2014/07/26 (S) Climbing Ladders

We did not go to our usual ham radio breakfast in South Lyon today so I could get an earlier start on the construction work in the garage.  Before I even got started I got sidetracked by a small rain gutter project which led to further gutter projects.

I bought a downspout elbow yesterday and wanted to get it installed before the next rains, which are forecast for tomorrow at 20% in the early morning riding steadily to 90% by 6 PM.  The elbow is a replacement for a short straight downspout section that feeds water from the end of one gutter into a slightly lower gutter that is perpendicular to the first.  The second gutter has the main downspout at one end.  Rather than dumping water straight down into the lower gutter, the elbow will direct it towards the lower gutter drain hole and away from the house.  A picture would make this much clearer, but I did not take one.

While I was installing the elbow I noticed that both gutters had a lot of “stuff” in them and the wire mesh drain hole grates were mostly clogged.  I cleaned all of the gutters last year, although I do not remember exactly when.  I expect a certain amount of organic material to accumulate in the gutters—the house is surrounded by trees after all—but I was surprised by the amount of granular material that had washed off of the shingles.  There was a lot of granular material last year, which I assumed had taken many seasons to accumulate, and I had flushed all of it out of the gutters with a hose.

The guy who inspected the house when we bought it said the roof was “serviceable” without being much more specific.  I suspect it is approaching the end of its useful life, but is not a project we can take on this year.  We have a ranch house with a low pitched roof, probably not more than 4-in-12.  It would take me several weeks to roof it myself, but it’s something I am (still) capable of doing.  Perhaps next summer, after we build the barn.

Given the condition of these two gutters I decided to check/clean all of them.  In the process I found that the gutter on the front of the house had three mounting screws loose at the west end.  I tightened them up, completing my unplanned roof tasks for the day.

There are several interesting things about “small construction projects.”  One is that they seem small because you can conceptualize the outcome and visualize all of the major steps quickly and easily.  Another is that you assume they aren’t going to cost very much; they are, after all, small projects.  Having been educated and worked as an engineer at one point in my life I tend to design things rather than jump right into the building phase.  The design phase is where I usually get my first reality check as I start to consider all of the details of the project that I was not able to quickly and easily visualize.  The next reality check comes when I am finally ready to build, which means cutting and fastening wood, only to realize that I have many days of other tasks I must complete first.  The tricky part of construction is that stuff has to be done in a certain (correct) order.  If not, you end up having to deconstruct something and then reconstruct it, or engineer an entirely different solution which takes even longer and costs even more than what you planned to do in the first place.

So even though I worked all day I did not build the platform.  Here’s what I did instead:  removed some drywall to expose a wire that was a little too short to get the sheathing into the new sub-panel; installed an outlet box and duplex outlet using the old wire and ran a new wire to the panel; filled out the panel with circuit breakers I will eventually need for new or rewired circuits; patched holes in drywall; cut and installed two studs in the north wall to provide 16″ on center spacing for new drywall; bored holes through the new studs for an old wire; installed a switch near the rear garage door fed from the old wire; ran a new wire for a new outside light; went to Lowe’s and purchased a 36″ exterior grade door (steel), a fold-down ladder for the garage attic, an exterior LED light fixture, and a light fixture for the new utility closet; enlarged the garage attic access opening from 22.5″ x 45″ to 22.5″ x 54″; read and pondered the installation instructions for the fold-down ladder; and decided to call it a night.

Somewhere in all of that we had orange/grapefruit juice, Teeko’s Sweet Seattle Dreams coffee (a blend that Jeff does just for us) and Linda’s homemade granola for breakfast; tofu hot dogs for lunch with sweet cherries, and; vegan Pad Thai for dinner that Linda made from scratch.  The Pad Thai was a complicated dish but Linda’s efforts really paid off; it was outstanding.

By the time I showered, worked on this post, and caught up on some blogs I follow it was time for bed.  I was tired but, having exerted myself physically and mentally and accomplished tangible things, it was a good kind of tired.  I no longer climb corporate ladders.  Today I was up and down real ones.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.