We ran the air-conditioner all day yesterday and well into the evening. It cooled off into the mid-upper 60’s overnight so we turned the A-C off when we got up this morning and opened up the house.
Ron and Mary were mostly packed before breakfast. We all had some of Linda’s yummy homemade granola with fresh blueberries for breakfast and everyone agreed it was superior to any store-bought granola they had ever had. We visited until 9 AM and then helped them load their car for the trip back to Pennsylvania after an all-to-short visit. Still, it was nice to see them for the time they were here and they got to see our grand-daughter for the first time and chat briefly with our children. They had a nine hour drive ahead of them, plus or minus, depending on traffic, construction zones, and number/length of stops. The day was forecast to be sunny and very warm, with a high temperature at our house of 90 degrees F, but with no precipitation along their route.
Only one landscaper (Spencer) showed up this morning around 10 AM. Steve had some hand work for him to do. I checked to see that he had water and he assured me that he brought plenty to drink. With the outside air temperature rising, we closed the house up and turned the A-C on.
We were both surprisingly tired but wanted to get something useful accomplished today. Linda worked at her desk while I cleaned the concrete driveway leading up to the garage from the street. The landscapers have been using the driveway to stage some of their bulk materials such as crushed limestone and egg rock. They got all of that material moved to other parts of the yard over the weekend but there was a layer of dust, small rocks, and other debris left behind. I swept most of it off the driveway with a large push broom and then finished the job with a leaf blower.
There was a lot of crushed limestone left so over the weekend I had Steve push it into a 8′ wide by 15′ long parking pad 4″ – 6″ deep off the west side of the driveway and adjacent to the woods that run along the road. The pad still had tracks in it from the excavator treads so I raked those out, filled in some dirt around the edges of the pad, and tamped the edges down. The pull-through driveway from the front stairs to the concrete driveway was also rutted from the Bobcat front-loader being driven on it so I raked that out as best I could. By the time I was done it was noon, it was hot, and I was sweaty and thirsty. I decided I’d had enough for the day, closed up the storage container and garage, came in, and drank a bottle of ICE brand water. This water is lightly carbonated and lightly fruit flavored, and I find it very refreshing.
I had a phone message yesterday from Darryll of DCM Heating and Cooling with some information I needed in order to prepare the corner of the garage for the library HVAC unit. There were a few things I still needed to know, so I put in another call to him and left a message. For lunch Linda served the left over salads from last night’s dinner along with hummus and chips. We sat on the back deck for a while enjoying the slight cooling effect of a warm summer breeze, but eventually went back inside to escape the heat.
We did not do much the rest of the day. I apparently broke our grandfather clock on Monday while winding it and spent a little time looking for information online. I found a Sligh manual that included some troubleshooting tips but did not get as far as trying to diagnose and fix the problem. We were both tired and took naps in the late afternoon. That was unusual for us but could easily become part of our daily routine, especially on hot days like we had today.
I worked on bus barn drawings while Linda prepared dinner. I then called John to see if I could borrow his chop saw and if he had time to look at the drawings. Linda went along and visited with Diane. We stayed until almost 10 PM.