thereafter to let me know she was on her way home and I mentioned the call with Marilyn.

I finally opened the box with the vertical omnidirectional outside antenna for the cellular booster system and discovered that I should have opened it sooner.  The mounting bracket was designed to be mounted to a vertical surface, such as the side of a house, not a tube, such as a tower leg.  I did not want to postpone tomorrow’s tower work so I will have to get up early and figure out a way to adapt the existing bracket so I can mount the antenna to the top of the tower.

My initial thought was that an aluminum U-channel of the correct size might solve the problem very nicely.  I could drill two holes in the bottom of the “U” to match the two holes in the bracket.  I could then drill three pairs of holes through the sides of the channel.  The antenna would be bolted to the bottom of the channel.  With the open part of the channel held against a vertical tube I could secure it with three long plastic cable (zip) ties.  Conceptually it should work and be easy to fabricate, but will take time which I won’t have a lot of in the morning.  We have to get the two coax cables from Scotty (AC8IL), drop off my car at Brighton Honda for its 100,000 mile service, and be back in time to have the mount fabricated and all of the antennas and tools ready to go by 10:30 AM when Mike shows up.

Linda got home at 9:45 PM, earlier than she thought she would when she left.  She and Diane ate at Luigi’s and had a very nice meal.  They also enjoyed the movie.  We had a big day on tap for tomorrow and we asleep by 10:30 PM.

 

2015/06/08 (M) Home for a While

It rained until well after midnight last night.  The rain was not steady but more in the form of heavy downpours associated with thunderstorms.  The gutter along the rear of our house was not able to handle the volume of water and it was spilling over onto our deck making a sound that we are not used to.  I noted that I should check the gutters for clogs at the downspouts today.  My phone chirped, which meant I had an e-mail, and I presumed it was from our whole house generator.  When I got up this morning the clocks on the microwave and range were flashing “2:06”, so my first thought was that we must have taken a power hit then, but the messages on my phone indicated that utility power had been lost and restored around 3:45 AM; at least that was the date/time stamp on the e-mails.  I got up just before 6 AM and finally figured out that the clocks probably reset to 00:00 when the power blipped (3:45 AM + 2:06 elapsed time = 5:51 AM).

I sat in the living room writing with my iPad and playing games until a little after 7 AM and then made coffee, which got Linda out of bed.  We had planned to empty out more of the bus today but the weather was gloomy and we were tired from the rally so we had a long, leisurely morning before busying ourselves with inside chores.  Linda worked at her desk and I wasn’t in the humor to work downstairs in my office so I set my computer up on the dining room table.  Other than an occasional trip to the bus or the garage I mostly sat in front of my computer and talked on the phone all day.

Linda called Alchin’s, our regular trash collection company, to see if they would pick up the old RV furniture.  They do not have a special truck they can send and could not take the steel furniture even if they could get it into their garbage truck.  Linda suggested we find a company like “Got Junk” and searched online for one in the area.  We decided to call “Chuck It Junk Removal” as they are located relatively close to our house.  Keith, from Kish Lawn Care, showed up around 11 AM to cut the grass and Brad, from Chuck It Junk Removal, showed up around 12:45 PM to look at the furniture and flooring we pulled out of the bus and give us a quote on the cost to haul it away.  As Keith was finishing mowing the grass dark clouds were rolling in from the west and not long after he left we had more rain, although nothing like last night.

My dentist thinks my current intermittent teeth issues are the result of clenching my teeth at night so I made an appointment to get fitted for a mouth guard to wear while sleeping.  I also got hold of Phil Jarrell and he decided that tomorrow morning at 8 AM would be a good time for him to stop by and take some elevation readings for the driveway extension and a French drain for the far west end of the property.  Besides the obvious economy of having him do both jobs while he is on site, we need a place to put the topsoil he will dig out for the driveway and we need topsoil to fill in low spots on the west end of the yard.

I managed to finally get some orders placed today.  The big one was for a SureCall Fusion5s multi-band cell phone booster (transceiver) system from Cellular Solutions in Mt. Pleasant, Michigan.  The other was for a window seal from Prevost.  This is not the seal that holds the glass in the frame but rather a large rubber part that seals the space between the window frame and the structure of the coach.  We may need to unlatch the large fixed window on the passenger side and use it to get the old refrigerator out and the new one in.  This window frame has not been opened since we bought the bus and may not have been opened for many years before that, possibly not ever since the bus was built.  I want the new seal on hand in case the current one gets damaged trying to open the window frame.

Besides these two purchases I talked to someone at A-1 Upholstery and described our home made sofa plans.  She suggested that we would need ~9 yards of 54″ wide material for the sofa seats and back cushions.  I sent an e-mail to Josh at Coach Supply Direct reminding him of some things we had discussed at the rally last week and Rick Short at Isringhausen with questions about their 6800 series bus driver seats.  I also finally got to talk to Mike at Suburban Seating in New Jersey.  As I suspected we cannot buy the seat directly from ISRI, but I may be able to order it through Suburban Seating and pick it up from ISRI USA in Galesburg, Michigan.  That would be much nicer than having it shipped to our house on a truck from New Jersey.

I called Rupes/Cyclo to try to get answers to a few questions about the Cyclo 5-Pro Mark II Dual Head Orbital Polisher and its various pads but could not figure out how to talk to a real person.  I submitted the online Contact Form with my questions and got a speedy reply from Cory as a result of which I now know what to order.  All I have to do is figure out how many of each thing I need.  The Cyclo 5 is available on Amazon Prime, by itself, but it did not appear to be the Mark II model.  Some of the major distributors claim to give you a set of “free” ProGuard Orbital Backing Plates, but the Rupes/Cyclo website clearly states that the polisher is not sold without one of the three head options.  I prefer not to patronize businesses that misrepresent their offerings and will probably order the polisher, pads, and chemicals directly from Cyclo even if I am paying MSRP.

I got a call from Gary Hatt at Bus Conversion Magazine.  I had not looked at or replied to e-mails in over a week and he wanted to make sure everything was OK.  While we were talking we got a call from Curtis Coleman of RVillage so Linda took that initially until my other call was concluded.  I had e-mailed Curtis earlier in the day and he was responding to that communique.

Somewhere in the middle of all that we had chickpea salad on a bed of greens for lunch.  Linda then went for a walk, met Chris (K8VJ) at Lowe’s to pick up some SLAARC mail, and roasted vegetables for our dinner when she got home.  I sent Chuck Spera a short e-mail inquiring about how to open the latches on our emergency escape window and then called it a night.

 

2015/05/13 (W) Dental Deconstruction

We were both up at 7:30 AM.  I made tea instead of coffee and we had a light breakfast.  We both had 11 AM appointments with our dental hygienists and left a 9:35 AM to drive to Dearborn.  We had only gone a couple of miles when we realized we did not put the trash can at the curb so we went back and did that.

Traffic was light and we arrived at Gusfa Dental at 10:50 AM.  My hygienist, Michelle, took me in right away.  Linda’s hygienist, Margaret, took her in on time.  We both had good checkups with no new issues found or procedures required.  The tooth that has been bothering me occasionally all winter may be the one on my upper left, second from the back, that had the root canal last fall, followed by a crown.  Dr. Steve did not see any problem on the x-Rays or exam but said that my various complaints could all be associated with a small but persistent infection at the base of the root canal.  I am due for a 6-month follow-up visit with the endodontist anyway, and was putting off scheduling it until I had my regular checkup today.

It was 12:30 PM by the time we left the dental office and we were both hungry.  We wanted something other than fast food but considered going to Neehee’s Indian diner on Ford Road.  We decided not to go there as it was not very good the last time we went and they had changed the menu, eliminating some of our favorite dishes.  It is also several miles west of I-275 and that stretch of Ford Road is always congested and annoying to drive.  We stopped at the Macaroni Grill at 7 Mile Road and Haggerty Road instead.  We have always found the Macaroni Grill restaurants to be acceptable Italian food in a slightly quaint setting.  Today was no different.  Linda had rigatoni with arrabbiata sauce (spicy tomato), garlic, mushrooms, and spinach.  I had capellini with garlic olive oil and the same add-ins.  We had our fill of fresh baked bread to go with the pasta and were very full by the time we finished lunch.  We used to eat like this a lot more often which is part of the reason we both had a weight problem.

We thought about stopping at Brighton Ford to pick up some literature on the F-150 but decide to drive to Lowe’s at I-96 and Latson Road instead to look at refrigerators.  The smallest one they had on display was 14.3 cubic feet which gave us a chance to see the approximate size of the 13.5 cubic foot Fisher & Paykel.  The F&P is narrower and slightly taller than the one’s at the store, but has a bottom freezer drawer and fits our available space much better.  Lowe’s can order the F&P and it will take two weeks to get.  If I decide to do the fridge swap at Butch and Fonda’s place in Indiana we will have to pick up the F&P in Kokomo as that is the nearest Lowe’s.

Driver side sleeper sofa in our H3-40 with motorized drawer removed.

Driver side sleeper sofa in our H3-40 with motorized drawer removed.

When we got home I changed into my work clothes and worked in the bus.  After emptying the drawer under the jack-knife sofa and removing the APC UPS from under the foot rest area I removed the drawer, footrest cover, and front end panel.  I then removed the two HVAC duct transition boxes and then the two drawer slides.  With all of that out of the way I was finally able to remove the four 1/2″ lag screws from the four corners that secured the sofa to the floor.

Driver side sleeper-sofa with forward end panel and HVAC adapter box removed.

Driver side sleeper-sofa with forward end panel and HVAC adapter box removed.

Getting all of the furniture out will be much easier if we remove the front passenger seat so I worked on that next.  I had never looked carefully at how it was installed until now.  The chair has a 12″ wide x 15″ deep base plate that is bolted to the floor.  The bolts stick up from below and the nuts go over them.  I could not see the studs but I could feel the ends and eventually realized that Royale coach had installed the carpet OVER the base plate.  To remove the seat I would have to remove the carpet or at least cut it and fold it back.  The carpet had to come out eventually anyway and be replaced with vinyl tile so I removed it.  It was more work than it sounds, and took quite a while, as there was not a lot of room to work under, behind, or to the left of the seat, but I got that piece of carpet out.

Villa passenger seat in our H3-40 showing inside edge of mounting plate and studs with nus.  (Front of coach to the left).

Villa passenger seat in our H3-40 showing inside edge of mounting plate and studs with nus. (Front of coach to the left).

Removing the seat will now be a simple matter of loosening four nuts and lifting it off the studs, except for the fact that it is heavy.  The studs are presumably the threaded ends of T-bolts with the “heads” in two channels, front and rear, that are installed across the floor.  There is an opening at one end of each channel that allows the T-bolts to be inserted/removed.  My presumption is that all of this is Prevost factory designed and built, not something Royale Coach did, but the driver’s seat does not appear to be installed the same way, so maybe not.

Power base for Villa passenger chair in our H3-40.  This thing is complicated!

Power base for Villa passenger chair in our H3-40. This thing is complicated!

I finished working in the bus around 7 PM, put my tools away, and closed up the coach.  As a consequence of our big lunch we were not hungry and skipped dinner.  I called Butch to discuss the project and get some advice.  I then called Chuck and brought him up-to-date.  We finished the evening by watching Season 2, Episode 3 of Sherlock on DVD.