2014/07/24 (R) Back To Work

We were up earlier than normal.  Linda went into the bakery today and likes to be on the road ahead of the worst of the morning traffic rush.  Since she was working I figured it was a good day for me to also do some paid work (plus a couple of loads of laundry).  Earlier in the summer I agreed to write assessment items for some of the modules in the Michigan Assessment Consortium professional development series on Common Assessment Development.  The items are needed for use with the Lectora platform, which Bill Heldmyer at Wayne RESA is using to re-package the modules.  These are modules that other team members developed, so I have to spend some time with the content before I can write the items.

I did some work on this in June and then got busy with contractors and out-of-town trips.  I am still tied up with construction, contractors, and other projects but a timely completion for this work would be early August so I spent much of today working on it.  I already had one module done and hoped to finish the other six but only managed to complete three of them.  I am anxious to get back to work on the HVAC prep in the garage but I plan to continue working on the assessment items tomorrow as I would like to e-mail them to the team for feedback before the end of the day.

I have a lot going on at the moment.  I like being busy, but this is starting to feel like “work.”  I have a growing list of “must do” bus projects that I have yet to start:  1) fogged window replacement; 2) auxiliary air filter / water separator replacement; 3) Aqua-Hot expansion reservoir replacement; 4) Aqua-Hot exhaust leak repair; 5) motorized windshield shade repair; 6) finishing the installation of the ZENA power generator (for charging the house battery bank while driving), and; 7) redoing the water bay (that’s a big one).  I have an optional project to replace the rear view camera system.

Butch is building new ride height linkages for his bus and wants to build some for me as well, so that makes nine “bus projects” I would like to accomplish before the weather turns too cold to work outside.  Some of these are projects I can do with the bus in front of the house once I can move it back into its normal parking spot.  The rest are things I will work on once I get it down to Butch and Fonda’s place in Twelve Mile, Indiana, probably this September.

The FMCA education committee work is ramping up and I have three websites I am trying to launch, one of which has an August 11 target date, plus our own website/blog to maintain (as of this writing I am over two weeks behind on blog posts).  I am also supposed to be writing a “featured bus” article for Bus Conversion Magazine on Marty and Pat Caverly’s MCI MC-5B conversion “Scooby Doo & Bookworm.”  It’s a great conversion that has taken 20 + years to build and will be the cover/centerfold story when it is published.  I have 1,500 photos from Marty and the only way I will make sense of the project is to sit down with Marty, select images, and make notes.  Once I have a sense of the chronology of the work, and the images to illustrate it, I can weave the words together to tell the story.

Kyle and Spencer were here working on the landscaping for most of the day.  Steve stopped by in the morning to go over the work from yesterday and outline the work for today.  It’s coming along, albeit much more slowly than I think it should.  For a job that requires a lot of manual labor we normally only have two guys on site, sometimes three and sometimes only one.  And, sad to say, they simply do not work as hard and as persistently when Steve is not here.

Linda got home ahead of the afternoon traffic.  We had leftover potato and lentil curry and naan for dinner and both the dish and the bread were still excellent.  A few black grapes and dark, sweet cherries for desert and we were off to bed early.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.